John W. Stultz II, P.E.
Profile
 Project Manager with 13 years experience in estimating and managing commercial projects, including owner-direct. Managed both design/build, plan/spec, and performance contracts with union field personnel.
Experience
2006 – Present ACCO Engineered Systems San Leandro, CA
Project Manager/Account Manager – Building Service Division
 Managed account base of $600,000
o Bank of the West – 100 branches including main headquarter buildings and data center (Annual maintenance contract of $176,000 / Pull-through of approximately $350,000 - $450,000)
o Morgan Stanley – 4 data centers (Annual maintenance contract of $80,000)
 Owner-direct, design/build turn-key projects
o 901 Battery Street – Design/build replacement of built-up rooftop system. (Project Size $600k)
o FDIC – Turbocor retrofit to 250 ton Trane chiller including R-134a conversion (Project Size $500k)
o Bayfair Shopping Center – Design/build replacement of rooftop AC core system and installation of 450 ton supplemental chiller, along with smoke/exhaust system integration (Project Size $1.6 million)
o City of San Ramon – Multiple building AC replacement including custom multizone units (Project Size $900k)
 Performance contracts with ESCO partners
o Chevron/CSUEB – Performance Contract retrofit converting constant volume mixing boxes to VAV, hot and chilled water system modifications for energy savings (Project Size $1.48 million)
o AECOM/SFSU – Performance Contract retrofit of existing rooftop air handlers, installation of new heating hot water piping system/heat exchanger and VAV installation for faculty offices (Project Size $2.14 million)
1996 – 2006 ACCO Engineered Systems San Leandro, CA
Project Manager – Project Group/Construction
 Work with General Contractors
 Design/build projects
o UC Davis CCAH/CCG – Two story VAV/reheat system with independent Phoenix lab control system for research area and animal holding (Project Size Mechanical $1.7 million / Plumbing $700k)
o Fairmont Hotel – Renovation of entire hotel suites with 4-pipe fan coils on vertical risers, central plant replacement of 800 ton chiller and 850 ton absorption chiller, and Crown Room with multiple Value Engineering (VE) options (Project Size $5.6 million)
o The Shops at Tanforan – Full renovation of two-story, 460,000 sq.ft. mall with installation of 1600 ton water-source heat pump system serving mall common area and first floor tenants.
o Hines / 101 California – Replacement and relocation of 40 story high-rise outside air system from basement to 7th floor (Project Size $770k)
 Plan/spec projects
o Hines/Pleasanton Corporate Commons – Five story Core and shell of buildings B, C, and D (Project size $4.5 million)
 Lab Control, Cleanroom, and MOB projects
o UCSF Parnassus – Six story vivarium utilizing Tek-Air lab system (Project size $7.1 million)
o PAMF / Sutter Health Dublin – Three story core and shell with two floors full tenant improvement for MOB.
o Lawrence Livermore National Labs (NIF Project) Optics Assembly Building CSP5 – Installation of over 1600 HEPA filters with custom air handlers for Class 10,000, Class 1,000 and Class 100 clean rooms (Project Size $3.1 million)
 Estimate/Sale/Manage/Close Projects
 Mechanical Estimating / Fastpipe Pipe estimating / Sheetmetal Estimating
1995-1996 Linford Companies Oakland, CA
Project Engineer
 Estimating Support for Projects
 Load calculations, Duct & Pipe Sizing, System selection
 AutoCAD/Comply-24 Analysis/Microsoft Project/WENDES Duct Estimation
1992-1995 Glumac & Associates San Francisco, CA
Mechanical Engineer
 Engineering Design for new construction and tenant improvements (TI)
 Load calculations (Trane/Carrier), Duct & Pipe Sizing, System selection
 Energy Analysis of Systems
Education
1987 - 1992 California Polytechnic State University San Luis Obispo, CA
Bachelor of Science - Engineering Technology
 Air Conditioning & Refrigeration
Professional Associations
 Registered Professional Engineer, State of California
License #M30454
• LEED Accredited Professional (LEED AP)
Additional Project Examples
 Fashion Fair Mall, Fresno, CA – Replacement of mall common area system, Project Size $1 million
 USF Kendrick Hall, San Francisco, CA – Renovation of 5 story law building, Project Size $1.51 million
 USF Fromm Hall, San Francisco, CA – Renovation of existing Hall, including HHW radiant floor system
 Hacienda Lot 1F, Pleasanton, CA – Design/Build 2-story VAV/reheat
 Hacienda Lot 35B, Pleasanton, CA – Design/Build 2-story VAV/reheat, with full TI building out for Polycom Total project size $700k
 Life Chiropractic College, Hayward, CA – Renovation of two-story central plant built-up DX system with installation of 53 new rooftop package units for multiple classrooms. Project Size $900k
 St. Francis Hospital, San Francisco, CA – OSHPD renovation of 2nd floor, Mechanical, process piping
 Pacific Commons, Fremont, CA – Installation of multiple retail store complex, Project Size $900k
 1080 Marina Village Parkway, Alameda, CA – Four story VAV/reheat with multiple units serving common riser application
 Alameda County Juvenile Hall, San Leandro, CA – Renovation of multiple buildings with new AC units, security ceiling and grilles
 National Center for International Schools, San Francisco, CA – Renovation of existing school
 Raychem, Menlo Park, CA – Multiple industrial exhaust projects for manufacturing facility
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.