Expertise in Master Pipe Fitting/Plumbing which includes ability to read Blueprint's/ISO metric for installation. Areas are: Ethanol Plants, power houses, liquid oxygen plants, commercial, industrial, residential, new construction plumbing. Sewer repair, drainage systems, boilers/installation, vacuum pumps, dental offices in new construction. Basic electrical installation; Expertise in trouble-shooting: solving job or trade related problems. Basic average hours usually worked 70 to 84 hours per week.
Frank K. Toth
822 15th St. #12
PO Box 147
Columbus, NE. 68601
(313) 415-2732 (C)
(313) 729-8295 (A)
franktoth12[at]gmail.com
Objective:
Expertise in Master Pipe Fitting/Plumbing which includes ability to read Blueprint's/ISO metric for installation. Areas are: Ethanol Plants, power houses, liquid oxygen plants, commercial, industrial, residential, new construction plumbing. Sewer repair, drainage systems, boilers/installation, vacuum pumps, dental offices in new construction. Basic electrical installation; Expertise in trouble-shooting: solving job or trade related problems. Basic average hours usually worked 70 to 84 hours per week.
CO-GEN ADM Corn Processing Plant, Project: Columbus, NE.
Master Pipe Fabricator, and build 24 inch thru down to ½ inch installed to co ordinances; set all hangers from 300 lbs. to 6000 lbs.; ran all instrumentation air line screw pipes to all actuated values; worked black carbon, CS, SS, P91, P22, P11, etc… extensive laser work lay-out person; ran: water, steam, air lines; also, scheduled 80 PVC industrial power plant. Installed: main steam header, and water purification skids.
7/2008 – 11/2008 Level IV Pipe fitter WANZEK Construction, Inc.
Fargo, ND.
58107
Merril Project:
Boiler room; built main support for all piping; installed main gas-line; installed all steam lines; installed blow-off lines; installed gas vent lines; ran steam lines into rack, and gas lines in rack to main processing, and centrifuge areas; worked fermentation and containment areas; and tank farm.
Project came to completion.
4/2008 – 6/2008 Level IV Pipe fitter American Piping Group (AIG)
Eldridge, Iowa
52748
Fort Dodge Project:
Installed headers to all screen boxes; completed whole system throughout whole plant.
7/2007 – 4/2008 Level IV Pipe fitter Central States Mechanical, Inc.
Ulysses, Kansas
67880
Superior Project:
Lay-out man for all cutting and sizing for corrected Isometrics; cut original Isle's from Blueprint reading; Materials - stainless steel, Black carbon, steel from 1/2 inch. To 30 inch; Fabled Tank Farm and containment area; centrifuged, and installed P and Id's. Ethanol Plant at Estherville, IA. Project.
Filled Contract; Project came to completion.
1/2007 - 1/2007 Pipe Fitter/ Shut-down Grus International/ North American Labor
Souderton, PA.
Project Type: PRAXAIR, INC.
Project Foreman: Mike Stiegerwald Foreman Phone: 330-416-2845
Job Duties: Worked as Pipe Fitter doing 16", 18" black carbon pipe, and ran stainless steel screw pipe. Ten (10) day shut-down job; did, all the lazar layout calculations for the shut-down. Set phalanges, values, and studs.
Full filled contract; job came to completion.
4/23/07–5/13/07 Pipe fitter/Instrument Fitter The Saxon Group Inc.
249 North Price Rd.
Sugar Hill, GA. 30518
Three-week Shut-Down; Nuclear Power Plant/Power House Plant produced Electricity
for Six U.S. States.
Job Duties: Re-pipe interior of whole plant; including, elevation Cooling Towers with Risers and Lube Oil/Air-piping; Operate: Basket-lifts, boom- lifts, and scissor-lifts.
May 2007 – Project Assignment: Oxygen Manufacturing Plant; Columbus, MS.
Three-week Shut-Down; plant produced liquid oxygen, and other gases; such as,
Nitrogen, hydrogen, and helium, etc... Re-pipe interior of whole plant; worked with all
pipe sizes, starting with 2’ to 36’; and, Utilized extensive knowledge of Boiler Makers.
Crew of 25 -40 craftsmen in Florence, AZ.; new construction for State Prison in plumbing with cast iron, gas lines, venting.; Also, rechecking crew's workmanship to pass inspection 1st time, and consistent correspondence with owner of company.
Specialty, for this Job: I ran High-Pressured Gas lines to roof units. I installed Air-Actuator’s in suckle doors, or closets; in-between, individual cell's for prisoner's; Hired in as Project Support, and job came to completion.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.