I want to work for Company that I can grow with not only in knowledge but in pay as well, also would like to be where I can use my skills that I have developed over the years as a professional field engineer/surveyor.
Equipment & Software
G.P.S. units: Trimble 5800, 5600, 4800, 4700 sires. Topcon HYPER LITE, Leica G.P.S. 1200.
Total stations: Sokkia sets 2b, 2b4, 2b2, Topcon, Pentax, Nikkon, Trimble robot, Leica TCA
1201M robot .plus a digital level for TX dot work.
Data Collectors: H.P. 33, H.P. 48GX, SDR 32, SDR 33, Husky, Ranger, TSC1 and TSC2, Recon, Trimble LM80 Carlson Explorer 1&2 with
SRV CE, and the Panasonic Tough Book with Carlson stand alone.
Software: Microsoft word, PowerPoint, Excel, Carlson stand alone, AutoCAD 2000-2009, and
Trimble Terramodel.
Certifications: CHSI fall protection and site safety (good till 2010), And Hilti ramset (good till 2009).
Heavy Equipment: 973 track loader, track hoe any size, 420 backhoe, 980 rubber tire loader, D6, D8, sky track forklift, boom lift, scissor lift any size.
Project list
San Antonio – when working for my father, we did two emergency runways on Kelly air force base As well as four new barracks. Also we built five Exxon gas stations.
When working for W.F. Castella we did very large subdivisions such as Longs Creek, Silver brook, Creek side well as the completion of the 151 hwy project.
Dallas- when working for Salter eng. I did a lot of title surveys when we were waiting for our next
Pipeline to start, Which is what the main bulk of our work was we used G.P.S. for miles and miles
of pipeline. To be located for depth, direction, size of pipe, type of pipe and weather or not they are leaking.
Austin- when working for Ranger I did the dirt work on South park meadows, Arbor walk, San
Clemente, AMD south, H.P. central, HEB Kyle,HWY. 45, Lake Travis High School, And numerous
Small projects as well.
When working for Zapalac Reed I did the layout for San Clemente’s five story building and five story Parking garage as well as the site work from utilities to BOC I did it all. And kept the job on target and within budget without incident. I also did several tilt wall jobs that were very large the smallest building was about 360’ long 175’ wide and all had drilled piers.
Additional Skills
I also have reviewed contractor technical submittals. Reviewed drawings and coordinated
With discipline engineers where needed, and ensure reviewable drawings are available to
All parties. Coordinate with contract supervisors to assure the required technical submittals
Are obtained from contractors. Participated in final inspection and prepared “punch lists”.
Participated in the preparation of technical features of field change requests and change
Orders. Supervised quantity take-offs. Monitored sub contractor inspection programs and
Quality control programs, reviewed contractors’ monthly invoices, drawings and O&M
Manuals as well and monitored as-builts. Prepared daily reports and weekly logs for each
Subcontractor. Reviewed all construction material testing and reviewed, evaluated the
Testing results.
Work Experience
Field engineer
5/2008 – 4/2009 Koontz Mccombs construction, San Antonio, TX
On this project I was the number two field eng. I was responsible for the precast of the building I also did the embed layout for all of the panels, I did shear wall layout as well when I was not busy with precast. Even though the job had been going for 10 months, I was able to catch up quickly and fit right in.
Field engineer/ site foremen
8/2006 - 3/2008 Zapalac reed construction, Austin, TX
I did all of the site layout for a five story building shear walls and five story parking garage poured in place walls 27' +, detention ponds walls, roads, and light poles. I created all points that were to be set out either on the office computer or out in the field on my data collector. I always had to make sure 25-30 men always had something to do. I set out every benchmark on the site for vertical control. I also have done several very 30' + tilt wall jobs as well the slabs for each of the buildings.
Party chief
12/2004 - 8/2006 Ranger excavating, Austin, Texas
Working for Ranger I had a company truck F-250 4x4 that I was responsible for as I had 5 to
6 job sites going at any one time. I had two men working underneath me to get our task
done in a timely manner. We used the Leica robotic total station and the Carlson software
on a Panasonic tough book. Did the entire layout for large earth moving machines to do
Wal-Mart shopping centers, HEB shopping centers, the shops at Arbor Walk, and south
Park Meadows. This is just a small list of projects I worked on while at Ranger.
Roustabout/floor hand
9/2004 – 12/2004 Halliburton , Dallas, Texas Assemble and repair oil field machinery and equipment use various types of equipment to dig ditches, post holes, pour concrete for slaps or securing posts, put together derricks keep the deck clean and clear of safety hazards moving equipment around the rig scrape rust, paint, connect sections of pipe for the well rig and sling loads being moved by the rig's crane, and ... other duties as assigned!
Regional manager, Chief of Parties
3/2002 – 9/2004 Salter Engineering & Surveying, Dallas, Texas
I was responsible for getting our jobs past out every morning to the right guys to do the job
and at the end of the day, I checked all surveys before sending them to the home office in
Wichita Falls. We did almost all grass roots construction on subdivisions from the prelim.
boundary and topo to setting the final property pins. We did every thing, We set the
const. control to the final control we also did the street offsets, water lines, sanitary sewer
lines and elec. lines. We used SOKKIA total station with the SDR33 and the TDS ranger and
also the TRIMBLE GPS
I-MAN/jr.party chief
12/2000 - 3/2002 W.F. Castella ENG, San Antonio, Texas
We used SOKKIA total station with the SDR33 and the TDS ranger. We
used the HP48GX, SOKKIA sets 2b, 2b2, 3b and 4b2, and TRIMBLE GPS units 4800, 4700
And 5600. At this company I learned to do grass roots construction on subdivisions from the preliminary boundary and topo to setting the final property pins. We set the const. control to the final control we also did the street offsets, water lines, sanitary sewer lines and elec. lines.
Grunt, Rodman, I-man, and Field engineer
6/1996 - 12/2000 Daniels construction co, San Antonio, Texas
When I first started with my father I did not know anything about surveying but my father put
me with one of the best surveyors he had ever hired. When I first started I learned OLD
SCHOOL with just a transit and 200' chain and calculator a year and half later we moved to
data collectors and total stations. We had a contract with Texaco to do all of their gas
stations in Texas. Also had a government contract to build barracks and two parking lots
and also did several frontage roads. At any one time we had 10 or more projects going on, that we had 8 or more guys working on that we had to keep busy as well.
Education
9/1999 - 5/2003 San Antonio community college, San Antonio, Texas
Associate Degree
Geophysics GPA: 3.4 total hours 28.0
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.