Projects Of interest: Retaining walls and other concrete structures on active High speed Rail Lines. Land development, streets, curb and gutter Road Improvements, Bridge rehab, Traffic control, Access Roads, Underground utilities, Gas, storm water, sanitary, water, Big Box, Wal-Mart, Home Depot, Parking lots, Bridges, Pre-cast Beams, with diaphragms, Steel Beams, and Open Web Design, Post tension segmental precast, columns and footers. Box Culverts, Structural and tilt-up Concrete, Marine Projects Coffer Dams, Shoring, Piling. Pre-Cast Post Tensioned Segmental Bridges. Post tension Tanks. Metal Building, Water treatment, Waste Water Treatment Plants. Elevated water tower foundations, Wind turbine Foundations, Upper End Residential, Churches and Schools, Multi-Story. Hospital/Medical, Concrete Restoration, and repair. Home inspections and reports, estimates to Restore properties, Helical Pile and cell tower foundations, Retro fit Gas transmission facilities.
Equipment operated: Most Equipment including Cranes.
Skills: Computer Literate, QuickBooks Micro Soft, Excel, Word, Power Point, Spectra Physics Cut and Fill Site with digitizer. Job Tracking Software, xactimate, National Restoration and Insurance Estimator, National Construction estimator, Timberline, 3-D walk through/Auto cad, Complex Form Design/Layout, D.O.T. Standards, Project Estimating. Forensic structural site investigation. Onsite Batch plant set up and operation, Master Carpenter, Site Management, Cost Tracking,
Estimating, Business Start up
Project Manager/Estimator 04-2008-09-2008
Neshaminy Brick and Block
Union Concrete and Masonry Contractor, Estimator/Project Management and Business development on Industrial, Institutional, and Municipal projects. Divisions 2, 3, 4, and 6. Company start up on Restaurant up grades and MacDonald’s McCafe CBB installs. Historic Masonry Restoration. Pre-construction activities, Project Management
• Quantity take off’s
• Negotiate with subcontractors and suppliers
• Project start up
• Business development
• Develop schedules
• Field management
• Change orders, RFI’s
• Documentation
• Business Development
Site Manager, Amex Construction, Bensalem Pa. 01-2006-04-2008
Union Site work Contractor, Cintas was a 4 million dollar project. Environmentally impacted site. Site utilities, Gas, Water, Sanitary, and Storm water system, Retention Pond, Roads, Parking lots, Foundations, Curb and gutter. Grades and Landscape. Paving.
• GPS Site Layout, set grades.
• Order Manpower and material
• Project Administration, Documentation, cost tracking
• Set schedules
• Site meetings
• Change order
• Supervision of all in house crews, Excavation, Concrete, Underground utilities, Landscape
Structural Concrete Superintendent Mumford and Miller Concrete, Middletown De. 2005-2006
New Castle County, De. Pump Station 6 Million Gal Pr Day Pump Station Forced Main. Large cold storage facility at the port of Wilmington De. Pier caps and grade beam on caissons foundation. 14 Million Dollar project. Supervise in house crews, and subcontractors
• File Daily Job reports, employees time sheets with cost codes.
• Quantity Take off's and ordering material,
• Form Design
• Site meetings
• Crane Operator
Civil Structure Superintendent, D.H. Blattner, Avon, Mn. 6 Month contract 2004
Callahan Divide Wind Farm, near Abilene, Texas. 76 GE Wind turbines, accelerated schedule Project. Spread Footing design with embedded bolt cages and tower pedestal. 76 foundations in 6 weeks. 26 miles of access roads to turbines and substation, 179 Million Dollar project..
• Job start up planning
• POD meetings
• Site set up Office trailers, Lay down yards
• Field supervision of foundation crews
• Supervise in house crews and sub contractors.
• Responsible for elevations and lay out, cut in roads, gravel compaction
• Monitor safety Programs, Lead Safety meetings
• Supervise 150 employees and 29 sub contractors
• All Layout, form Design
• Supervision Of all trades, Operators Ect. Civil, off load components
• Ordering all materials and equipment
• Set up Batch plant and water supply pond
• Component unloading, site placement
• Fill in for missing Operators
• Administrative
• Land owner relations
Avis Construction, Roanoke, Va. 2004 Structural Concrete Superintendent, Virginia Forge Plant Expansion. Buchanan, Va. 580,000 dollar project
• Supervise in house crews, and subcontractors on working Forge Company.
• Underground Utilities, Pre-cast Structures, Drop Inlets All Excavations
• Grades and paving,
• Responsible for all lay out and elevations 8,000 s.f. Addition and mechanical up grades.
• Site utilities, Water and Gas up grades.
Allegheny Construction, Roanoke, VA 2000-2004 Structural Concrete/Civil Superintendent, Gas lines, Water lines, for local utility company.
• Form and pour Curb/Gutters, Retaining Walls, footers, Median Strips,
• Sign Islands, Box culvert Bridge, Stream diversion Sheet piling,
• All grades, and paving,
• Bridges, 2 Long Span Bridges, and Approaches, Over Water, For NC D,O.T 48 Million.
• Pre-cast Beams W/ Diaphragms Bridge abutments, Footers Columns, and piers, all excavation setting grades and layout, and Paving,
• Set up Bidwell Finnish machine, D.O.T. inspections/meetings. Coffer Dams, Piling,
• Cityscape Project Roanoke, Va. Set pre-cast structures, Drop inlets Manholes Run Ductile, PVC, and CRP Pipe. All quantity take off's Grades and elevations,
• Supervise Concrete, Carpentry, and Grade Crews.
• Paving Traffic Control.
• Equipment Operated, Crane’s, Curb Machine, Track hoe, Bull Dozer, Road Grader
• Form Design, Slip form for box culvert
Sigma/Setterlin Construction, 1993-2000 Structural Concrete Superintendent, Children’s Hospital, Columbus, Oh. 320,000 s.f. Addition. Excavation, 160, Million. Multi Story
• Set grades for foundation excavation parking lot,
• lay out and elevations Building elevations and layout,
• Supervise Carpentry Crews, Concrete Crews, Structural Concrete,
• Power Plant, Utility Tunnels, Stairwells, Elevator Shafts, Structural Slabs
• Foundation Walls, under pin existing foundation.
• Cross woods 111, and Crosswoods 10. 10 story Mid rise office Building Steel frame and pan filled decks 43 Million
GA&FC Wagmans York, Pa 1973-1986
. Crane Operator, Carpenter, Carpenter Forman Bridge Superintendent, 8 Different Long Span Freeway Bridges, Supervised Shoring and excavations, Layout and set Elevations, road construction of 2 sections of I-95 4 lanes Each way 4 miles each. Open web design retaining walls, elevated ramps, Baltimore Md. Long span bridge pre-cast beams w/diaphragms metal pan decking Philadelphia pa. Water treatment facility Middletown, Pa. Bridges, Retaining Walls and other concrete structures on active High speed Rail Lines
Personnel Information: Good Health, Single, No Children at home, free to travel or Relocate
Thanks for your Time
William Osborne
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.