I have worked exclusively on large industrial projects:
(10) years in Chemical Plants and Refineries, supervising Field Construction and Maintenance; and another (15) years for E&C companies, designing, purchasing and installing/commissioning large Rotating Equipment, including Gas Turbines, Generators, Compressors, Pumps and HVAC units.
P.E.: Registered Professional Engineer, Ontario, Canada # 17632019
STLE (old-ASLE): Society of Tribologists and Lubrication Engineers
SAE: Society of Automotive Engineers
SUMMARY:
Lead Mechanical Engineer with (30) years of professional experience in FEED, detailed engineering, construction and commissioning, with several years as a Lead Engineer and Project Manager/Engineer. Experience in Refineries, Oil & Gas facilities (both onshore and offshore), Petrochemical facilities and other large scale industrial projects.
Prepared sizing and equipment specifications for centrifugal gas compressors with gas turbine drivers, high pressure gas compressors, multistage pipeline pumps, heat exchangers, separators, glycol dehydration, refrigeration, hydrocyclones, flares and vent systems, sea water and tempered water cooling systems, filters, mixers, slug catches, pipelines and miscellaneous utility systems. Developed facility design concepts, scope of work, design evaluations, PFD and PID. Conducted client and management project reviews. Supervised and trained mechanical engineers and draftsmen in task force activities.
EXPERIENCE:
2006 - 2009
MUSTANG TAMPA (now Pegasus); Tampa, FL
Senior Mechanical Engineer
Assigned to various refinery and petrochemical projects requiring particular specialization in the design and specification of rotating equipment. Development of front-end engineering package specifications for licensed technology processes for projects requiring international tendering.
Prepared bid packages and analyzed equipment proposals to make purchase recommendations; coordinated with design disciplines; reviewed vendor drawings, calculations, and procedures for conformance to requirements, and good fabrication practices; resolved shop and field problems as necessary; worked with client and other engineering disciplines to develop requirements and maximize cost effectiveness.
2005 - 2006
MALCOLM PIRNIE; White Plains, New York, NY
Senior Project Engineer
As Senior Project Engineer, responsibilities included checking drawing submittals and witnessing testing of Pumps, Gas Compressors and Power Generators, for Manhattan and Bronx Sewage Treatment plants in New York City.
1997 - 2003
KBR (old Brown & Root); Houston, TX
Lead Mechanical, Hook-up & Commissioning Engineer
Planned and supervised the Hook-up and Commissioning activities, both onshore and offshore CANTARELL field in the Gulf of Mexico. Equipment included the following two major platforms for PEMEX:
1. Compression platform with a total of 120,000 HP GE gas turbines handling 900 MM SCFD natural gas, as well as Nuovo-Pignone Booster Compressors, and Solar Taurus-60 Turbo-Generators with 15 MW capacity;
2. Process Platform with TEG/MDEA gas dehydrating/sweetening, and propane refrigeration systems, and Elliott Barrel-type acid gas compressors;
All these equipment were driven by a total of (11) Solar Gas Turbines.
Supervised Oil Field improvements projects in Kazakhstan for TengizChevroil (TCO); prepared RFQ inquiry packages for Air and Nitrogen Compressors and Boiler Water Pumps, as well as API Data sheets, PID and installation drawings.
Prepared RFQ inquiry packages for Solar Taurus-60 Turbine-Generators, including API Data sheets and P&ID’s for ExxonMobil EAP Platforms in Nigeria. Prepared API Data sheets and driver selection estimates for Propane Compressors for the Onshore NGL plant.
Lead Mechanical Engineer for team of 3 Mechanical Engineers to develop conceptual engineering, detail design and construction for the new offshore platform AMHERSTIA for BP in Trinidad, including equipment inquiry packages and specifications. The process includes production separators, test separator, crude pumps, gas compression, water treatment, gas lift, heat exchangers, diesel and fuel gas generators, living quarters, well head manifolds, well testing control schemes, and miscellaneous utility systems for a gas platform to produce 33,000 BPD condensate and 825 MM SCFD gas.
1996 - 1997
MUSTANG ENGINEERING (Offshore); Houston, TX
Lead Mechanical Engineer
Lead Mechanical Engineer of a team of 7 Mechanical Engineers to develop conceptual engineering and detail design for the new EXXONMOBIL DIANA SPAR FLOATING platform in 5000 feet Deepwater in the Gulf of Mexico, including equipment inquiry packages and specifications for Solar Gas Compressors, Solar Taurus 60 Turbine Generators, Union-David Brown DB-34 Multistage Oil Pipeline Pumps and Peerless Firewater Pumps to handle 125,000 BPD oil and 325 MM SCFD gas.
1996
KBR (contracted to Aristech Polypropylene Plant); La Porte, TX
Manager of Plant Engineering
Manager of the Plant Engineering and Maintenance department of 30 workers. Supervised new Sulzer Gas Compressor and Sundyne Pumps installations, Durametallic Seal Applications and Repairs. Implemented a Computerized Vibration Analysis Program and reported to Plant Management.
1995 - 1996
LUBRIZOL Oil Additives Plant; Deer Park, TX
Supervised new pump installations. Designed and implemented a computerized Preventive Maintenance Program. Spearheaded the plant’s changeover from Synthetics to Mineral based Lubricants and monitored their performance.
1994 - 1995
FLUOR; Sugarland, TX
Prepared equipment inquiry packages and specifications for API Pumps and Compressors. Checked Vendor Drawings, Prepared Bid-Tabulations, selected and recommended Rotating Equipment for purchase. Projects included ADNOC, BPX Colombia, Cusiana-Cupiagua and Phibro Refinery. Revised the equipment files for Worthington and IR-SVG Reciprocating Compressors at the Rohm & Haas Plant.
1994
Plant Process Equipment; Houston, TX
Project Manager
As Project Manager for the Terra Chemical Projects; supervised the complete refurbishing of a Dresser Clark CRA 6 Reciprocating Compressor and its Westinghouse Synchronous motor for a fertilizer plant in Canada to be used in CO2 service. Designed new pistons, rods and clearance pockets, sized new cylinders and bottles with the Cooper’s Computer Program.
1993 - 1994
ARAMCO REFINERY; Yanbu, Saudi Arabia
Client’s Representative
Acted as the “Client’s Representative†reviewed and approved the Contractor Foster Wheeler’s proposed and ongoing upgrade work and equipment installations as part of KRUP Program to increase capacity from 170,000 BPD to 300,000 BPD. Equipment included Elliott and IR Compressors, Dresser-Pacific, Mitsubishi, Goulds-VIT and Worthington-HNN Pumps.
1992 - 1993
STEWART & STEVENSON (old Creole); Houston, TX
Project Manager
Project Manager for the Pennzoil Projects. Prepared specifications and performance calculations for two 100 MM SCFD Solar Centaur-40/306/307 Turbo-Compressor Packages to be installed on an Offshore Platform in Chirag, Gunashli Field in Baku, Azerbaijan. Prepared the complete scope of work and supervised refurbishing/packaging of equipment.
1990 - 1992
WORLEY PARSONS (old SIP); Houston, TX
Lead Engineer
Lead Engineer for Shell Refinery Projects. Prepared equipment inquiry packages and specifications for Union, IR and BW/IP API-610 Pumps, Milton Roy and Bran & Luebbe metering pumps, Klaus Union, IR Magnoseal and Goulds 3296 Mag Drive pumps and Worthington Steam Turbines. Supervised the installation of Sundyne LMV-331 pumps and John Crane type 2215 Bellows Seals in Benzene service at Shell Chemical Plant in Deer Park, TX. Reviewed vendor drawings to assure compliance with applicable API and ASTM Codes.
1990
McDERMOTT OFFSHORE (old Hudson Engineering); Houston, TX
Prepared equipment inquiry packages and specifications for Offshore/Onshore Oil & Gas Gathering Installations for Hunt Oil in Yemen. Equipment included Borsig and Gardner Denver reciprocating compressors and crude oil storage tanks.
1989
FLUOR; Kingston, ON, Canada
Lead Engineer
Lead Engineer for DuPont Projects. Prepared equipment inquiry packages and specifications for Goulds and Durco ANSI pumps and Viking Gear pumps for an expansion project. Managed a project to increase the nylon production capacity and installed a $5 million Autoclave equipped with immersion heaters, Chemineer mixers, gear pumps and John Crane Tandem mechanical seals.
1987 - 1988
KODAK CHEMICAL; Toronto, ON, Canada
Supervised a Mechanical Repair/Maintenance crew of (20) craftsmen. Completed (2) turnarounds on time and within budget. Specified a new roots blower and supervised its installation and start-up. Refurbished a Buffalo Forge Blower designing a new shaft and bearings. Installed John Crane double seals.
1985 - 1986
NOVA (old Polysar) ETHYLENE PLANT; Sarnia, ON, Canada
Manager of Plant Projects
Specified and installed a Delaval Steam Turbine, performed hot & cold alignment checks and vibration and soft foot tests. Supervised the refurbishing of an Ingersoll-Rand 30,000 CFM Axial Compressor. Solved pulsation problems with Cooper Reciprocating Ammonia and Ethylene compressors, coordinating with Southwest Research Institute of San Antonio, TX. Re-rated compressors performing cylinder sizing, shaft stiffness L3/D4 and valve efficiency and clearance pocket calculations.
1978 - 1983
BP OIL REFINERY; Toronto, ON, Canada
Manager of Plant Projects
Supervised project and maintenance work on rotating equipment in the refinery, including hydrogen compressors and API pumps, mostly BW/IP and Union equipment. Completed (5) turnarounds on time and within budget. Prepared and implemented a plant wide Preventive and Predictive Maintenance Program.
1976 - 1977
TRANSCANADA PIPELINES; Toronto, ON Canada
Project Engineer
Worked as a Project Engineer on upgrading compressor stations. Prepared equipment inquiry packages and specifications, design and layout drawings for Reciprocating and Centrifugal Compressors, Rolls Royce Gas Turbines and Natural Gas Transmission Pipes and Valves for the 42†diameter 1000 PSIG line.
1974 - 1975
WESTINGHOUSE GAS TURBINES; Hamilton, ON, Canada
Project Engineer
Worked as a Project Engineer on experimental prototypes of gas turbines and turbine generator sets. Evaluated new rotor designs using Stress and Thermal Analysis Computer Software Packages and prepared Reports for Management.
1970 - 1972
GE TURBO Machinery (old Creusot-Loire); Le Creusot, France
Project Engineer
Worked as a Project Engineer. Tested and evaluated the performance of 22,000 HP multistage centrifugal gas compressors being manufactured for Sonatrach’s Arzew LNG Plant in Algeria. Supervised the refurbishing of a 345 MW steam turbine build under Westinghouse license for Craiova Power Station in Romania.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.