to be able to do the job as well as its duties and responsibility and to learn more.
GIL CARRION TORIO
Sta. Rita Karsada
Batangas City
Tel. No. 425-4031
Cel. No. 0915-395-2214
Email Address: giltorio [at]yahoo.com
Personal Data
________________________________________
Date of Birth : April 30, 1962
Place of Birth : Batangas City
Age : 46
Height : 5’3â€
Weight : 120 kg.
Marital Status : Married
Nationality : Filipino
Religion : Catholic
Passport No. : QQO775041
Date of Issue : August 05, 2005
Expiry Date : August 05, 2010
Place of Issue : Lucena City
ELEMENTARY : CALICANTO ELEMENTARY SCHOOL
Batangas City (1969-1975)
SECONDARY : BATANGAS NATIONAL HIGH
SCHOOL
Batangas City (1975-1979)
COLLEGE : PABLO BORBON MEMORIAL
INSTITUTE OF TECHNOLOGY
Batangas City (1979-1981)
Working Experience
________________________________________
I.
Year : August 31, 2007 – February 16, 2009
Position : Pipe fitter
Employer : E.E.I. Goro Nickel Project
Address : New Caledonia, France
Duties and Responsibilities
ï¶ Fabrication, erection and installation and pipe layout.
ï¶ Conducted hydro testing and air testing of all fabricated spools.
ï¶ Installation of different value and bolting as required.
II.
Year : August 08, 2003 – April 30, 2004
Position : June 03, 2004 – February 15, 2006
Employer : Brown and Root Industrial Services Phil.
Address : PSPC Tabangao, Refinery
Batangas City
Duties and Responsibilities
ï¶ Perform blinding / spading of process line.
ï¶ Overhaul repairs of detective valve.
ï¶ Beveling of various all pipes.
ï¶ Locate and prepare all piping spools and support needed erection.
ï¶ Responsible for material take. Off of piping material for fabrication and erection.
ï¶ Tightening of bolts in a right procedure.
III.
Year ; February 12, 2001 –May 28,2001
Position ; Pipefitter/pipeline Spacer
Employer ; ecco Asia Nacap Joint Venture
Address ;NPC Ilijan Natural Gas Pipeline Project
Duties and Responsibilities;
ï¶ Fit up and install 10 inches pipe
ï¶ Put internal and external clamp
ï¶ Assigned to tie-in the Sta.Rite pump station in shell refinery
IV.
Year : November 04, 1999 – May 15, 2000
July 10, 2000 – February 10, 2001
Position : Pipe fitter / Pipe line spacer
Employer : Mc Connell Dowell Phil. Inc.
Address : Calabarzon, Batangas City
Duties and Responsibilities
ï¶ Assigned to tie in the 24 inches pipe from shell to Ilijan pumping station.
ï¶ Put internal and external clamp.
ï¶ Cut and grind according to the isometric drawing.
V.
Year : August 29, 1997 – July 09, 1998
Position : Pipe fitter
Employer : Sukwon Ipche Engineering (m) SDN
Terengganu, Malaysia
Duties and Responsibilites
ï¶ Read and interpret drawing plan.
ï¶ Fabricate and install pipes on different elevation.
ï¶ Repair, recondition, hydro testing of coolers, sea water air cooler, fresh water, tube coil cooler.
VI.
Year : March 18, 1996 – December 14, 1996
Position : Pipe fitter
Employer : Trusty Engineering Const. Pte. LTD.
Address : Pulauayer Merbau, Singapore
Duties and Responsibilities
ï¶ Fabrication, erection and installation of pipes.
ï¶ Conducted hydro testing and air testing of all fabricated spools.
ï¶ Installation of different valve and bolting as required.
ï¶ Responsible for material take. Off of piping material needed or fabrication or erection.
VII.
Year : July 04, 1994 – October 03, 1994
Position : Pipe fitter
Employer : Interbeton Int’l Philippines Inc.
Address : Pilipinas Shell Petroleum Corp.
Duties and Responsibilities
ï¶ Installed lines of steam tracing.
ï¶ Fit up small bore up to a big bore pipe. Cutting, grinding, and beveling of pipes prior to fit up.
VIII.
Year : December 19, 1992 – March 12, 1994
Position : Pipe fitter
Employer : Belleli Saudi Heavy Industries LTD.
Address : Jubail, Saudi Arabia
Duties and Responsibilities
ï¶ Read and interpret the piping plan and isometric drawing.
ï¶ Erection and installation of pressurized pipe at any installation.
ï¶ Have knowledge of installation of pipe supports such as pipe shoe, anchor support, dummy support, and etc.
GIL CARRION TORIO
Sta. Rita Karsada
Batangas City
Tel. No. 425-4031
Cel. No. 0915-395-2214
Email Address: giltorio [at]yahoo.com
Personal Data
________________________________________
Date of Birth : April 30, 1962
Place of Birth : Batangas City
Age : 46
Height : 5’3â€
Weight : 120 kg.
Marital Status : Married
Nationality : Filipino
Religion : Catholic
Passport No. : QQO775041
Date of Issue : August 05, 2005
Expiry Date : August 05, 2010
Place of Issue : Lucena City
ELEMENTARY : CALICANTO ELEMENTARY SCHOOL
Batangas City (1969-1975)
SECONDARY : BATANGAS NATIONAL HIGH
SCHOOL
Batangas City (1975-1979)
COLLEGE : PABLO BORBON MEMORIAL
INSTITUTE OF TECHNOLOGY
Batangas City (1979-1981)
Working Experience
________________________________________
I.
Year : August 31, 2007 – February 16, 2009
Position : Pipe fitter
Employer : E.E.I. Goro Nickel Project
Address : New Caledonia, France
Duties and Responsibilities
ï¶ Fabrication, erection and installation and pipe layout.
ï¶ Conducted hydro testing and air testing of all fabricated spools.
ï¶ Installation of different value and bolting as required.
II.
Year : August 08, 2003 – April 30, 2004
Position : June 03, 2004 – February 15, 2006
Employer : Brown and Root Industrial Services Phil.
Address : PSPC Tabangao, Refinery
Batangas City
Duties and Responsibilities
ï¶ Perform blinding / spading of process line.
ï¶ Overhaul repairs of detective valve.
ï¶ Beveling of various all pipes.
ï¶ Locate and prepare all piping spools and support needed erection.
ï¶ Responsible for material take. Off of piping material for fabrication and erection.
ï¶ Tightening of bolts in a right procedure.
III.
Year ; February 12, 2001 –May 28,2001
Position ; Pipefitter/pipeline Spacer
Employer ; ecco Asia Nacap Joint Venture
Address ;NPC Ilijan Natural Gas Pipeline Project
Duties and Responsibilities;
ï¶ Fit up and install 10 inches pipe
ï¶ Put internal and external clamp
ï¶ Assigned to tie-in the Sta.Rite pump station in shell refinery
IV.
Year : November 04, 1999 – May 15, 2000
July 10, 2000 – February 10, 2001
Position : Pipe fitter / Pipe line spacer
Employer : Mc Connell Dowell Phil. Inc.
Address : Calabarzon, Batangas City
Duties and Responsibilities
ï¶ Assigned to tie in the 24 inches pipe from shell to Ilijan pumping station.
ï¶ Put internal and external clamp.
ï¶ Cut and grind according to the isometric drawing.
V.
Year : August 29, 1997 – July 09, 1998
Position : Pipe fitter
Employer : Sukwon Ipche Engineering (m) SDN
Terengganu, Malaysia
Duties and Responsibilites
ï¶ Read and interpret drawing plan.
ï¶ Fabricate and install pipes on different elevation.
ï¶ Repair, recondition, hydro testing of coolers, sea water air cooler, fresh water, tube coil cooler.
VI.
Year : March 18, 1996 – December 14, 1996
Position : Pipe fitter
Employer : Trusty Engineering Const. Pte. LTD.
Address : Pulauayer Merbau, Singapore
Duties and Responsibilities
ï¶ Fabrication, erection and installation of pipes.
ï¶ Conducted hydro testing and air testing of all fabricated spools.
ï¶ Installation of different valve and bolting as required.
ï¶ Responsible for material take. Off of piping material needed or fabrication or erection.
VII.
Year : July 04, 1994 – October 03, 1994
Position : Pipe fitter
Employer : Interbeton Int’l Philippines Inc.
Address : Pilipinas Shell Petroleum Corp.
Duties and Responsibilities
ï¶ Installed lines of steam tracing.
ï¶ Fit up small bore up to a big bore pipe. Cutting, grinding, and beveling of pipes prior to fit up.
VIII.
Year : December 19, 1992 – March 12, 1994
Position : Pipe fitter
Employer : Belleli Saudi Heavy Industries LTD.
Address : Jubail, Saudi Arabia
Duties and Responsibilities
ï¶ Read and interpret the piping plan and isometric drawing.
ï¶ Erection and installation of pressurized pipe at any installation.
ï¶ Have knowledge of installation of pipe supports such as pipe shoe, anchor support, dummy support, and etc.
GIL CARRION TORIO
Sta. Rita Karsada
Batangas City
Tel. No. 425-4031
Cel. No. 0915-395-2214
Email Address: giltorio [at]yahoo.com
Personal Data
________________________________________
Date of Birth : April 30, 1962
Place of Birth : Batangas City
Age : 46
Height : 5’3â€
Weight : 120 kg.
Marital Status : Married
Nationality : Filipino
Religion : Catholic
Passport No. : QQO775041
Date of Issue : August 05, 2005
Expiry Date : August 05, 2010
Place of Issue : Lucena City
ELEMENTARY : CALICANTO ELEMENTARY SCHOOL
Batangas City (1969-1975)
SECONDARY : BATANGAS NATIONAL HIGH
SCHOOL
Batangas City (1975-1979)
COLLEGE : PABLO BORBON MEMORIAL
INSTITUTE OF TECHNOLOGY
Batangas City (1979-1981)
Working Experience
________________________________________
I.
Year : August 31, 2007 – February 16, 2009
Position : Pipe fitter
Employer : E.E.I. Goro Nickel Project
Address : New Caledonia, France
Duties and Responsibilities
ï¶ Fabrication, erection and installation and pipe layout.
ï¶ Conducted hydro testing and air testing of all fabricated spools.
ï¶ Installation of different value and bolting as required.
II.
Year : August 08, 2003 – April 30, 2004
Position : June 03, 2004 – February 15, 2006
Employer : Brown and Root Industrial Services Phil.
Address : PSPC Tabangao, Refinery
Batangas City
Duties and Responsibilities
ï¶ Perform blinding / spading of process line.
ï¶ Overhaul repairs of detective valve.
ï¶ Beveling of various all pipes.
ï¶ Locate and prepare all piping spools and support needed erection.
ï¶ Responsible for material take. Off of piping material for fabrication and erection.
ï¶ Tightening of bolts in a right procedure.
III.
Year ; February 12, 2001 –May 28,2001
Position ; Pipefitter/pipeline Spacer
Employer ; ecco Asia Nacap Joint Venture
Address ;NPC Ilijan Natural Gas Pipeline Project
Duties and Responsibilities;
ï¶ Fit up and install 10 inches pipe
ï¶ Put internal and external clamp
ï¶ Assigned to tie-in the Sta.Rite pump station in shell refinery
IV.
Year : November 04, 1999 – May 15, 2000
July 10, 2000 – February 10, 2001
Position : Pipe fitter / Pipe line spacer
Employer : Mc Connell Dowell Phil. Inc.
Address : Calabarzon, Batangas City
Duties and Responsibilities
ï¶ Assigned to tie in the 24 inches pipe from shell to Ilijan pumping station.
ï¶ Put internal and external clamp.
ï¶ Cut and grind according to the isometric drawing.
V.
Year : August 29, 1997 – July 09, 1998
Position : Pipe fitter
Employer : Sukwon Ipche Engineering (m) SDN
Terengganu, Malaysia
Duties and Responsibilites
ï¶ Read and interpret drawing plan.
ï¶ Fabricate and install pipes on different elevation.
ï¶ Repair, recondition, hydro testing of coolers, sea water air cooler, fresh water, tube coil cooler.
VI.
Year : March 18, 1996 – December 14, 1996
Position : Pipe fitter
Employer : Trusty Engineering Const. Pte. LTD.
Address : Pulauayer Merbau, Singapore
Duties and Responsibilities
ï¶ Fabrication, erection and installation of pipes.
ï¶ Conducted hydro testing and air testing of all fabricated spools.
ï¶ Installation of different valve and bolting as required.
ï¶ Responsible for material take. Off of piping material needed or fabrication or erection.
VII.
Year : July 04, 1994 – October 03, 1994
Position : Pipe fitter
Employer : Interbeton Int’l Philippines Inc.
Address : Pilipinas Shell Petroleum Corp.
Duties and Responsibilities
ï¶ Installed lines of steam tracing.
ï¶ Fit up small bore up to a big bore pipe. Cutting, grinding, and beveling of pipes prior to fit up.
VIII.
Year : December 19, 1992 – March 12, 1994
Position : Pipe fitter
Employer : Belleli Saudi Heavy Industries LTD.
Address : Jubail, Saudi Arabia
Duties and Responsibilities
ï¶ Read and interpret the piping plan and isometric drawing.
ï¶ Erection and installation of pressurized pipe at any installation.
ï¶ Have knowledge of installation of pipe supports such as pipe shoe, anchor support, dummy support, and etc.
GIL CARRION TORIO
Sta. Rita Karsada
Batangas City
Tel. No. 425-4031
Cel. No. 0915-395-2214
Email Address: giltorio [at]yahoo.com
Personal Data
________________________________________
Date of Birth : April 30, 1962
Place of Birth : Batangas City
Age : 46
Height : 5’3â€
Weight : 120 kg.
Marital Status : Married
Nationality : Filipino
Religion : Catholic
Passport No. : QQO775041
Date of Issue : August 05, 2005
Expiry Date : August 05, 2010
Place of Issue : Lucena City
ELEMENTARY : CALICANTO ELEMENTARY SCHOOL
Batangas City (1969-1975)
SECONDARY : BATANGAS NATIONAL HIGH
SCHOOL
Batangas City (1975-1979)
COLLEGE : PABLO BORBON MEMORIAL
INSTITUTE OF TECHNOLOGY
Batangas City (1979-1981)
Working Experience
________________________________________
I.
Year : August 31, 2007 – February 16, 2009
Position : Pipe fitter
Employer : E.E.I. Goro Nickel Project
Address : New Caledonia, France
Duties and Responsibilities
ï¶ Fabrication, erection and installation and pipe layout.
ï¶ Conducted hydro testing and air testing of all fabricated spools.
ï¶ Installation of different value and bolting as required.
II.
Year : August 08, 2003 – April 30, 2004
Position : June 03, 2004 – February 15, 2006
Employer : Brown and Root Industrial Services Phil.
Address : PSPC Tabangao, Refinery
Batangas City
Duties and Responsibilities
ï¶ Perform blinding / spading of process line.
ï¶ Overhaul repairs of detective valve.
ï¶ Beveling of various all pipes.
ï¶ Locate and prepare all piping spools and support needed erection.
ï¶ Responsible for material take. Off of piping material for fabrication and erection.
ï¶ Tightening of bolts in a right procedure.
III.
Year ; February 12, 2001 –May 28,2001
Position ; Pipefitter/pipeline Spacer
Employer ; ecco Asia Nacap Joint Venture
Address ;NPC Ilijan Natural Gas Pipeline Project
Duties and Responsibilities;
ï¶ Fit up and install 10 inches pipe
ï¶ Put internal and external clamp
ï¶ Assigned to tie-in the Sta.Rite pump station in shell refinery
IV.
Year : November 04, 1999 – May 15, 2000
July 10, 2000 – February 10, 2001
Position : Pipe fitter / Pipe line spacer
Employer : Mc Connell Dowell Phil. Inc.
Address : Calabarzon, Batangas City
Duties and Responsibilities
ï¶ Assigned to tie in the 24 inches pipe from shell to Ilijan pumping station.
ï¶ Put internal and external clamp.
ï¶ Cut and grind according to the isometric drawing.
V.
Year : August 29, 1997 – July 09, 1998
Position : Pipe fitter
Employer : Sukwon Ipche Engineering (m) SDN
Terengganu, Malaysia
Duties and Responsibilites
ï¶ Read and interpret drawing plan.
ï¶ Fabricate and install pipes on different elevation.
ï¶ Repair, recondition, hydro testing of coolers, sea water air cooler, fresh water, tube coil cooler.
VI.
Year : March 18, 1996 – December 14, 1996
Position : Pipe fitter
Employer : Trusty Engineering Const. Pte. LTD.
Address : Pulauayer Merbau, Singapore
Duties and Responsibilities
ï¶ Fabrication, erection and installation of pipes.
ï¶ Conducted hydro testing and air testing of all fabricated spools.
ï¶ Installation of different valve and bolting as required.
ï¶ Responsible for material take. Off of piping material needed or fabrication or erection.
VII.
Year : July 04, 1994 – October 03, 1994
Position : Pipe fitter
Employer : Interbeton Int’l Philippines Inc.
Address : Pilipinas Shell Petroleum Corp.
Duties and Responsibilities
ï¶ Installed lines of steam tracing.
ï¶ Fit up small bore up to a big bore pipe. Cutting, grinding, and beveling of pipes prior to fit up.
VIII.
Year : December 19, 1992 – March 12, 1994
Position : Pipe fitter
Employer : Belleli Saudi Heavy Industries LTD.
Address : Jubail, Saudi Arabia
Duties and Responsibilities
ï¶ Read and interpret the piping plan and isometric drawing.
ï¶ Erection and installation of pressurized pipe at any installation.
ï¶ Have knowledge of installation of pipe supports such as pipe shoe, anchor support, dummy support, and etc.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.