The following is an overall summary of my work experience in many diversified arenas. After 29 yrs. in the Mechanical Construction and/or Facility Maintenance field, I am seeking a permanent position with a medium to larger firm. I am interested in the Superintendents position within your company. I'm task oriented with vast experience in the construction industry which will meet the requirements for this position.
My career has lead me to many types of projects and positions. My first 15 yrs. (which included my 4 years as an apprentice), were in the Nuclear field of both Construction and Power outages. This experience included major steam piping & valve replacement, steam turbine replacement, condenser replacement, heat exchanger replacement, controls, tubing, supports, system testing and commissioning, special equipment training Tri-Tools bevel/cutters , pipe bending . Six years were spent working in the High Tech Industry as an orbit welder/ detailer at projects for Intel at Aloha and Ronler Acres and various other projects in Portland, Oregon.
During the next 14 years, I worked on the following type of projects- Dual Fire Energy Projects , Gas-fired & Steam turbines and their piping, controls & calibration tech., low voltage, main steam piping, condenser, water treatment, boilers, steam drums, tubing, rigging, & supports. Gas & Oil refineries, Pipeline work, pumping stations, chemical plants, Government projects at Hanford Nuclear Site for site clean-up, Nuclear outages.
Data projects for MSN, Yahoo, Intuit, installing mechanical systems, water treatment facility, cooling piping and cooling towers, detailing systems, supports, rigging plans, diesel fuel systems.
As you can see, my experience has been outlined within my resume. However, an interview can sum up any other questions you may have.
I look forward to hearing from you.
Sincerely,
John N. Zeller
John N. Zeller
421 So. Arthur Place, Kennewick, WA 99336
E-mail: trailfinder09[at]yahoo.com
Cell: 509-551-2188 Home: 509-396-3372
OBJECTIVE:
To obtain a position as a Superintendent in the General construction and/or Mechanical Field
EXPERIENCE:
Total of 28 yrs experience in the piping and General Construction industry and a member of United Association of Plumbers and Pipefitters. With a combination of 15 yrs. as a journeyman steamfitter, with experience in instruments and controls and 13 yrs. of various Management level positions on Nuclear, Oil/Gas, Data, Government, Dual Power Projects to name a few. Clearances Held-DOD Top Secret , DOE Q, NRC
EDUCATION & CREDENTIALS:
Casa Robles High School, Orangevale, CA Class of 1974
United States Army, 18th Airborne Corp 1975-1979
Los Angeles Community College 1978-1979
Studies in Criminal Law & General Education
Local 598 Plumbers & Pipefitters Apprenticeship Program
Pasco, WA 1981-1984
Oregon State Pressure Vessel & Boiler License-Class III
Supervisor Training in Accident Reduction Techniques (S.T.A.R.T.)
American Heart Association First Aid & CPR
EMPLOYMENT:
Williams Plant Services 5/09-9/09
P.O. Box 2107
Richland, WA 99352
Job requirements and responsibilities as General Foreman over 84 craftsman at Columbia Generating Station II. Duties included issuing work orders, coordinating craft personnel in meeting job specifications, coordinating support craft, working with QA/QC weld engineering and planners, documenting impact concerns, reviewing work packages' status, schedule reports, and manpower issues. Implementing Safety Permits, mediation of jobsite concerns with Management and Union. Payroll implementation, procurement of materials and equipment for special needs projects. Supervisor: Jason Simmons 509-377-8241
Apollo Sheet Metal 4/08-8/09
1201 W. Columbia Drive
Kennewick, WA 99336
Job requirements and responsibilities as Foreman at Yahoo Data Center, Quincy, WA. Duties included layout of piping systems, drafting pipe fabrication drawings, support drawings, submitting change orders, material requests, and liaison with Gen. Contractor, Safety Planning, Training, testing of piping systems, commissioning of diesel fuel systems, water treatment systems & cooling towers. Supervisor: Russ Matheny 909-727-8325
Harder Mechanical 9/07-3/08
P.O. Box 5118
Portland, OR 97231
Job responsibilities as Foreman at REC Expansion Project, Moses Lake, WA. Duties are to manage fabrication shop/lay down yard. To include cataloging of all incoming shipments and deploy manpower for off-loading, design grid matrix, managing piping spool requests, and their delivery to on-site installation crews. Also, responsible for piping fabrication crews to manage priority piping systems, order materials & gases, QA/QC Inspections, Weld Documents, and Safety Planning.
Supervisor: John Hershberger 503-281-1112
PCI/Westinghouse Energy Services 3/07-6/07
One Energy Drive
Lake Bluff, IL 60044
Job responsibilities as Foreman at Energy Northwest Nuclear Power Plant at Hanford, WA. Duties were to assist with the removal and re-installation of piping and instrumentation systems during the removal of two 100-ton heat exchangers and their replacements. Duties included assignment of work packages, coordinate support craft, monitor QA/QC Inspections, package buy-offs, retesting systems, coordinating with Plant Operations on System Start-up. Supervisor: Tom Nevoso 847-732-2816
McKinistry Co. 7/06-12/06
P.O. Box 24567
Seattle, WA 98124
Job responsibilities as General Foreman at MSN Data Center at Quincy, WA. Duties to include management of 45 craft personnel with scheduled deadlines, Safety Management & Training, ordering materials, equipment, rigging plans for setting large equipment, coordinating work assignments with Gen. Contractor, and other craft personnel. Also, responsible for component verifications, visual weld inspections, testing specifications, commissioning systems, and Client relations.
Bechtel Power Company 3/05-1/06
P.O. Box 209
Redlands, CA 92373
Job responsibilities as an Instrument & Calibration Foreman at Mountain View Power Plant in Redlands, CA. Duties to include work assignments to Electrician and Pipefitters in the installation & calibration of over 3000 instruments within this Project. Duties were to provide technical info. order calibration tools and equipment, schedule system testing, provide workers with data specifications, provide calibration documentation sheets, and Safety Training, coordination with Plant Operations & Control Room Operations during Plant Startup.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.