16. JML MANUFACTURING CORP. = PRODUCTION SUPERVISOR
EMPLOYMENT HISTORY:
CURRENT:
INTERNATIONAL ENGINEERING GROUP (based in Amman Jordan)
Responsibilities as Sr. PROJECT MANAGER; Erbil Iraq Projects
• Manages the entire Engineering Group, Construction Group and Property Estate Developments.
• Develops strategies for the fast and effective approach for good construction schedule and good planning for cost effective developments.
• Manages different engineering disciplines, ie; Mechanical, Electrical, Civil, Structural Engineers and Architects.
• Manages safes on-time and profitable delivery of the Projects to the clients' quality standards.
• Checks and controls cost of all developments. Monitors general condition costs and maintain cost, productivities and budget controls
• Provide leadership and direction to all project operations, including mobilization of equipments, site facilities, staffing, scheduling of in-house self performed and /or subcontracted works.
• Bids and awards sub-contract works to different sub-contractors.
• Checks schedules against program and Review contract/tendering documents to ensure a thorough understanding of the contract requirements.
• Resolves any contractual/legal matters or complications and assure appropriate action is taken.
• Manages variation orders, contracts, sub contracts and resolution of issues
• Recommends value-engineering to the group of designers.
• Exercise strict control over expenditures and initiate to bring them under control and provide input to regular construction progress reports to the company Head Office.
• Establishes and maintains good relations with clients and local authorities aimed at safeguarding and promoting company interests.
• Ensures that all punch list items are resolved, client hand over is satisfactorily conducted and that there is no prolongation of the project.
On- going Projects:
• Land Developments, Bridges and Road Constructions
• 30 Has. Commercial, Hotel and Mixed-Use Developments
• Housing and Condominium in Medium Rise Buildings
• Clusters of High-Rise Buildings
PREVIOUS:
1. OTIS E&M PHILIPPINES [at] 14th floor Petron Mega plaza bldg.
Sen.Gil Puyat Ave. Makati City Phils. ( American Company )
Responsibilities as COUNTRY CONSTRUCTION/ PROJECT
MANAGER from Oct.6,2008 to Sept. 30,2009
• Responsible for the Nationwide Operations (Philippine Area)
• Handles more than 270 projects with 15 Contractors
• Attends meetings with the clients and owners representatives and consultants
• Presides meeting with Sales and Construction Staffs.
• Manages 2 Area Managers,10 Field Engineers and 35 Mechanics
• Reports directly to the General Manager/ President
2. PHILIPPINE –SUNDT CONST. DEV’T. CORP. [at] Clarkfield Pampanga
( American Company )
Responsibilities as SR. PROJECT MANAGER
From Aug. 2007 to Oct.1,2008
• Reports directly to the President
• In charge of the Property Management and Construction/ Project Management.
• Coordinates with the designers and Consultants regarding the Concepts of the Proposed Developments, regarding technical aspects,ie, Fit-out Works, Structural Works, Drainage lines, Road Dev’t., Lottings, water lines, Slope protections, Sewer treatments, Maximum Saleable Areas. For legal aspects, ie, Government permits and Environmental permits.
• In charge of the Project Operations and Constructions.
• In charge of the Bidding and awarding of Selected Sub Contractors.
PROJECTS UNDERTAKEN ;
1. Australian Embassy total renovation and Fit-out.
2. JP Morgan Call Centre Fit-Out works.
3. British School Construction
4. Israel Embassy Interior Fit-out
5. NCO Call Centres Building Construction and total Fit-out
6. Deutsche Bank Building Construction ,Interior Fit-out & Refurbishing
7. Shangrila Hotel Interior Fit-out
8. HSBC call center Fit-out.
9. Philippine Christian Foundation School Building construction.
10. Werdenberg Restaurant building construction and finishing works.
11. Rockwell East and West Tower interior fitout and finishing works.
3. EEI CORPORATION INC. [at] Bagumbayan Libis Quezon City
(Top Construction "AAA"Corporation in the Philippines)
Responsibilities as SR. PROJECT MANAGER
From Sept. 2006 to Aug 15,2007
Mixed- Use Developments
• Manages more than 50 Trade Sub- Contractors ( Excavation Works, Rebar Works, FormWorks, Mechanical Works, Electrical Works, Electro Mechanical Works, Masonry Works, Pre-casting Works, Cabinetry Works, Partitioning & Fit-Out Works, Roofing Works Water Proofing Works, Glass & Aluminum Works and Painting Works, Land Scaping Works, Swimming Pool Works)
• Manages group of Project Superintendents, Construction Managers, Project Coordinators, Logistic Supports, Commercial Supports, Gen. Foremen, Supervisors, and More than 2,000 Admin workers.
• Sets meetings and coordinates with owners Representatives and Consultants with regards to technical issues, Quality, Safety and other concerns.
• Strict Classification Schedule of flow of materials and logistic supports.
• Reports to the President.
• Suggest value engineering solutions for cost effective project.
• Bids and awards to selected Sub-contractors.
• In-charge of the whole Project.
PROJECT FINISHED;
1. AYALA LAND SERENDRA CONDOMINIUM PROJ.[at] Global City
A cluster of high-end Medium Rise 15 -storey with 4-Basement Parking and Hi-Rise 55-storey with 4-Basement parking Condominium with High-End amenities with the total budget cost of 1.5 Billion Pesos
4. WERR CORPORATION INTERNATIONAL [at] Parc Bldg. Bruger St. Putatan
Muntinlupa City. ( Foreign Group Construction Firm)
Responsibilities as TECHNICAL DIRECTOR
From Nov. 2004 to Sept. 2006
Hotels and Condominiums
• In charge of negotiating / bidding with the Clients with regards to their Proposed Projects.
• Manages the Operations of the on-going Projects. Over see the Construction, the Schedules, Manpower, Quality, Safety, Materials and Logistics.
• Checks bid documents & estimates for bidding.
• Negotiates and awards the Projects to the selected Sub-contractors and suppliers.
• Reports directly to the President
• Develops best Strategies with regards to Project Management pertaining to Technical issues , Administration, and Procurement of materials.
FINISHED PROJECT:
1. 6 clusters of 8-Storey Horizon WestRidge Condominium at Tagaytay Midland
5. NORTH LIGHT RAILWAY CORP. [at] BCDA Compound Forth Bonifacio
( Chinese Group and Philippine Group Joint Venture )
Responsibilities as PROJECT DIRECTOR
From Feb. 15,2005 to June 30, 2005
( Project was put on-hold temporarily due to Government Controversies )
• Manages the Railway Operations Projects. Over see the Construction Schedules, Manpower, Quality, Safety, Materials and Logistics.
6. EAGLERIDGE DEVELOPMENT CORP. [at] Chateau Verde Condominium Gate 2 Valle Verde Pasig City
Responsibilities as SR. PROJECT MANAGER
From Oct. 2003 to Oct. 2004
Land Developments and Housing Developments
• In charge of the Operations Project Management
• Manages on-going project developments, with regards to methodology, timetable, quality, cost effectiveness, materials, equipments and manpower.
• Handles number of Engineers, Architects & Several trade Contractors.
• Coordinates with the different Consulting Firms with regards to design problems.
• Evaluates and awards bid proposals.
• Presides Plans & Programs to Management coordination meetings.
• Reports directly to the President.
• LIST OF PROJECT COMPLETED: VACATION RESORT
1. GREENLAND’S RESIDENTIAL PLANTATION HILLS [at] TAGAYTAY HIGHLANDS - 120 has. Rolling land Development complete with utilities…
10km. Asphalted roads, underground water supply system from deepwell source to overhead steel water tank, electrical system, CATV & Tel. System. Drainage , sewerage system. Earth Dams, Sabo Dams and total Slope Protection System.
7. VIFERSON ENG’G. & DEVELOPMENT CORP. [at] Ermita Center Bldg.,Roxas Blvd. Ermita Manila
Responsibilities as ENGINEERING/ PROJECT DEVELOPMENT MANAGEMENT DIVISION HEAD from Nov. 15,2001 to Oct 15, 2003
FOR PROJECT OPERATION:
• Responsible for the whole Project Management, and Property Development.
• Prepares budget cost and analyze cost-saving measures for the whole project.
• Analyses the project development cost against saleable cost.
• Conducts the necessary Technical Studies needed for the project such as Drainage Systems, Electrical Distribution Systems, Water Distribution Systems, Communication Systems, and Road network system.
• Coordinates with the Master Planner and with the other discipline Designers.
• Conducts a bidding conference for all Designers and Contractors.
• Evaluates the bidding results.
• Awards the winning bids for the winning Designers and Contractors.
• Supervises the mobilization of the Contractors.
• Directs orders to Project Managers and 17 Engineers ,5 Supervisors,3 Accountants, 2 Business Dev’t. Officers and 5 Sales Managers with their Sales Team.
• Presides weekly coordination meetings with all Contractors and Designers.
• Approves, rejects and evaluates contractors billing.
• Sets meetings with the Sales staff for the technical guidelines of the project.
• Conceptualizes development, strategies & programs for marketing objectives.
• Coordinates with Local Gov’t. Agencies such as, DENR, DAR, PAG-IBIG, Municipality Sanguniang Bayan.
LISTS OF PROJECTS :
• 50- Unit High-End Condominium Townhouse and Site Development with complete amenities and Facilities worth P 375 Million located at the heart of Cebu City.
• Flood Control Projects of Phil. Phosphate , of Iloilo City for its expansion near the seashore worth P 145 Million.
• Rehabilitation and Maintenance of Philphos structural warehouses and offices affected by the corrosion of chemicals, worth P 75 Million.
8. LANDCO PACIFIC CORPORATION [at] Centermall Bldg. BF Homes, Pres. Ave. Sucat ( Leading Developer In the Philippines)
Responsibilities as TECHNICAL DIRECTOR from Jan. 28,2000 to Oct. 30,2001
Resorts and Mixed-Used Developments
FOR PROJECT OPERATION:
• Responsible for the whole Project Development, and Property Management.
• Prepares budget cost and analyze cost-saving measures for the whole project.
• Recommends engineering strategies and methodologies for value engineering.
• Analyses the project development cost against saleable cost.
• Conducts the necessary Technical Studies needed for the project such as Drainage Systems, Electrical Distribution Systems, Water Distribution Systems, Communication Systems, and Road network system.
• Coordinates with the Master Planner and with the other discipline Designers.
• Conducts a bidding conference for all Designers and Contractors.
• Evaluates the bidding results.
• Awards the winning bids for the winning Designers and Contractors.
• Supervises and oversees the Project developments with regards to quality and timely completion.
• Directs orders to Project Managers and 17 Engineers ,5 Supervisors,3 Accountants, 2 Business Dev’t. Officers and 5 Sales Managers with their Sales Team.
• Presides weekly coordination meetings with all Contractors and Designers.
• Approves, rejects and evaluates contractors billing.
• Sets meetings with the Sales staff for the technical guidelines of the project.
• Conceptualizes development, strategies & programs for marketing objectives.
FOR LEGAL ASPECTS:
• Manage other properties and sets program of works to make it economically feasible.
• Gathers information where is the best location for the proposed project expansion.
• Informs management and recommends the best location and viability of the site.
• Checks the legality of the property pertaining to titles and ownerships.
• Coordinates with all landowners for easy consolidation of all the properties
• Informs management for the settlement of the cost of the land.
• Arranges the survey team to verify lot boundaries and total land area.
• Sets a meeting with DENR for ECC application.
• Coordinates with consultant for EIS/EIA study.
• Coordinates with Local Govt. Units for Development Permit.
• Coordinates with Local Govt. Units for Reclassification of the property.
• Coordinates with D.A.R. for property Conversion and Exemption.
• Coordinates with the O.S.G. (Office of the Solicitors Gen.) for property petitions.
• Sets a meetings with HULRB for application of License To Sell.
• Reports directly to the Pres. & Vice Pres..
LISTS OF PROJECTS :
RESORTS and HOTEL Projects involved from the Planning Stage to implementation.
• Leisure Farms Project – 117 hectares rolling land dev’t. Complete with amenities, asphalted and concrete roads,bridges,underground water system with elevated steel water tanks, electrical distribution system and drainage system, Slope protection system, Mini Dams to collect water for agricultural purposes..
• Batulao Woodland Mountain Resort – a 1,080 has. development at Nasugbu Batangas. Masterplan was completed and access road construction .
9. ASIAN CONSTRUCTION AND DEVELOPMENT CORP. [at] 2ND flr. Union Ajinomoto Bldg. Sen. Gil Puyat Ave. Makati City. (ASIAKONSTRUCT) ("AAA" Construction )
Responsibilities as OPERATIONS PROJECT MANAGER from Oct12,1997 toDec.99
Theme Parks and Mixed-Used Developments
• Directs orders to more than 30 Engineers, Supervisors and more than 3,000 workers.
• Coordinates and oversees the different trade Contractors for Land development, Bridges,Electrical works, Electromechanical works, Sanitary / Plumbing works, Drainage, Sewerage system, Concrete and Masonry works, CCTV & Sound Systems, Steel Fabricators/ Erectors and other Finishing works. Slope protection systems, Lagoons and Earth Dams.
• Attends weekly coordination meeting with the Project Management ( AP Canlas & Asso.) EPC ( Expo Pilipino Corp.) FCCC ( First Centennial Clark Corp.) NCC ( National Centennial Commission) and other related Bureau.
• Checks and approves construction methodology.
• Plans construction requirements and schedule.
• Evaluates and recommends payment for the contractors.
• Presides coordination meeting with staffs and managers.
• Sets and presides meetings with Foreign Sub-Contractors.
• In charge of the whole Project Operations.
PROJECT COMPLETED : THEME PARK PROJECT
• Php 1.2 Billion Philippine Centennial Exposition ‘98
Theme Park Project
Clark Special Economic Zone (CSEZ)
Clarkfield Pampanga
PROJECT STARTED :
• Mauban Quezon Power Plant – Foreign funded project to generate electricity.
10. CTM CONSTRUCTION AND GENERAL SERVICES [at] 14 President Osmena St. Sucat Paranaque City.
Responsibilities as OPERATIONS MANAGER & PLANNING MANAGER from Feb.21,1996 to Oct. 15,1997
• In-charge of the project planning before implementation.
• Manage other properties while other properties are under development.
• Negotiates with the project proponents and owners for possible project.
• Coordinates with DENR, Local Gov’t. HULRB.
• Plans construction requirements, and cost effective measures.
• Handles 5 Civil Engrs. 3 Mechanical Engrs. 1 Electrical Engr. And 5 Supervisors.
• Prepares construction estimates for bidding.
• Presides meeting with all the staffs and Engineers.
• Visits the site and classify the construction schedule.
• Checks and approves the contractors progress payments.
• Reports directly to the President.
LISTS OF PROJECTS COMPLETED:
• 102 – Unit Middle End Makiling Hills Subd. At Makiling Los Banos Laguna.
• LPHI High-End Townhouse at Sta. Rosa Laguna
• Ayala Alabang / Putatan Water Reservoir & Water Supply
• 12- storey Commercial bldg. at Taft Ave.
• San Isidro Batangas 301 townhouses including site development and landscaping.
• Ayala Southvale Electrical powerlines construction.
• Ayala land marketing suite at Tower One, Ayala Triangle
• Rehabilitation of Ayala Museum
• RFM Bldg. Rehabilitation
• MWSS Bldg. Rehabilitation
• Ayala Alabang Maintenance services
11 . INTERHOUSE CORP. [at] Km. 24 East Service Road, Cupang Muntinlupa .MM.
Responsibilities as RESIDENT ENGINEER & BLDG. ADMINISTRATOR
From May 18, 1994 to Feb. 15, 1996
• In- charge of the whole project.
• Evaluates and recommends Value-Engineering for cost saving measures.
• Handles 14 Contactors in different field of works.
• Reports directly to the President with regards to the problems and recommendations.
• Classifies flow of materials against specs. and plans.
• Recommends approval of Contractors billings.
• Checks construction schedule.
• Assists the tenants problem with regards to utilities problems.
• Maintain the Bldg. and its utilities in good running condition.
• Supervises tenants units for development.
• Approves tenants request for unit-development.
• Computes tenants monthly dues and billings.
PROJECTS COMPLETED:
• Alabang Business Tower – 14 - Storey Commercial & Office Bldg. at Madrigal 1
• South Center Tower – 14- Storey Office Bldg. at Madrigal Business Park 2
12. DCCD ENGINEERING CORP. [at] Sol Bldg. Amorsolo St. Makati City, M.M.
( Top Consulting firm in the Philippines)
Responsibilities as SR. STRUCTURAL INSPECTOR & QUANTITY-COST ENGR.
From Jan. 16, 1993 to April 10, 1994
• Checks the construction methodology of the Contractor against plans and specifications.
• Checks the lay-out and elevation of the proposed structure before the works commences.
• Supervises the on-going river dredging works .
• Inspects rebar works and formworks if the plans are properly being followed.
• Checks concrete design mixture, slump test and trial mixture before work commences.
• Recommends remedies for some problems encountered during operations.
• Approves and rejects the quality works implemented by the contractor.
• Evaluates and recommends monthly accomplishment billings submitted by the contractor.
• Computes the submitted variation and change orders.
LISTS OF PROJECTS COMPLETED :
• 575 units low cost housing for Castillejos Zambales Area Project.
• 1,000 sq.m. 2- Storey School Bldg.
• 900 sq. m. Steel-Built Multi-Purpose Gymnasium
• 2- Unit 130,000 gal. Elevated Concrete Water Tank
• Grouted rip rapped Slope Protection System.
• Concrete lined ditch drainage system
• 40 meter Concrete Bridges and Steel Bridges
• Box- Culvert Structures
• 20 KM. 8-meter Wide Asphalt and Concrete Road Networks
13. DCCD ENGINEERING CORP. [at] Sol Bldg. Amorsolo St. Makati City, M.M.
Responsibilities as PLANNING ENGR., CONSTRUCTION INSPECTOR & COST ENGR. From Feb. 25, 1992 to Jan. 16, 1993
• Attends pre-construction meetings.
• Plans construction requirements and equipments.
• Plans construction schedule and project cost.
• Checks construction activities against plan and specifications.
• Inspects rebar works and formworks before concreting commences.
• Checks structural installation and welds against plans and specs.
• Monitors the completion of punch lists items before complete turn-over of the project.
• Estimates construction variation orders and accomplishments.
• Recommends payments for the contractors
LISTS OF PROJECTS COMPLETED:
• 400 units low cost housing for Botolan Zambales Area Project.
• 15 Km. PCCP Road Network and underground utilities.
• 2-unit 1,200 sq.m. Factory Bldg.
• 1,800 sq. m. Administration Bldg.
• 10-Bed Hospital and Day care Center
• 3-Unit 100,000 Gal. Elevated Steel Water Tanks
14. DEE CONSTRUCTION CORP. [at] Tondo Manila
Responsibilities as PROJECT ENGR. & COST ENGR. From Feb. 25,1987 to March 30, 1991
• Estimates the proposed projects.
• Directs 4 foremen and 300 workforce at the site.
• Ensures quality of works by the Sub-Contractors.
• Inspects the working areas.
• Reconciles with the inspectors at the site.
• Processes the progress billing of the sub-contractors.
• Presides weekly job site meetings.
LIST OF PROJECTS COMPLETED:
• Wellington Bldg.- 12 – Storey Residential & Commercial Bldg. at El Cano St.Binondo Manila
• Mariposa Townhouse – 42-Unit High-End Townhouse project at Mariposa St. Cubao Q.C.
• Sulu Dobbs Project – 1,000 sq.m. catering area used to cater food for plane passengers.
15. SCHEMA KONSULT, INC. [at] Meralco Ave. Pasig City
Responsibilities as PROJECT INSPECTOR from Nov. 16, 1984 to Jan. 7, 1987
• Inspects the construction activities if the plans and specifications are being followed.
• Approves and rejects construction quality out-put.
• Checks rebar schedule before concreting works commences.
• Estimates contractors variation orders.
LIST OF PROJECT COMPLETED :
• Insular life Bldg. at San Pablo City Laguna
16. J.M.L. MANUFACTURING CORP. [at] Bo. Mabiga , Caloocan City
Responsibilities as PRODUCTION SUPERVISOR from Feb. 10 ,1982 to Oct. 25,1984
• Evaluates Production requirements against purchase orders.
• Repairs the Machine whenever there are breakdown.
• Supervises 80 production staffs.
• Directs the shipments of the products.
• Accomplishes daily production reports.
TRAININGS AND SEMINARS ATTENDED :
● LEADERSHIP / MANAGEMENT
Dale Carnegie at Robinsons Suite Tower
• WORLDBEX SEMINAR
World Exposition regarding new technology in Urban Engineering and Vertical Landscaping. Held at New World Hotel .
• LEADERSHIP SEMINAR
Guthris Jensen,
• MITIGATING THE EFFECTS OF NATURAL DISASTERS
Association of Structural Engineers of the Phils. ( ASEP )
Held at Century Park Sheraton Hotel, Manila,
• PERT/CPM CONSTRUCTION PROJECT MANAGEMENT
Held at UPRC Manila,
• EFFECTIVE PRODUCTION SUPERVISOR
Manila Resource Center,
REFERRENCES:
1. ENGR. DANNY CARMELINA
President
DCMS CONSTRUCTION INC.
2. ENGR. DIEGO V. ARCENAS
SR. Project Manager
Asian Construction and Devt. Corp.
3. PROF. LEO D. ORTIZ
Managing Director
LDO Resources Devt. Center
4. ATTY. FRANCISCO SEVILLA
Corp. Director and Legal Counsel
5. PROF. LEONARDO T. CRUZ
Dean CBA
Rizal Technological University
6. MR. BERTRAND BLAZY
General Manager OTIS E&M Philippines INC.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.