of installation.
• Responsible for purchase orders, value engineering and redesigning systems for
constructability, field layout drawings & coordination, material procurement, RFQ’s, and
other usual daily activities required of Project Managers and project engineers.
• Build & equip field mechanical teams
• Crew assignment & supervision, to hire & fire mechanical field personnel.
• Basically responsible for the entire mechanical portion of the project.
Static Electric, Inc.’ Williams, AZ Jan 2005-Sept 2006
Project Manager
• Project design & management & implementation.
• Scheduling, bidding & estimating
• Crew management & material procurement.
R & R Constructors, Inc., Fallbrook, CA June 2002-Jan 2006
Project Manager & Estimator
• Estimating & material takeoff.
• Scheduling and Customer service.
• Project designs & drawings. Submittal & review.
• Material procurement & crew management.
J. R. Filanc, Waste Water Treatment, San Marcos, CA May 2001-June 2002
Mechanical & Piping Engineer
• Specialized in the piping & mechanical aspect of wastewater treatment plants.
• RFI’s RFD’s, RFQ’s, submittals, Change Orders, Spec & plan review, & redesign.
• Material Procurement, Field layout & coordination.
Coordinate with city officials & engineers, Road closures & traffic control plans.
Training Cert., AGC storm water & erosion control Seminar., Calif. State General
Contractors Lic. Proficient in; AUTOCAD, QuickBooks, MS Office suite, SureTrack,
Pro Est, Timber Line and Primavera. Journeyman electrician, framing, drywall,
roofing, concrete
Recent Salary-upon request
References-upon request.
Project List for Water and Wastewater treatment.
• Pre-Construction assessment Garnet WTP, Bakersfield, CA $69mil water treatment plant
expansion. Was responsible for constructability review for piping & mechanical
systems, design review and materials and methods, including preliminary scheduling &
coordination with the Mechanical General Superintendent for equipment and labor
forecasts.
• Victorville wastewater treatment expansion phase 1. a $30mil expansion to the
existing plant. expansion to 15.5 MGD
• Victorville wastewater treatment expansion phase 2. A $27 mil expansion to the
existing plant & integration with phase 1. Expansion to 18 MGD
• Regional Plant #5 Design Build for IEUA. A $75mil Design build of a 15 MGD plant in
Chino CA
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.