To be able to serve the country, protect the health, interest and safety of the public, acquire a PE license, and be remembered as an accomplish Civil Engineer and an Author.
Romy
Civil/Structural Engineer
Result Oriented Consulting Engineer for Design and Projects Implementation. Possess a proven record of more than 20 years of experience in Saudi Arabia and the Philippines in Structural Design and Construction Management of Buildings, Civil and Industrial Structures, including Drainage, Water Supply, Roads, Bridges, Reservoirs and Process Industry. Contributing to the quality performance and productivity of Multi National Contractors. Skillfully managed designs and reviews drawings of all disciplines, establish office, site protocols and QC/QA procedures. Cultivate strong working relation with all members of the organization, contractors and clients. Create and lead result oriented team, providing guidance, training and knowledge of design, project management, contract specifications and administration, meeting the company and client’s goals and business objectives. Works with minimum supervision, an educator, a problem solver, a permanent resident, in the process of continuing gainful professional practice in the United States, has acquired EIT license and is in the process of acquiring a PE license.
¬¬¬¬¬¬¬¬
Project Management • General Structural Design and Planning Operation• Plant Engineering • Process Improvement • Capital and Maintenance Projects Design and Development • Codes and Regulatory Compliance • Construction of Capital and Maintenance Projects • Implementation Planning
Logistics and Cost Control • Special Projects • Staff Training
Client and Vendor Relations•Team Building and Leadership
______________________________________________________________________________
Professional Experience
PHYSMED INC. 4905 S, 107th Ave. Omaha, NE 68127 •2008-2009
Owner Representative for Facility Improvement (2008-2009)
Conduct Inspection of Buildings for sale, and report status on usability and adaptability for Health Care Operations. Evaluate building, existing facilities and advise owner on required improvements.
Service Highlights: Facility Proposed Improvement (Design and Build),
Preparation of Preliminary Design, Scope of Work and Job Description.
• Layout of the Basement, Lighting, and Telecommunication
• Elevator Sizing, Foundation and Building Structural Support
• Utility and Potable Water, Waste Handling system, Emergency Power, and Fire Fighting
Credentials Evaluation by ABET/CPEES and State of Nebraska (NBEA) • 2006-2008
• Preparations for NCEES exams; Acquired EIT certificate # EI-8880
• Preparation for PE exams
Abalkhail Consulting Engineers, Riyadh, Kingdom of Saudi Arabia •1985-2005
Contractor for the Design and Construction Supervision of the Riyadh Qassim Water Transmission System (RQWTS), Saline Water Conversion Corporation (SWCC), Kingdom of Saudi Arabia
Site Manager; Repair of 2-48ӯ Pre-Stressed Concrete Pipeline Segment 4 - 64.38 miles (2004-2005)
Project Cost: $ 129, 941,344.00, Contractor: Yuksel Insaat A.S., Turkey
Managed Civil, Structural, Electro Mechanical, Instrumentation Inspectors, and Coordinate Inspection works with Client and Staff. Provide test procedures and parameters to ensure code and client compliance
Project Operational Highlights:
• Developed Design and Install Thrust Blocks at failure joints
• Prepare Repair Procedure of Pre-stressed Concrete Pipeline
• Review Transient Pressure and Influence of Hydraulic Conditions on Controls and Pipe Failure
Project Manager, Commissioning and Testing, Warranty Period (Feb-Oct 2004)
RQWTS, SWCC, Kingdom of Saudi Arabia; Project Cost: $519,121,734.00;
Managed Civil, Structural, Mechanical, Electrical, Instrumentation Inspectors. Developed the Testing and Commissioning Procedures. Assist Client in the training of Operation and Maintenance Personnel. Developed punch list for Civil, Architectural, Mechanical, Electrical, and Instrumentation works. Supervise multi-national contractors.
Project Operational Highlights:
• Operate the three Pump Stations, Calibrate Instruments and Monitor Water Quality
• Establish Operating and Maintenance Procedures
• Monitor Pipelines and Hydraulic Enhancements
Site Manager, Mechanical Completion (2002-2004)
RQWTS, SWCC, Kingdom of Saudi Arabia
Managed Civil, Structural, Mechanical, Electrical, and Instrumentation inspectors. Establish Commissioning and Rehabilitation Procedures. Monitor Status of Equipments, Above Ground, Under Ground Installations, Review Scope of Works and Variation Orders. Supervise multi-national contractors.
Project Operational Highlights (Commissioning and Testing of):
• Test and Disinfect Twin 48” Steel and Prestressed Concrete pipe- Line, 170.62 miles
• Test and Disinfect 2- 16” Steel Reinforced Concrete Lateral lines, 60 miles and 22 miles
• Test and Disinfect 25- Pre-stressed Concrete Tanks: 13,210,000 Gallons; 5,284,000 Gallons and 2,114,000 Gallons capacity, including 3-RC Surge Water Tanks
• Test and Operate Three Pumping Stations, Four Storage Terminals and six Block Valve Stations
Resident Engineer: Hydraulic Enhancement, Station and Terminal Contact #4 (1996-2002)
RQWTS, SWCC, Kingdom of Saudi Arabia; Project Cost: $ 28,710,653.00
Managed Civil, Structural, Mechanical, Electrical, and Instrumentation Senior Engineers in the Design, Review and Construction Supervision of Pressure Relief Systems, Surge Vessels and Control Structures.
Project Operational Highlights: (Design and Construction)
• Site Survey and Review of Geotechnical Studies
• Site Grading, Roads and Drainage Systems (Eight Sites)
• Steel Surge Vessels Plant, Plant piping flexibility, and Concrete Foundations
• Pre-stressed Concrete Operating Tanks, Pressure Relief System, and Overflow Drainage
• Steel Flow Control Buildings
• Installation of Telecommunication, Cathodic/Lightning Protection, and Grounding
Project Manager: Design of Structures and Utilities (1994-1996)
Saudi Aramco, Riyadh Refinery, Riyadh KSA
Manage Civil, Structural, Mechanical, Electrical Design Engineers, Quantity Surveyor and 8 CAD drafters in the Design and Construction Assistance of Oil Refinery Improvements.
Pipe Rack and Pipe Replacement Contract Highlights:
• Pipe Rack Design, CAD Drawing and Preparation of Construction Specification
• Preparation of Estimate, Schedule, and Materials Ordering
Riyadh Refinery Potable Water System Contract Highlights:
• Design of Dual Supply Pumping Stations, and Distribution Systems
• Preparation of Civil, Mechanical, Electrical, P & I Drawings and Construction Specification
Upgrading of Bulk Plants System Drawings Contract Highlights:
• Upgrading of Civil, Mechanical, Electrical, Instrumentation and P & I Drawings
• Recalculation of Drainage, Piping, Equipment, and Process Parameters
Senior Civil Engineer: Station and Terminal Contract #2 & #3 (1988-1994)
RQWTS, SWCC, Kingdom of Saudi Arabia; Project Cost: $ 79,190,255.00,
Managed the Design and Construction Supervision of Station Facilities and Site Infrastructures. Establish QA/QC Procedures. Conducts On Site Civil, Architectural, Structural Tests. Establish Survey Controls.
Project Operational Highlights: (Design and Construction)
• Review Geotechnical Studies, Survey and Site Development (Six Sites)
• Pumps, Electrical Equipments and Lighting Posts Foundations
• Roads, Drainage, Manholes, Potable and Utility Water Systems
• Steel Pump Houses, Overhead Cranes, Workshops, Offices, Warehouses, Substations, Switchgears, Water Treatment and Control Buildings (Six Sites) and Staff Housing
Senior Civil Engineer: Storage Reservoir Contract (1985-1988)
RQWTS, SWCC, Kingdom of Saudi Arabia; Project Cost: $ 27,032,799.00
Managed the Design and Construction Supervision of Concrete Reservoirs. Establish QA/QC Procedures
Project Operational Highlights:
• Review Geotechnical Studies, Survey and Site development (Five Sites)
• Design Review and Construction of 11- 5,284,000 Gallons Pre-stress Concrete Tanks, (Slip Form)
• Design Review and Construction of 6- 13,210,000 Gallons Pre-stress Concrete Tanks, (Slip Form)
Paper Industries Corporation of the Philippines, Bislig Surigao Sur, Philippines• 1972-1984
Producer of Plywood, Timber, Logs, Lumber, Wood Chips and Paper Products
Department Head, General Engineering Services Department (1983-1984)
Plant Engineering, Engineering Design, Construction and Maintenance Departments. Managed 8- Plant Projects Engineer, 6- Design Engineers, 6- Draftsmen, 3- Planning Engineers, 6- Construction and Maintenance Engineers, 6- Foremen, and Tradesmen. Train Interns on Design and Construction methods
Operational Highlights: (Design and Construction)
• Process Improvements and designs to Reduce Manufacturing Costs
• Equipment and Machinery Foundations
• Timber, Steel and Concrete Bridges, Roads, and Drainage Systems
• Pre-Cast RC, Concrete, Timber, Steel Buildings and Structures
• Reinforced Concrete Underground/Above Ground Tanks and Towers
• Process Piping/Cable Support/ Waste Handling Systems
• Substation Cable Towers, Transformer Foundations and Cable Tray Supports
Other Positions in the Company:
Senior Project Engineer for Special Projects (Jan. to Nov. 1983)
•Construction of the 20 MW PICOP/National Power Corporation Tie-ups, Transmission Line
Chief, Design Engineer; Engineering Design Department (1981-1982)
•Managed Design Engineers, Draftsmen, Material and Cost Control Engineers
Senior Design Engineer; Engineering Design and Planning Department (1972-1981)
•Managed Design Engineers and Draftsmen
Saint Peters College, Sabayle Street, Iligan City, Lanao Norte, Philippines •1970-1972
Department Head, College of Engineering
Managed the Engineering Instructors Recruitment, Subject Distribution, Updating of Syllabus and
Orientation of New Instructors. Played a Key Role in the 300% increase in Enrollment.
Operational Highlights:
• Mathematics, Surveying Instructor and Engineering Reviewer
• Develop Report to Top Management, Revenue Projections and Oversee Quality Instructions
Bureau of Public Highways, Philippines • 1969-1970
Junior Civil Engineer, Highway District Engineers Office, Lanao Del Sur (1969-1970)
Managed Engineering Aides, Contractors, Construction and Maintenance Crew
Section #2 Operational Highlights:
• Construction and Maintenance of Roads and Bridges and conduct Bridge Site Surveys
• Preparation of Project Schedule and Program of works
EDUCATION/LICENSE
• Bachelor of Science in Civil Engineering - Cebu Institute of Technology, Cebu, Philippines
• BSCE Degree Credited by the State of Nebraska Board of Engineers and Architects
• BSCE Degree Credited by the Kansas State Board of Technical Professions
• EIT certificate # EI-8880, Granted by the State of Nebraska Board of Engineers and Architects and
NCEES dated June 24, 2009
• Civil Engineer, License # 8982, Granted by the Professional Regulation Commission, Philippines
PROFESSIONAL DEVELOPMENT
• ASCE/LOCATE Annual Transportation Conference (ASCE, April 9, 2010)
• Who’s In Charge of Your Integrated Project? (NBEA, 10/22/2009)
• PERT/CPM for Construction Management
• Construction of Pre-stressed Concrete Bridges
• Design of Highways, Bridges and Airports
• Problem Analysis and Decision Making for Middle Managers
• Structural Analysis and Design of Multi Storey Reinforced Concrete Buildings
• Computer Aided Design (AutoCAD)
• Corrosion Protection of Concrete Reinforcement
AFFILIATION
• National Society of Professional Engineers (NSPE)
• A.M. American Society of Civil Engineers (ASCE)
Technical Skills
• Familiar with the following Software’s: MS Word, Excel, STAAD PRO, AUTOCAD
• Broad Internet Knowledge
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.