Objective: To obtain a professional surveying position as a Project Manager/Survey Party Chief in which my technical and field experience will contribute to the growth of a productive organization.
Education: 1989 North Technical Education Center
Riviera Beach, FL
Drafting Courses
1987- Palm Beach Community College
1989 Lake Worth, FL
Surveying Courses
Experience 2003- Kem-Tec Land Surveyors
Present 22556 Gratiot Ave.
Eastpoint, MI48021
Survey Party Chief
1999- F.R.S. & Associates, Inc.
2003 West Palm Beach, FL 33407
(561) 478-7178
Project Manager / Survey Party Chief
1995- Heller-Weaver and Sheremeta, Inc.
1999 310 S.E. 1st Street, Suite 4
Delray Beach, FL 33483
(561) 243-8700
Survey Party Chief
1995- Williams Land Surveying
1990 8244 Pine Tree Lane
Lake Clarke Shores, FL 33406
(561) 588-3371
Survey Party Chief
Resume JAMES R. MOORE Page 2
1989- Craven Thompson & Associates
1990 5114 Okeechobee Boulevard, Suite 112
West Palm Beach, FL 33417
(561) 688-5010
Instrument Person
1987- Landmark Surveying
1989 1850 Forest Hill Boulevard
West Palm Beach, FL 33406
(561) 433-5405
Instrument Person
1986- Meridian Surveying
1987 No longer in business
Rodman / Instrument Person
1985- C.F.S. & Associates, Inc.
1986 No longer in business
Rodman
Skills: Mr. Moore has over twenty years of experience in surveying throughout the state of Florida. He has served as a Project Manager, Field Coordinator, Survey Party Chief, Instrument Person, and Rodman. Mr. Moore has excellent leadership skills mobilizing a survey crew for high performance. Mr. Moore has extensive experience in GPS surveys, boundary surveys, right- of-way surveys, topographic and hydrographic surveys, construction layout, roadway and highway calculations and layout as well as experience with the research of County records.
Additionally, Mr. Moore is highly skilled in the use of the latest technology including GPS equipment, both RTK and Static, Robotic Total Stations, and electronic field book. He has strong computer skills using MS Office, automated field data collection, CAICE software, and AutoCAD.
Selected
Projects: Palm Beach County Judicial Center Parking Garage
Palm Beach County, FL
Survey Party Crew Chief responsible for the accuracy of the calculations and layout of the column grid lines, the layout of columns, as-built of bolt pattern, and final column as-built throughout the length of the project for a multi-level
parking garage.
Resume JAMES R. MOORE Page 3
State Road 5 (5.5-miles)
Palm Beach County, FL
Survey Party Crew Chief responsible for the establishment of control points, running primary traverse, and obtaining field information along with as-built data of storm drainage system to the creation of a Digital Terrain Model of a four-lane highway with center median using electronic field book and CAICE software.
City of Delray Beach
Palm Beach County, FL
Senior Survey Party Crew Chief in charge of two survey crews. Responsible for making field calculations to establish multiple survey baseline, collecting field data using electronic field book, CAICE software as well as TDS software, and conventional methods to create a Digital Terrain Model for the use of a drainage study and design of drainage system for 5-square miles of a residential area.
Byrd Beach
Palm Beach County, FL
Senior Survey Party Crew Chief in charge and responsible for calculations and layout of infrastructure as well as the layout for building pads and roadway for a 400+ unit subdivision. Obtain record as-built data of all storm and sanitary structures.
Lake Ida Road (2.3-miles)
Palm Beach County, FL
Survey Party Crew Chief completely responsible for all of the calculations to establish construction baseline, layout of drainage structures, curbing along with super-elevated curves and vertical curves, and obtain all as-built information for roadway and drainage structures using both conventional methods and TDS software.
State Road 5 (4-miles)
Palm Beach County, FL
Senior Survey Crew Party Chief in charge of two survey crews. Responsible for establishing baseline survey cross section at twenty-meter stations of the full right-of-way, and full location of all features along with the as-built data of
all drainage structures using conventional survey methods. This project consisted of 4-miles of congested two-lane roads through downtown West
Palm Beach, FL.
Resume JAMES R. MOORE Page 4
SR 7 (7-miles)
Broward County, FL
Survey Crew Party Chief responsible for the layout of baseline of survey. Provided coordinate geometry for aerial targets as well as obtaining survey data for Digital Terrain Model used for new roadway design using electronic field book, CACIE software, and conventional survey methods through an extremely congested four-lane highway.
Jog Road (1.7-miles)
Palm Beach County, FL
Senior Survey Crew Party Chief for 1.7-miles of new road construction including calculations and layout of roadway and median along with drainage structures. Responsible for calculations of super-elevated curves and vertical curves with layout using both conventional survey methods and TDS software.
Interstate 95 and Blue Heron Boulevard
Palm Beach County, FL
Survey Crew Party Chief responsible to recover the survey control to calculate
and layout the construction baseline for sound walls on the four ramps of the Interchange using both conventional survey methods and TDS software.
Hillsborough and Ocean Canal
Palm Beach County, FL
Senior Survey Crew Party Chief in charge of a 17-mile canal widening project. Tasks included calculations for, and layout of, canals, levees, and water control structures as well as pre-construction, and post-construction as-builts using both Trimble GPS with RTK survey methods and TDS software for the field calculations.
IMC - AGRICO
Hardee County, FL
Project Manger and Senior Survey Crew Party Chief of a ten million-cubic yard relocation of soil to form a coffer dam to contain phosphate mining by- products. Task included scheduling of the survey crew, layout to perform quantity surveys, layout and calculations for the dam walls and hydrographic ditch with as-builts of the progressing projects. Additionally served as part
of the redesign team to access the changes necessary in the field as the project progressed using GPS with RTK for the layout and quantity surveys and TDS software for the calculations.
Resume JAMES R. MOORE Page 5
IMC - AGRICO
Hardee County, FL
Project Manager and Senior Survey Crew Party Chief for three different land reclamation projects, each 500+ acres. Task included scheduling of the survey crew, layout of each location, set-up of GPS calibration and control network, quantity surveys, layout of contour lines using GPS with RTK software.
Stormwater Treatment Area 3/4
Palm Beach County, FL
Senior Survey Crew Party Chief for a series of canals and levees with water elevation control structures covering a 17,000-acre area with 35+ miles of canals and levees. Responsible for calculations, layout of canals, levees, and water control structures, set-up of the GPS control network, as-built of canals and levees as the project progressed, and obtaining as-built data of control structures. Utilized GPS with RTK for the layout and as-built of levees and canals, and TDS software for the calculations. Additionally included calculations for vertical curves, layout for bridge piles, and control grid for bridge construction.
Pump Stations G-370 and G-372
Palm Beach County, FL
Project Manager and Senior Survey Crew Party Chief for the layout of control grid lines, layout of Pump Stations, establishment of vertical control, layout and calculations for levees and canals, as-builts of the Pump Stations, and post- construction cross sections of canals using both conventional survey methods and GPS.
Interstate 95 and 45th Street
Palm Beach County, FL
Survey Crew Party Chief responsible for recovering the survey control to calculate and layout the construction baseline for the construction of the
Sound barrier walls on the four ramps of the Interchange using conventional survey methods and TDS software.
State Road 85 (10-miles)
Oakaloosa County, FL
Instrument Person on the State Road 85 project to recover the baseline of survey, recover the section corners using certified records using both conventional survey techniques as well as retracement methods.
Resume JAMES R. MOORE Page 6
Shoppes At Partridge Creek
Macomb County, Mi
Survey party Chief responsible for the lay out for the new construction of a
multi acre Parking lot for a newly constructed mall in Sterling Heights, Mi
as well as the interior hardscape of the mall working directly with the
contractor on a daily basis
References: Available Upon Request
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.