A Management position with the opportunity to contribute to the efficient and profitable operation of a company. Utilizing a combination of industry work experience with a bachelor’s degree in construction management.
WAYNE GANTT, LEED AP
POSITION SEEKING
___________________________________
A Management position with the opportunity to contribute to the efficient and profitable operation of a company. Utilizing a combination of industry work experience with a bachelor’s degree in construction management.
QUALIFICATIONS
___________________________________
Project Management including, but not limited to: coordination and managing employees, materials, and equipment; budgets, change orders, schedules, and contracts. Emphasizing customer satisfaction, on time completion and maximum profitability.
EXPERIENCE/EMPLOYMENT HISTORY
___________________________________
 16 + years in the Electrical Construction Industry – Multi-Million Dollar Projects in the areas of Mass Transit, Airport, Refinery/Industrial, Bio-Chemical, Residential High Rise and Laboratory Research Facilities.
 Senior Project Manager, Project Manager, Pre Construction & Estimator
 Cupertino Electric – Los Angeles, Ca (2008 – 2010)
 SASCO – Fullerton, CA (2006 – 2008)
 Rodda Electric – Brentwood, CA (2005- 2006)
 Cupertino Electric, Inc. – San Francisco, CA (2004 – 2005)
 Amelco Electric, Inc. – San Leandro, CA (1994 – 2004)
EDUCATION
___________________________________ 1988 – 1993 California State University, Chico Chico, CA
 B.S., Construction Management
PROJECT HISTORY
___________________________________
California Institute of Technology – Schlinger Chemistry and Chemical Engineering Laboratory
Pasadena, CA (4 Million)
3 Story Laboratory Building
California Institute of Technology – Noyes/Agapie Lab Remodel
Pasadena, CA (125K)
Design build fast track laboratory remodel in existing building
The Century
Century City, CA (15 Million)
42 Story Luxury Residential High Rise
UCSF Medical Center, Moffit/Long Hospital Emergency Generator Upgrade
San Francisco, CA (3.2 Million)
Replacement of emergency generators in an active hospital. OSHPD project
Cooley Godward, L.L.P.
101 California St., Floors 4, 5 & 6
San Francisco, CA (2 Million)
100,000 sf Law office tenant improvement project
California Pacific Medical Center – Pacific Campus
CT Scanner & Ultrasound Suite OSHPD project
San Francisco, CA. (350K)
California Pacific Medical Center – Pacific Campus
Stanford Building 7th Floor Administration Remodel
San Francisco, CA (150K)
400 sf office tenant improvement project
Blood Centers of the Pacific - Irwin Center Renovation
San Francisco, CA (450K)
10,000 sf lab and office tenant improvement project
Infrastructure Electrical Distribution System Improvements Phase 1
University of California, San Francisco - Parnassus Campus (4 Million)
Multiple building electrical distribution system upgrades
Parnassus Services Seismic Replacement Building
University of California, San Francisco - Parnassus Campus (4 Million)
6 story Animal Research Facility
Moscone Center West Expansion,
San Francisco, CA (20 Million)
Building Power, Lighting and Special Systems for new convention center
San Francisco International Airport Contract 5515.A Security & Special Systems
Access Control System, CCTV System, and Baggage Screening X-Ray Machines for new International Terminal, Terminal A, Terminal B and Parking Structures (20 Million)
Genentech, Inc. - Biochemical Manufacturing Facility
Vacaville, CA (12 Million)
Building Power, Lighting, Instrumentation and Special Systems for new facility
Ultramar Oil Refinery - Hydrogen Plant
Wilmington, CA (5.5 Million)
Plant Power, Lighting and Instrumentation
Shell Oil Refinery - Hydrogen Plant
Martinez, CA (2.6 Million)
Plant Power, Lighting and Instrumentation
BART Traction Power - Dublin/Pleasanton Extension (14 Million)
BART Track way - I-580, Castro Valley/Pleasanton, CA (9 Million)
PROFESSIONAL TRAINING
________________________________________
LEED-NC Accredited Professional
OSHA 30 Hour Certified
Accubid Estimating Version 9.0
Lean Construction Institute – Active Member
Construction Schedule Analysis & Delay Damages
ESI Estimating Program – McCormick Systems
NECA Estimating Electrical Construction
NECA Change Order Pricing
Primavera Project Planning
Change Orders in Electrical Construction including: Quantifying the Cumulative Impact of Change Orders on Labor Productivity
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.