International Degreed HVAC Air and humidity handling Professional Automation engineer with Design, Management and Supervisory experience Onshore and Offshore accommodation modules from Alaska to the Middle East including commissioning of Siemens, United Technologies,Trane, Goodman, Liebert, Johnson Controls Metasys and Honeywell instrumentation.
Summary of Skills: International Degreed HVAC Air and humidity handling Professional Automation engineer with Design, Management and Supervisory experience Onshore and Offshore accommodation modules from Alaska to the Middle East including commissioning of Siemens, United Technologies,Trane, Goodman, Liebert, Johnson Controls Metasys and Honeywell instrumentation.
Sales and Marketing support in technical sales presentation and prparation of engineering quotations for bidding of projects.
HVAC Publication Thesis: Design of a fully Automatic precision HVAC and humidity Control Systems based on number of occupants for a Metrology Laboratory of National Standard.
Career Progression
LIY Corp 2007 - present
Assigned to field in a supervisory capacity:
• Provided back-up support to the HVAC Field Construction Manager.
• Directed and supervised lead personnel of the operating and Construction Engineering and Quality Control.
• Vetted prime contractor Worley parsons and Foster Wheeler sub-contractor Furnace, Heater, Control Room HVAC design engineering.
• Reviewed and approved PLC logic and Cause and Effect Diagrams in compliance with NFPA85.
• Co-coordinated with engineers and craftsmen of multi-discipline activities
• Interfaced with Trade Unions.
• Insured design compliance with Project’s Design Specification.
• Managed HVAC instrument design and interfaced with the plant Notifier Fire and Toxic Gas control system.
• Approved time sheets.
• Insured that the field workforce organization is comprised of qualified and knowledgeable personnel, and insuring effective personnel utilization.
• Established, coordinating and implementing construction schedules, manning charts, and material and equipment requirements.
• Controlled jobsite expenditures for labor, equipment, material and services and insuring field operations are within budget.
• Exercised full responsibilities in Electrical, Instrumentation, telecommunications and Control engineering.
• Insured performance evaluations are conducted on assigned personnel and counseling programs are maintained.
• Insured subordinate personnel and co-op students receive progressive training to enable them to assume additional responsibilities.
• Provided assistance in the administration of assigned change orders and areas of contractual activities
• Applied corporate H&SE procedures.
• Participating in contracts and subcontracts negotiations.
• Maintaining good relationship with the client and their representatives including subcontractors.
• Estimate man-hours and materials.
Kellogs Brown & Root Technical HVAC E I & C Engineering Advisor 2007 - 2009
• Prepared Technical Bid Evaluation and technical interface with clients on technical issues.
• Control Room HVAC Cost estimated and performed proposal engineering
• Revamped HVAC equipment for power and heat integration and EPA air emission requirements for Conoco
• Ensured Control System logic is line with the Emergency Shutdown System.
• Packaged HVAC and Air handling units.
• Reviewed and provided comments to PFDs, UFDs, P&IDs, Single Lines, Equipment and Material Specifications and Material Selection Guides.
JEG Inc, Senior Principal HVAC I & C Facility Engineer 2004 -2007
• Designed Control Room HVAC
• Interfaced HVAC with the plant Emergency Shutdown System.
• Issued request for quotes
• Reviewed bids
• Configured points in the DCS and the ESD SIS
• Sized, specified and requisitioned additional instruments.
• Coordinated with suppliers for packaged equipment
• Reviewed packaged supplied equipment.
• Conducted inter-discipline meetings with Electrical and Mechanical
• Collected comments from Electricals and Mechanicals.
• Submitted all comments to suppliers
• Approved document for construction
• Witnessed tests at fact
• Approved for release
Highlights ExxonMobil Projects Upstream HVAC E I C facility Engineer 2003- 2004
• Insured accelerated completion of critical path and near critical path work per the Project target schedule.
• Coordinated with Project Controls to ensure consistency in the development and application of project trending and monitoring procedures, including Project Deviation Notices (PDN’s).
• Supported HVAC Field engineering and Commissioned an electricity Power Co- Generation plant for ExxonMobil in Labarge Wyoming using GE Aero Frame 6 Gas Turbines in conjunction with the GE Speedtronic Mark VI and Waukesha Steam Gens. HPAcid Gas Injection well pump controls and redundancy design with and without lead lag configuration.
• Participated in HAZOPS and insure action closed out.
• Coordinated with EPC contractors in Drilling, Reservoir acid gas injection to insure quality design and timely delivery of products and equipment as per the schedule.
• Supervised project designated HVAC instrument designers and draftsmen in the execution of their duty.
• Provided startup assistance.
• Overhauled HVAC mechanical and electrical equipment during the startup.
• Coordinated with other disciplines and package equipment vendors, e.g. compressor
• Provided installation centrifugal, recip, Screw compressor & control systems.
• Overseeing the design of contractors, Aker Kvaerner on the Sable Island Offshore platform complex, including the design of the HVAC on the accommodation module and an Operator Training simulator with Competency assessment withy interface with the platform complex ESD.
• Trained offshore engineers in safety engineering API14C/E/F/500/505.
• Insured that contractor and subcontractors execute according to EM QA/QC level.
• Conducted quality audits.
• Monitored and provided inputs on EPC contractor on progress to higher management.
• Insured that assignments are completed within the schedule & budget.
McDermott, Senior HVAC Offshore Engineer 2002 - 2003
• Packaged the accommodation module HVAC, DCS & ESD
• Interfaced with Inter-platform and offshore to shore tecommunications via VSAT
• Interfaced with Main and Emergency Electricity Generators c/w interface with platform Spars DeltaV DCS and ESD SIS for Murphy 2003
• Produced water treatment, analyzer design meeting United States Coast Guards and Mining
• FAT & Offshore SAT of all E&IC equipment
• Presented LOPA Training lectures & facilitated HAZOP.
• Coordinated with Universal Ensco team of engineers in validating the Colorado Interstate pipeline integrity Control Room SCADA and HVAC design.
• Designed the HVAC pump, compressor, and metering stations for Duke Power.
• Coordinates assignments with Electric Utility Department and other Departments' staff;
Directs, trains, evaluates, and, coordinates in the construction, maintenance, troubleshooting, repair and operation of power substations and meters;
• Directed, trained, and evaluated technical staff in the maintenance, calibration, troubleshooting, and repair of HVAC control system and sensors.
• Interacts with customers when solving HVAC and Humidy problems;
,sags and metering problems;
Halliburton Brown & Root Senior HVAC TEIC Engineer 2000 - 2001
• HVAC engineering
• Conducted Reliability studies and Root Failure Cause Analysis on electrical equipment Continuous emission and process analyzers, large Pumps Compressors and gas turbines for B.P, AMOCO Chocolate Bayou.
• Implemented cooling systems in the cooling of the Gas turbines.
• Provided technical leadership for the site through optimization of HVAC electrical I & C equipment.
• Proactive identification of failures and immediate resolution of plant issues
• Provides technical assistance to Operations, Maintenance and sub contractor personnel.
• Development and maintained Corporate Control systems standards.
Teledyne, SCADA, HVAC, Marketing & Application support Manager 1995 -1999
• Successfully converted the first Windows SCADA operating system from the VAX VMS.
• Provided sales assistance and client technical support.
• Presented SCADA conferences at Exhibit halls and Convention centers.
• Provided assistance in Control Room HVAC Control room design with automatic toxic gas ingress warning.
• Design Air handling units with Hydrofluoric acid emission with automatic EPA 24-hour reporting
• Trained client’s personnel in use of EFM equipment.
Halliburton Brown & Root HVAC TEIC Senior Consultant 1990 – 1994
• As grade MA, Prepared conceptual designs and material and labor estimates for proposals and orders.
• Lead the SCADA, HVAC, ESD and DCS team on the Central Graben gas Transmission Project for AMOCO in 1992-93.
• Designated the platform HVAC For Hibernia Field development, Newfoundland.
• Checked and approved all philosophies, design specifications, data sheets for HVAC control and fire & gas sytem.
• Planning, progress monitoring, forecasting and reporting
• Prepared weekly instrument progress and expenditure reports.
ABB CE Power Business Development & Proposal Engineer 1984 – 1990
• Insured design in compliance with NFPA85
• Reported directly to the Proposal Director, responsible for detailed evaluation of scope of supply, specification.
• Supported sales during customer presentations and participated in contract negotiations on technical issues.
• Attended bid invitation meetings, reviewed delivery, terms and conditions.
• Prepared proposals according to customer RFQ
• Followed up with account managers
• Organized walk downs on existing facilities
• Issued clarification notes
• Negotiated with the customers products offered.
• Marketed to the customer perception of the team and product offered.
• Monitored team’s performance in order not to miss the bid presentation dead line.
• Conducted post mortem win/loss analysis on every RFQ.
• Supported front end "spec-in" activities with EPC and end clients to open up new accounts.
• Supported staff in design specification and purchasing to produce and fabricate special parts for system design.
• Used Markov to perform risk analysis for every inquiry for tender.
• Design & Commissioned Boiler & Burner Management Systems for Electricity Generation Authority Thailand & Miramichi Power
• Consolidated Paper Chemical Recovery Boiler.
• Great Lakes Forest Products Chemical Recovery Boiler
• Nekoosa Chemical Recovery Boiler
• Effluent treatment
• Analyzer design meeting EPA regulations
• Georgia Pacific Chemical recovery Black Liquor Boiler.
• Conducted project progress meetings, prepared and approved all cost estimates
 Developed preliminary implementation plan, carried out estimating, proposal
 Preparing instrument man-hour estimate to perform project tasks.
School Laboratory: The design of fully automated HVAC laboratories of University Oxford and Cambridge standards.
Special Skills: Have knowledge in Utilizing Siemens, Honeywell and Johnson Controls Metasys HVAC software. Windows 95 operating systems, and office software packages such as Advanced Microsoft Winword, Excel, Project Schedule & Access.
Language Skills: Speak and write fluent
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.