Name : Tiee-Jiann, Pai
Marriage : Married with 2 children
Nationality : Citizen of USA
Address : 6060 Fairmont Pkwy, Apt #6207, Pasadena, TX 77505
Telephone : (818) 268-2398
Email Address : tjpai1678[at]gmail.com
SUMMARY OF STRENGTH
Over 30 years experiences on Process Equipment and Project Engineering of EPC projects.
1. Project Engineering and Cost Estimation :
ï¬ Defining project scope of work
ï¬ Estimating project cost and develop project budget
ï¬ Define project activities and duration
ï¬ Develop project schedule
ï¬ Performing interdiscipline coordination and reviews
ï¬ Preparing technical reports and proposals to Client
2. Process Equipment Engineering:
ï¬ Performed pressure vessel design using ASME Code SECT VIII guidelines
ï¬ Performed tubular heat exchanger design using TEMA criteria.
ï¬ Performed pump/hydraulic engineering including performing pump selection and system hydraulic calculations.
ï¬ Prepared vessels, pump and exchanger data sheets, specifications, and requisitions; evaluating vendor technical quotations and bids, and recommending vendor selection to management and client.
LANGUAGE: Fluent in English and Chinese, both verbal and written
EXPERIENCE
2008 June to 2009 July - Ventech Engineers International Corp, Houston, Texas
Senior Project Controls Engineer
Work included
ï¬ Proposal project schedule planning
ï¬ Equipment, bulk material, direct and indirect costs of installation and fees estimation
ï¬ Develop DBMS for cost controls department
Amakpe 6,000 BPSD Refinery Project, Nigeria
Vostok Refinery Relocation Project, Russia
Terra 1,500T/D UAN Project, USA
2008 April to June - Worley Parsons
Project Controls Engineer
Performing scheduling and EMSR.
ARAMCO Project
2005 – 2007 Onward Co., Ltd. China
Manager of Engineering
Work included defining project scope of work; establishing project budgets and schedules; resolving technical issues; expediting project deliverables.
Honda Accord after market head and tail lights
2002 -2004 Move to USA for citizenship approval
1999 – 2001 Enprotect, Taiwan
Division Manager of Project
Work included defining project scope of work; establishing project budgets and schedules; performing interdiscipline coordination and reviews; resolving technical issues with disciplines and Client; expediting project deliverables and preparing technical reports to Client
Koahsiung Industrial Park Stack CEMS EPC project
1994 – 1997 Philips Project, Taipei, Taiwan
Division Manager
Establishing project budgets and schedules; resolving technical issues with disciplines and Client; expediting project deliverables; and preparing technical reports and proposals for submittal to Client and government agencies.
Koahsiung International Airport Electrical Low Voltage System EPC project – U$13 millions
1988 – 1993 GE Power System, Taipei, Taiwan
Project Engineer
Performing interdiscipline coordination and reviews; resolving technical issues with disciplines and Client; expediting project deliverables; and preparing technical reports and proposals for submittal to Client and government agencies.
HsingTa Wet Process FGD EPC project - U$70millions
1985 – 1987 CECI Taipei, Taiwan
Mechanical Senior Engineer
Developing system criteria, pump sizing and hydraulic analysis; establishing project budgets; construction management
Yu Chen Pumping Station – containing two (2) 1560 cubic meter per hour vertical pumps. (Note: It was the largest pumping station in Taiwan at that time)
1980 – 1985 PECL Taipei, Taiwan
Senior Mechanical Engineer
Performing System Criteria Development and equipment sizing of circulation water, condensate, feed water systems
NO. 4 Nuclear Power Plant Project
Developing PDF, P&I D, hydraulic gradient of circulation water system
Singapore Pulau Seraya Project
Analyzing and provide improvement proposal for feed water pump discharge valve cavitations issue, RHR intake water marine growth issue.
No.2 Nuclear Power Plant
1974 – 1979 CTCI, Taipei, Taiwan
Senior Mechanical Engineer and Project Engineer
Performing pressure vessel design by ASME Section VIII code, heat exchanger design by TEMA code, hydraulic gradient calculation, pipe sizing, pump sizing by HI standard, piping design, plant layout, project scheduling and interdiscipline coordination.
1971 – 1973 ChunYuan University, Taiwan
Assistant Professor
RELEVANT ON-JOB TRAINING
Nuclear Engineering BWR&PWR, BECHTEL (1983)
Procurement for Nuclear Project, BETCHEL (1983)
Project Scheduling, MS Project (1994) and P3 (1997)
Process Plant Cost Estimation, Est$Pro (1996)
Finance for Non Financial Manager, University of Michigan (1991)
EDUCATION
Special Study at Massachusetts Institute of Technology Sep. 1980 ~ Sep. 1981
Specialization: Nuclear Engineering
M.S. Mechanical Engineering, State University of New York - 1971
Specialization: Fluid Mechanics
B.S. Mechanical Engineering, ChunYuan Engineering and Science University – 1968
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.