I would like to find an opportunity as a construction project manager / superintendent
Murillo Modular Group, Ltd., Carrollton, TX
August 2007 – October 2009
Project Manager/ Superintendent
- Coordinated and managed project set-up and start-up, job site meetings, submittals, and all project management and onsite job activities
- Determined scheduling for the different scopes of work to ensure an efficient contract completion
- Reviewed proposals, blueprints, specifications, and related documents to ensure contract compliance throughout projects
- Produced bidding documents and cost estimates by analyzing labor, material, and time requirements
- Located subcontractors and conduct bidding procedures for all scopes of work for each building
- Resolved discrepancies by collecting and analyzing information
- Reported and submitted production schedule documents
- Coordinated and communicated with customers, contractors, and manufacturers
United States Army, Grand Prairie, TX
October 2001 – Current
1st Lieutenant, Corps of Engineers – US Army Reserve
721st EN Co, 980th Engineer Battalion
March 2009 – Current
Executive Officer
- Oversee all company operations and senior leadership for a company of 160 soldiers
- Plan for and ensure that the company is ready to fully execute all assigned missions
- Disseminate all company orders and missions to senior leadership
- Create full Bill of Materials and packing lists for company missions
- Follow-up with company staff and Commander to ensure all tracking items and mission essential items are being handled in a timely manner
- Ensure mission success and training success for Company Commander
420th Engineer Brigade
October 2007 – March 2009
Operation Enduring Freedom, FOB Sharana, Afghanistan
Engineer Intel Officer, S-2:
- Ensured section information was disseminated and executed to meet the S-2 section officers intent
- Oversaw the inventory and load-out of all section equipment
- Conducted Intel Missions
Brigade Force Protection Officer:
- Planned and oversaw the future force protection improvements for all Task Force (TF) Castle Forward Operating Bases (FOBs)
- Conducted Vulnerability Assessments for all Combat Out Posts and Forward Operating Bases under TF Castle
- Kept the commander informed of the force protection level of every TF Castle installation and the progress of all improvements to these locations
Contracting Officer Representative for the Air Traffic Controllers:
- Oversaw the management and operation of the Air Traffic Control Tower
- Ensured that all air field issues are resolved in a timely manner
- Conducted monthly inspections and submit a Performance Assessment Report to the Administrative Contracting Officer
- Reviewed and inspected the PWS equipment and submit the inventory to the Admin. Contracting Officer
- Successfully completed Quality Assurance Personnel Phase I & II Training Courses
Platoon Leader:
- Provided accountability for all assigned troops (40 personnel on brigade staff)
- Ensured troops are at all assigned training
- Coordinated movement to and from Mobilization and Demobilization training
- Ensured all platoon soldiers were equipped with the equipment they needed to deploy
- Ensured NCO Evaluation Reports were submitted on time and to standard
Personnel Recovery Officer:
- Ensured a Battle Drill for Personnel Recovery Operations was in place
- Ensured all sections knew their portion of the Battle Drill response
Topographic Section Manager:
- Coordinated with Team Leader to ensure troops have all the supplies, equipment, and anything else they needed to fully conduct their mission without issues
- Oversaw product request and production and assisted where needed
- Ensured team issues were communicated to the S-2 section officer
Alpha Company, 980th Engineer Battalion
May 2005 – October 2007
Platoon Leader for two platoons
- Planned and executed all assigned missions
- Ensure all assigned personnel (160 personnel) are fully trained
- Plan and ensure risk assessments are utilized
Acting Executive Officer for Alpha Company 980th Engineer Battalion
- Plan for 160 assigned personnel to fully execute all assigned missions
- Disseminate all company orders and missions to senior leadership
- Create full Bill of Materials and packing lists for company missions
Officer Basic Course, Ft. Leonard Wood, MO
January 2006 – May 2006
Trained in:
- Leadership/ Project Management
- Bridging
- Vertical and Horizontal Construction (i.e. drainage, concrete, utilities)
- Demolition
- Maintenance Procedures
- Unit Movement, Tactics, and Planning
420th Engineer Brigade
October 2001-May 2005
Cadet Officer, Platoon Sergeant
- Planned and executed all related tasks
- Filed papers in the administration (S-1) area
- Assisted with restructuring and organizing supply area
The George D. Alan Company, Dallas, TX
June 2006 – August 2007
Project Manager/Estimator
- Determined scopes of work and required contents of estimate by studying proposals, blueprints, specifications, and related documents
- Computed costs by analyzing labor, material, and time requirements
- Resolved discrepancies by collecting and analyzing information
- Maintained files of working documents as back-up for estimate figures, including current information on prices from suppliers through direct contact, sales brochures, price lists, etc
- Prepared production documents
- Coordinated and communicates with customers, vendors, and manufacturers
- Coordinated and managed project set-up and start-up, pre-job conferences, job site meetings, submittals, and all project management activities
Huffman Custom Builders, Plano, TX
May 2005 – December 2005
Project Superintendent
- Managed the beginning to the end of a $8M cancer center in McKinney, TX
- Ensured the project was following all codes and regulations
- Organized all job related documents
- Maintained strong customer relationships with the directors of the center to ensure the project was meeting their needs
- Evaluated and critiqued the sub-contractor’s work for a quality build
- Performed routine inspections on all completed areas
Architectural Assistant – Internship May 2003-August 2003
- Created architectural drawings for clients in AutoCAD (These consisting of both Shell and Finish Out plans)
- Revised plans to meet clients needs
- Assisted in other tasks required
Collier Construction, Brenham, TX May 2001-August 2001
Summer Construction Worker- Assisting General Contractor
- Surveyed the site and laid out the building plans
- Operated a bulldozer
- Operated an off-road dump truck
- Operated a sheep-foot vibe roller
- Built framework for and poured concrete
- Set steel frame members
- Assisted the General Contractor in many other required tasks
Other Certifications/Qualifications
- OSHA – 30-hr Course Certification
- OSHA – 10-hr Course Certification
- Sealant & Waterproofing Installation Training
- Deck & Traffic Coating System Installation Training
- Contracting Officer Representative Certification
Military Certifications/ Qualifications
- COIN Leaders Course Training
- AT Level II Certification / CVAMP Training
- Personnel Recovery Officer Training
- Contracting Officer Representative Certification
- Quality Assurance Personnel Training Level I & II
- Multiple Vehicle Certifications on Military Driver’s License
- BATS / HIIDE Systems Training
Education
Texas A&M University, College Station, TX
Bachelor of Environmental Design in Architectural Studies
Minor in Business Administration
- 1999-2003 Member of the Fightin’ Texas Aggie Band
- 1999-2003 Member of the Corps of Cadets
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.