Be in a team-oriented engineering professionals wherein human performance, integrity and dedication are integral means to make the deliverables.
LINOVIC ALAS PE
769 Lindbergh Avenue, Peekskill, NY 10566
alasl[at]msn.com
EXPERIENCE SUMMARY
ï¶ Demonstrated multi-discipline engineering capability in over 20 years of building and facility design, engineering and construction management.
ï¶ Hands-on experience on public utility plant operations, BOP engineering, HVAC/FACTS transmission design, water/wastewater treatment design & field engineering, installation, testing, commissioning and validation of various mechanical/electrical equipment, in-depth knowledge in the coordination of construction phases, specialty trades and project logistics.
ï¶ Unique skills in performing associated civil and structural design and implementing tasks in support of mechanical and electrical work.
ï¶ Skilled in Computer Software use, including AutoCAD 2010, MicroStation V8, P3/P6, ETAP, SKM/PTW, ASPEN One Liner & RDB, MS Windows applications, etc.
EDUCATION/TRAINING
ï¶ BS Mechanical/Electrical Engineering,1977/78
University of the Visayas, Philippines
ï¶ National Society of Professional Engineers (NSPE)
ï¶ Institute of Electrical & Electronics Engineers (IEEE)
ï¶ Project Management Institute (PMI)
WORK EXPERIENCE HISTORY
November, 2008 -Current
Entergy/Indian Point Energy Center/Buchanan, NY
Senior Engineer/Service Contractor
ï¶ Senior Engineer involved in the daily operations of Nuclear Units. 2 & 3.
ï¶ Issue Plant Design Modifications, develop procedures, issue Work Orders and act as Technical Discipline Lead on electrical tasks.
ï¶ Supervised and mentor junior engineers and Contract designers.
ï¶ Qualified in most of NanTel, EPRI, Unescorted Commercial Nuclear Facility access and in preparing Temporary Modifications, Design Verifications and Calculations.
ï¶ Involved in FMEA, PRA, Licensing Basis, 50.59 and supplemental engineering tasks to support Dry Spent Fuel Storage and upkeep of Balance of Plant Equipment.
ï¶ Very knowledgeable of Asset Suite, MAXIMO, Merlin, SAP and Oracle Database operating system applications.
ï¶ Engaged in EBOP power distribution & lighting, equipment sizing, engineering/calculations, Safeguards Access, Shop Drawing Reviews, QA’s, and 10CFR Part 20 Document Reviews.
April, 2007 – October, 2008
Senior Engineer
TRC Solutions/West Palm Beach, FL.
ï¶ Lead Electrical Engineer in the preparation of Construction Documents associated with Power Delivery and Transmission projects.
ï¶ Involved in the design/ upgrades/modifications to Progress Energy Transmission Planning, FP&L Nuclear Power Generation and RG&E substation facilities.
ï¶ Multi-tasked doing calculations and site surveys for facility compliance to NFPA 70E Arc Flash Hazard safety requirements, document verification in compliance with CFR 50.59, application of ASPEN One-Liner, Line Constants & Relay Database, ETAP, SKM/PTW and other technical assignments.
ï¶ Engaged in facility audits, proposal preparation, procedure writing, work orders & logistics, Project Management and Risk Analyses, Cost Estimates.
Nov., 2006 – March 2007
Confidential employer, Las Vegas: December
Service Contractor
ï¶ Performed Engineering and design support for a DOD/DOE Nuclear Weapons Facility.
ï¶ Engaged as a Design Originator as well as Task Quality Checker on Medium /High Voltage BOP/MOD projects.
ï¶ Tasked to perform Engineering, design and implementation of power distribution system projects, lighting, medium and low voltage systems in support of the KSC Space Launch Programs.
ï¶ Involved in Power System Analyses, protective devices coordination, Client/Vendor interface and document reviews on electrical power needs for radioactive storage facilities.
March 2006 – July, 2006
AMG/National Engineering/Dayton, OH
Contractor
ï¶ Engineering, design and Lead Electrical/Instrumentation Engineer in the design of a new Corn Processing/Ethanol Facility for Tate & Lyle in Fort Dodge, IA.
ï¶ Implemented major electrical equipment modifications and plant upgrade in the Loudon, TN facility.
ï¶ Task included short circuit, arc flash hazard evaluation for a combined 85,000 Hp corn processing / ethanol production facility.
October, 2005 – Feb, 2006
ABBTech/Parsons/IBM, New York
Service Contractor
ï¶ Contract to perform design and engineering of Low/Medium Voltage Power Distribution, Lighting, Grounding, UPS, LAN/Security Access & CCTV, HVAC Controls on the IBM/Poughkeepsie facility.
July, 2005 – October, 2005
Cape Design Engineering/Florida
Service Contractor
ï¶ Contractor performing design and engineering of Power Distribution, Lighting, Lightning Protection System, Security & CCTV, HVAC Controls on various Clients, including school facilities, airports, roadways, parking areas, lift-off movable platforms, manufacturing plants, Kennedy Space Center facilities and sewage treatment plants.
February, 2004 – July, 2005
M. Baker Engineering, New York
Consultant
ï¶ Design and implementation of Power Distribution, Lighting, Lightning Protection System, Security & CCTV, HVAC Controls on various facilities, airports, roadways, parking areas, passenger platforms, tunnels & bridges.
ï¶ Perform short circuit calculations and interconnection studies for medium voltage distribution feeder for a Water Treatment facility.
ï¶ Conduct value engineering, property and equipment valuation, risks analyses, constructability and logistics. Supervised junior engineers & designers.
ï¶ Resolved field installation and design conflicts.
April, 2002 –Oct 2008
Con Edison/Aerotek, New York
Consulting Engineer On-Call Services
ï¶ Performed Investment Grade Audits on potential Green Projects/Clients;
ï¶ Engaged in design and engineering of Distributed Generation and power distribution facilities.
ï¶ Preparation of physical design & concept, one line & wiring schematics, protective relaying/devices coordination including evaluation of electromechanical-to-digital relaying conversions.
ï¶ Field surveys associated civil and mechanical work.
ï¶ Preparation/review of bid documents, task budget and schedules.
ï¶ Develop updates on assigned outsourced project.
June, 2001- March, 2002:
Kvaerner Process/Immunex BioPharm, Rhode Island
ï¶ Develop one line & three-line diagrams, relay protection schematics, substation equipment lay-out, conduit/cable routing, equipment and panel schedule, for a 2-2x2500kVA, 69kV biopharmaceutical process facility.
ï¶ Coordinate with other engineering disciplines in the roll-out of deliverables on scheduled dates. Lead electrical design effort for power distribution and lighting for a pharmaceutical manufacturing facility.
ï¶ Determine potential project flaws, interference, and project workability.
ï¶ Design of bus and insulation supports, substation foundation, electrical manhole and duct bank trenches, validation of FDA/cGMP requirements for clean room process, contingency and risks analyses.
July, 2000 – May, 2001
EYP Mission Critical Facilities/Various Locations
ï¶ Performed short-circuit and load flow calculations to supplement Client’s QIP Program.
ï¶ Gathered field data and took actual measurements and used SKM/PTW to conduct analyses of multiple bus system.
ï¶ Engaged in the tests & commissioning of mission critical equipment, to include steady-state and transient load tests on PDUs, ASTSs, medium voltage switchgears, CRACs, communications, pre-action fire alarm and suppression, CRACs, UPS and emergency standby units.
08/97 – 06/00
Stone & Webster Engineering Corporation, New York, NY
ï¶ AMTRAK New York Penn Station: Construction Inspector/Project Engineer on a $30 million AMTRAK/LIRR project consists of replacement of 10 x 250-300 HP vent fans fitted with variable frequency drives, a new 3 x 7.5MVA, 27KV substation, SCADA, fiber optics signal/ communications, fire alarm systems, hazardous materials abatement, etc.
ï¶ Involved in substantial design efforts, program management for power distribution and lighting on municipal, industrial facilities.
ï¶ Supplemented QA document reviews and assessments on the relicensing of Vermont Yankee Nuclear facility.
05/96 – 08/97
Hayden/Wegman, Inc, New York, NY
Project Manager
ï¶ Interfaced with the Owner/Client and assisted in establishing the Mechanical/Electrical Design criteria for design upgrade of the 600MGD pumping facility.
ï¶ Initiated design of system one-line diagram, relay protection schematics, complying with Con Edison second contingency criteria, station hazardous heating and ventilation, lighting and odor control system.
ï¶ Established tasks, project schedule and cost controls.
07/90 – 05/96
Hazen & Sawyer, PC, New York, NY
ï¶ NYCDEP Croton Lake Gate House.
ï¶ As Senior Engineer/Electrical Inspector, responsible for the installation and testing of the 600kW emergency standby generator, water quality instrumentation, remote monitoring and control of motorized valves, chlorine leak detection and ventilation, and system integration into a single PC Central Station and Process Graphics Display.
ï¶ Perform continuous update of project status and engaged in field discussions with Contractor on work-around plans.
02/87 – 06/90
Morrison-Knudsen Engineers, Inc, New York, NY
ï¶ Port Authority of New York & New Jersey – PATH Main Repair Facility.
ï¶ As a General Engineer, coordinated the completion of all design documents of the $205 million PATH Main Repair Facility, a 207,000 SF main shop, AC/DC electrical substation and rail yard complex.
ï¶ Perform associated design tasks, including automated active rail signaling, substation SCADA Cable routing, rail yard electrical manhole and service boxes, preliminary construction cost estimates and project schedule.
MTA Metro North Railroad – Hudson & Harlem Line:
ï¶ Performed engineering calculations on allocation and optimization of substations on the Hudson Line, third rail extensions and was involved in design upgrade of station facilities including ADA compliance, platform lighting and ventilation systems.
03/85 – 01/87
Plaxall, Inc., Long Island City, NY
ï¶ Hunter’s Point Plaza.
ï¶ Principal Mechanical/Electrical Designer, Electrical Project Manager of this mid-rise commercial building located in Long Island City, New York.
ï¶ Provided the Owner substantial cost savings being able to develop work-around plans on a busy New York City commercial property.
ï¶ Design Energy efficient lighting, open space electrical distribution, BMS, Security & CCTV, emergency standby generator.
1978 – 1985
International, Philippines & Saudi Arabia
ï¶ Performed SCADA, instrumentation and control wiring for a 3x500MW dual fuel fired public utility power plant at 245kV.
ï¶ Experience gained in high voltage splicing, fiber optics cabling, electromechanical protective relaying/settings/installation and multi-national workforce supervision.
ï¶ Involved in the day-to-day operation and maintenance of a public utility power plant.
ï¶ Responsible for operations and maintenance on an assigned shift, load dispatch, protective relay adjustments/settings, load shedding and control, installation of balance of plant equipment to 230kV rating, supervision and training.
ï¶ Adjunct Lecturer in senior mechanical/electrical engineering university courses, mathematics and economics.
DESIRED SALARY AVAILABILITY
ï¶ Negotiable â—‹ Immediate
OTHER
ï¶ US citizen
ï¶ Badge for Unescorted Access to Commercial Nuclear Facilities
ï¶ Willing to relocate on Single Status.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.