More than 20 years of Engineering and Maintenance experience in the Glass and Heavy Manufacturing Industries. Extensive background in micro processors (PLC's),Batching Systems, Robotics,and initiating World Class Maintenance structure ….. with a proven track record of success.
2005 Arch Aluminum & Glass Inc. Tamarac Florida
To A manufacturer of Commercial and Residential glass products
2009
2000 Sypris Technologies, Marion, Ohio
to A forging manufacturer of axles and components for the heavy truck market
2005
1993 American Glassmith Inc. [ Division of American Architectural
to Products Corp. ] Columbus, Ohio
2000 A manufacturer of Decorative Glass for the Window, Furniture, Cabinet,
and Architectural products.
1990 Guardian Industries, Upper Sandusky, Ohio
to A major glass manufacturing plant producing Automotive, Truck ,
1993 and Architectural Glass Products.
2005 Arch Aluminum & Glass Inc., National Project Engineer
to * Responsible for Projects in 33 plants in USA
2009 * Implement a National CMMS system
* Initiate a skill attribute training Program for all maintenance
* Engineer new "Solar" PV product line
* Implement 6 Sigma Program Nationally
Special Duties / Responsibilities Include :
1. Initiate TPM program
2. Establish new "Solar" PV product line
Accomplishments:
1. Initiated computerized maintenance management system [ CMMS ]
2. Control and lower all MRO spending by (25%) nationally
3. Developed new "Solar" product using PV method
4. Administrator for computerized "Maintenance Skill Training" program
2000 Sypris Technologies, Plant Maintenance Manager :
To * 250,000 sq. ft. facility
2005 * $5.2 Million Annual Budget
* 70 Skilled Hourly Employees
* 4 Supervisory Employees
* Forging Presses to 8,000 tons
* CNC machining equipment
Special Duties / Responsibilities Include :
1. Six Sigma Certified
2. Establish an Auto Cad system for maintenance department.
Accomplishments:
1. Initiated computerized maintenance management system [ CMP ]
2. Upgrade Press Equipment controls from relay logic to PLC logic
3. Developed new maintenance trainee programs
4. Developed substation infrared maintenance program
5. Engineer and install World Class automated machining center.
Most automated machining center for the heavy axle market in the world.
6. Engineer and develop new 8 MVA Substation
7. Reduce Plant Equipment Downtime by 30%
1993 American Glassmith, Plant Engineer:
to * Manage Plant Maintenance Department.
2000 * Developed Capital Expenditure plans
* Purchase Capital Expenditures
* Responsible for All Plant Assets
* Responsible for Research and Development.
* Responsible for Environmental and Plant Safety.
Special Duties / Responsibilities Include :
1. Implement a plant QOS training program [ Quality Operating System ]
2. Implement a plant SOP program [ Standard Operating Procedures ]
3. Establish a Auto Cad system for developing and documentation.
Accomplishments:
1. Establish a computerized P.M. program [ Decreasing down time by 25% ]
2. Engineer a new Sandblaster machine, with accredited U.S. patent
3. Engineer and develop new Lighting Inspection Booth, with accredited U.S. patent
4. Relocate a glass laminating plant from Michigan to Ohio.
1990 Guardian Industries, Maintenance Superintendent :
to * Directly responsible for all plant equipment, facility and grounds.
1993 * Responsible for all maintenance functions.
* Trouble-shoot PLC's , SLC's , PID controllers, ICB modules, mechanical
and plant facility problems.
* Responsible for coordination of projects from engineering to
maintenance.
* Implement Engineering project tasks.
Special Duties / Responsibilities include :
1. Scheduling all week-end or down period repairs.
2. Implement a new Preventive Maintenance Program.
3. Implement and train all plant employee's on new Lockout / Tagout
procedures.
4. Implement all training programs to enhance the skills of mechanics.
Accomplishments :
1. Foster a maintenance continuous improvement program.
2. Instrumental in the ISO 9000 certification.
3. Instructor for QES and QWG seminars . [ Quality workshop ]
4. Plant down-time for 1992 was 0.8% [ lowest percentage in plant history ]
5. Engineer new design for Glass Furnace Head Frame. Cost saving $75,000.00
Education and Training :
Ohio State University Fanuc Robotic
Administrative Sciences Programming / Operation
March - 2002
Ohio State University, Marion Ohio Branch
Supervisory Management Classes Philip Crosby Associates
September - June 1981 QES & QWG Instructor
July - 1991
Marion Technical College
Advanced Computer training Technicomp Associates
June - 1989 TQM Training
July - 1994
Ohio State University, Marion Branch
Communications course Six Sigma
October - January 1986 Certified
June - 2003
Quaker Oats Company, Chicago, Illinois
First Line Supervisory Seminar, Problem Solving, Statistical Quality
Assurance, E.E.O. seminar, Supervisory Success, Train- the- Trainer
America Supplier Institute ( ASI )
Statistical Thinking for Manufacturing Process
Control Training
July – 1990
Terra Technical College, Tiffin, Ohio
Hydraulics Concepts / Trouble Shooting
August – 1990
Allen Bradley PLC * SLC Training School ( Certified Tec. )
September – 1991
Detroit Ball Bearing Company
Bearings, Couplers, Lube
May - 1990
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.