SUMMARY: I & E Engineer with more than (25) years of experience in design, Estimating, Control wiring Cathodic Protection, Supervision, Commissioning, construction and maintenance of various projects in he US and overseas. With proven abilities and technical experience. Assignment have included positions from Field Engineering to Project Manager.Industreies served include the following petrochemical, refineries. Structures served Oil rig on shore and offshore jack up, semi submersible and floating (oil and gas), water treatment plants, oil rigs off shore and on shore, off shore loading platforms Oil and gas, Gas plants load and unloading (LNG), sewage treatment plants, Power plants (nuclear, oil and cold fired) Sub-Stations, shipyard, hospitals, and shopping centers. I write commissioning specification in accordance with the NETA
Computer skills Includes AutoCAD, Word 2000, Excel 2000, Access 2000
International Experience: U.S Virgin Island Saudi Arabia Thailand Singapore Indonesia Philippines Malaysia África México Dominican Republica Venezuela Iraq Kuwait France Abu Dhabi UAE Afganistán Doha Qatar
EDUCATION: University Of Kansas: B.S, Electrical Engineering
PROFESSIONAL EXPERIENCE:
August 2008 To March 2009 CH2MHILL International Contractors Inc.
Electrical Project Engineer/Commissioning Manager /Consultant Al Udeid Air Base Doha Qatar
As Electrical / Instrumentation Commissioning Specialist I am responsible for the day-to-day inspection and commissioning of all electrical and Instrumentation installation work at Al Udeid Air Base Doha Qatar Responsible to the Project manager for the following: To insure all work complied with drawing and specification. Assure that all QA/QC requirements for commissioning documentation are a system. For the Commissioning off four (4)15Mv Turbomack Gas Turbines Generators Switch yard building/(4) Transformers(all Switch gear 11KV and 4160V All BOP Equipment, (415) switch gear DC control power and UPS.
January 2008 To July 2008 Strategic Contract Resources
Commissioning Manager Dominion Cove Point LNG Plant
Lusby Maryland Md.
Commissioning Manager
As Electrical / Instrumentation Commissioning Specialist I am responsible for the day-to-day inspection and commissioning of all electrical and Instrumentation installation work at Cove Point LNG, Plant Lusby Maryland. Responsible to the Project manager for the following: To insure all work complied with drawing and specification. Assure that all QA/QC requirements for commissioning documentation are a system. For the Commissioning of a 13.8KV Substation (all Switch gear)) (2)NP MS 5001P GE gas turbines. All BOP Equipment, (4160V) and (480) switch gear DC control power and UPS.
May 2007 to November 2007 RMS / Readiness Management Support LLC
Lead Electrical Engineer Al Dhafrs Air Base Abu Dhabi UAE
Bagram Air force Base Afghanistan
Lead Electrical Engineer Responsible to the PCO) Project Controls Officer) DOD far all Electrical work’s Design Construction and Estimating. All work is classified, as so, can’t deliberate more .
January 2007 to April 2007 GE power Plant System Department
Lead Electrical Commissioning Engineer Spindle Hill Energy/Kuwait
As Lead Electrical Commissioning Engineer I was responsible to the Commissioning manager for the Commissioning of a 230kV Substation (all equipment their in) three (3) Siemen GFI Breakers (4) Switches, RTU, CTs and CVTs. All BOP Equipment and (2).Two GT transformers and (1) SST for two Frames 7 Gas Turbines Simple Cycle.
(4160V) and (480) switch gear DC control power and UPS.
September 2006 to December 30 2006 Exxon Mobil Development
Electrical Engineer/Commissioning Engineer Yoyo Project Victoria Island Lagos Nigeria
As Electrical Engineer/Commissioning Engineer I was responsible to the project manager for the upgrade of all Electrical and Instrumentation work on three (3) solar generators (4160V) on a production platform and the removal and replacement of a 933Catapillar emergency generator work was completed on time and with in budget.
April 2006 to August 15 2006 End of Contract United Services – O&M
Transmission and Distribution Coordinator Iraq Re-construction
Baghdad Iraq
As Transmission and Distribution Coordinator responsible to the (PCO) Project control officer Army Corps of Engineers, for the day to day Operations, Maintenance and Repair of a 132Kv substation on the Baghdad Ring. Assist in the development and implementation of a computerize operation and maintenance program and reports for plant equipment. Power plant outage planning and execution. All so Assisted in the development of a training center so that an effective O&M program was established.
October 2004 to February 2006 (E O C) Universal Project Management
Commissioning Manager (Substations) Iraq Re-construction Baghdad Iraq
As Commissioning Manager I was responsible for all aspect of commissioning and start-up for a 132Kv and a 400Kv substation. Attended training for GIS breakers and switchgear at VA TECH Transmission and Distribution Grenoble France. Training included Leak check linkage adjustment, calibration of instruments. Responsible for the day-to-day commissioning of all equipment in the Al Almeel Substation (132Kv) and Al Rashid Substation (400Kv) Republic of Iraq I was reasonable for the following: To insure that all Equipment complied with drawing, specification, standards, provisions and worked as designed.
Assure that all QA/QC requirements for commissioning documentation are achieved for the following GSI Switches and breakers updated and calibrated all ALSTOM relays. For Accepted by the USACE. Commissioning was completed on time and with in budget
University Project Management Inc Assignment in Al-Khobar Saudi Arabia as Technical advisor To National Contracting Company LTD.I Assisted in preparation of Technical Proposal requirements for (2) substations (1-400Kv located Mustapha and (1 60Kv located in Bir-Ghbalou Algiers. Responsible to the project manager for the following, specification of electrical equipment for two Substations, Equipment consisted of the following CTs, PTs CCVTs, Breakers and Switches. A SCADA System. Electrical equipment and commissioning specifications. Proposal was completed on time and with in budget
November 2003 to March 2004 Washington Group International
Site Representative (Bayji Power Station) Iraq Re-construction Alexandria La
As Site Representative I was responsible for the day-to-day erection and inspection of (4) 145 KV Substation Alexandria La. For the Bayji Power Station Iraq Washington Group International. I was reasonable for the following: To insure all work complied with drawing, specification and worked as designed. Substation was completed, all switch and breaker tested. All Substation were color-coded disassemble pack and shipped to Houston Texas Air France for shipment to Iraq
Representative I was responsible for the day-to-day erection of sub station steel and inspection of a 345 Kv Substation at Younker NY, Dunwoody S/S 345 Kv Series Reactors and a SCADA System I was Responsible to the Project Manager for the following: To insure all work complied with drawing and specification. Power Generation and a SCADA system Substation was completed on time and with in budget.
April 2003 to July 2003 Strategic Contract Resources
Commissioning Specialist Cove Point LNG Plant
Lusby Maryland Md.
As Electrical / Instrumentation Commissioning Specialist I am responsible for the day-to-day inspection and commissioning of all electrical and Instrumentation installation work at Cove Point LNG, Plant Lusby Maryland. Responsible to the manager for the following: To insure all work complied with drawing and specification. Assure that all QA/QC requirements for commissioning documentation are achieved for the following equipment. Three Frame three generators (3) Emergency Generators (1500 KV) and a SCADA system.
July 2002 To January 2003 PCI International Inc.
Electrical / Instrumentation Supervisor Puerto Plata Power Plant
Puerto Plata Dominican Republic
As Electrical / Instrumentation supervisor I was responsible for the day-to-day construction and commissioning of SD Boiler Plant (84 KW). I was responsible to the project manager for the following: To insure all work complied with drawing and specification. Electrical (Power Generation) and instrumentation installation testing and commissioning of all Electrical equipment and a SCADA system Job was completed on time and with in Budget. Also, responsible for training a team of third country national for operation and maintenance personnel. (182.5 DAYS)
February 2002 To May 2002 Bata Engineer Corp.
Electrical Supervisor Califonia Edison Sub-Station Up Grade
Palmdale CA
As electrical supervisor I was responsible for estimating and the day-to-day construction, modification of a 500 Kv substation. I was responsible to project manager for the following: To insure all work complied with drawing and specification: Civil work: materials: erection of substation steel: installing capacitors: Power Generation on Bus supports: breakers: CT: PT and switches: SCADA and technical support for all the above. Job was for (4) Months, Completed on time and with in budget. (120 DAYS)
January 2000 To March 2002 PIC International Inc.
Electrical Supervisor Tux pan (2) and Altamira-1 (2) Two Power Plants
Tuxpan and Alta Mira Mexico
As Electrical Supervisor I was responsible for estimating and for the day-to-day construction of two 400KV Electrical Sub-Stations being built by Mitsubishi Heavy Industries. I was Responsible to the Project Managers for the following: To insure all work complied with drawing and specification: Material for the steel structures. Installation of Power Generation, CT, PT, switches, breakers, SCADA system and technical support for all the above. Both Projects was finish on time and within budget.
Cadereyata Project:
Responsible to the central zone Manager for the Following: To insure all work complied with drawing and specification: Estimating and the day-to-day installation of all Electrical and Instrumentation during construction of a pump station Cadereyata Pipeline. Including Power Generation, (3) Pumps 4160 volts, All MOV’s (4) Transformers, Control wiring for MCC and PLC All Instruments and pig launcher (2) 24”and a SCADA system.
October 1998 To November 1999 Alliances Engineering
Instrumentation/Electrical Specialist Exxon platform Up-Grade
Electrical design Engineer: A member of the Alliance design team, work on (2) gas plants and an off shore platform. (Jack up) Up-graded the lighting system and the power Generation distribution systems high and low voltage. Up graded (UPS DCS) and SCADA system).
March 1996 To August 1998 Ipco Nigeria Ltd
Senior Electrical/Instrumentation Engineer NNPC off Shore Loading Platform
I was a member of Ipco Nigeria Ltd.Project Management team working at Sambawang Shipyard along with Sambawang Engineering (Singapore and Africa) I was responsible to the Project Manger for all Electrical (Power Generation) and Instrumentation during construction of a off shore loading Platform. Oil and (L&P) Gas. I was all so part of the commissioning team in Nigeria.
September 1994 To April 1996 Pacific Equipment and Leasing Pte.Ltd.
Pipeline Commissioning Engineer Shell Oil
Responsible for the day to day operation of commissioning of a 300 Km to the project manager
Generated and maintained Instrumentation and computer programs pertaining to the testing, cleaning and drying of pipelines (8” and 24”) 300 Km .Oil and Gas loading and unloading (LNG gas) Pumping station and gas compressor Stations. Projects were completed on time and in budget.
July 1993 To August 1994 R.J. Brown and Associates (Far East) Pte. Ltd.
Senior Electrical/Instrumentation Engineer The Gleam Gas Gathering Station
Electrical and Instrumentation Design Engineer for the Gleam Gas Gathering Station. This included the following Control Room, Sub-station, MCC’s, 2000 KVA power plant (2) 500 KVA
Emergency generators, lighting system, power distribution and a SCADA system.
August 1992 To May1993 Malaysia Shipyard and Engineering Sdn.Bhd.
Maintenance Manger /Senior Project Manager
Developed and computerized a maintenance program for all equipment in the shipyard. Setup a technical library for all equipment and documents.maintened a centralized director of the shipyard. Updated all shipyard drawing using AutoCAD. As Project Manager, Verified all work complied with drawing and specification’s performed start-up for an offshore platform (Jack up)(ESSO) project. This project included all electrical switchgear, instrumentation, controls (DCS)systems. Fire and gas
Detection
May 1990 To 1992 July R.J. Brown and Associates (Far East Pte.Ltd.
Electrical Design Engineer East Java Pipe Line
Electrical and Instrumentation design Engineer for the East Java Pipeline. The design following all
Electrical, instrumentation and controls for (4) metering and pump stations. Specified and Installed all switchgear High and Low voltage, lighting and power distribution. Emergency generators. (SCADA system) and a telecommunication network 360 Kms.
October 1989 To March April 1990
Senior Electrical Engineer P.T Tekniskil Pte Ltd.
Supervised (35) technicians involved in the change out of (2) (72) MVA transformers, switchgear, control wiring and associated power cable (P.T. Inco Nickel process plant).
Expansion Phase one.
Supervised (50) technicians for the installation of new transformers switchgear control wiring and associated power cable. Calibration of new instruments per testing of all motors high and low voltage. Commissioning and start-up of the plant phase (2)
July 1987 To 1989 August
Electrical / Maintenance Engineer Computer Aid System and Software Pte Ltd.
Developed and implanted computer computerized programs for the follow: hospitals offices buildings, Oilrigs (drilling and production) power stations, emergency power plants, water treatment plants, sewage treatment plants. And shipyards
My references are as followed:
Judee Flynn
Strategic Contract Resources
Vice President of Operation
Phone 678 784 6118
jflynn[at]scrllc.net
Don Bengtson
Strategic Contract Resources
Phone 404 307 7368
dbengts[at]bellsouth.net
Rod Patch
Construction Manager
Mustang Engineegers
Phone 281 610 7560
RPatch8076[at]aol.com
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.