Career Summary
I am skilled engineer, designer and construction professional with strong communications, technical and problem solving skills. I have over 20 years of experience working as an Electrical Engineer in public sector. I have used various design/software programs used in engineering.
Experience includes
CAD Drafting & Design Design Engineer Design Standards
Cost Estimation Field survey of Project Review Design Drawings
Examples of Accomplishments
· Kept project cost within budget
· Design package submitted to client on time.
· Construction and material specifications followed thoroughly to improve
quality.
· Electrical codes for lighting project followed
· Various design calculations, proficient in Word and Excel
· Excellent team member
Education & Registration
· EIT Engineering in Training certification from State of Wisconsin
· B.S. Electrical Engineering. M.S. University of Baroda, India
Work Experience
Electrical Engineer, SINGH & ASSOCIATES, Inc. Feb. 2009 – March 2010
· Chicago Department of Transportation – Wacker/Congress Interchange Reconstruction Project. I was responsible for traffic signal designs for 4 intersections, scope of work included construction & material specifications, and summary of quantities.
Lake Street Improvement From Damen Ave. to Ashland Ave.
I was responsible for traffic signal designs for 3 intersections and street lighting design, voltage drop calculations, construction & material specifications, and summary of quantities.
· Illinois Department of Transportation – Review contractor’s submitted shop drawings for lighting projects to follow IDOT design standards for construction and material specifications for various districts.
Design street lighting project for various districts following IDOT design Guideline, RP-8-Roadway Lighting, voltage drop calculations, DG-5-Recommended Lighting for Walkways and Class 1 Bikeways and AGI software.
Electrical Engineer, SPAAN TECH Inc. April 2006 – November 2008
· Illinois Toll and Highway Authority – Design, review, and update of two traffic intersections, including signals in connection with the reconstruction of Illinois Route 7 over Interstate I-355 in Will County, Illinois.
· Chicago Department of Transportation – IDOT 2005 &-2006 Traffic Signal Modernization Program - I was responsible for traffic signal designs for 20 intersections all over city of Chicago, scope of work included construction & material specifications, summary of quantities, and dispositions of comments.
· I was also responsible for street light and traffic signal modernization program for Chicago Avenue from Latrobe Ave to Grand Ave, which involved 9 traffic signal systems, fire alarm cable and police cameras.
· Illinois Department of Transportation - IL Rte. 68 Over U.S. Rte. 14 – Diamond Interchange Ramps (Traffic Signals): scope of work consists of designing and preparing final construction documents and estimates for temporary and permanent traffic signals for two intersections and interconnect plans for IL Rte 68 at US 14; Interconnect system for IL Rte 68. The work also included pre and post design field checks; coordination of meetings with Prime contractor, Power Company and Local village for Emergency Pre-emption; load and voltage drop calculations. Also responsible for construction & material specifications, summary of quantities, dispositions of comments.
Construction Inspector BOLLINGER, LACH &ASSO. OAK BROOK, IL
July 2005 to Nov 2005
· Illinois Toll and Highway Authority: I-88 resurfacing and reconstruction project from De Kalb to Dixon Illinois, project work involved inspecting contractor’s construction according to The Illinois State Toll Highway Authority (ISTHA) standards, reporting daily activities of construction progress such as Rubblization, PCC Pavement Type A & B, Bituminous Pavement Overlay Removal, and Aggregate Shoulder Special. Review construction drawings and coordinate contractor’s work with supervisor on a daily basis.
Electrical Design Engineer KAM ENGINEERING, Inc., Elgin, IL
July 2004 to May 2005
· Illinois Department of Transportation: Drafting permanent and Temporary Traffic Signals according to IDOT requirements. Drew up permanent and temporary interconnect plans using a Micro Station CADD system. Provided field checks to verify existing and proposed traffic signal equipment locations. Projects include: Fiber Optic Communications Network from Algonquin Road to Prospect Ave; University Park Project at University Parkway and IL Rte 22 from Hewitt Dr. to Lakeside Dr.
· Also assisted in construction field inspection that included traffic signals, roadway rehabilitation, roadway lighting, and construction stacking and pavement marking.
Electrical Engineer III
CITY OF CHICAGO, BUREAU OF ELECTRICITY, Chicago, IL
August 1987 to Feb 2004
· Chicago Department of Transportation: Design and drafting permanent Traffic Signals according to CDOT standards, specifications and estimates. Provided design and draft of Fire Alarm System Street Lighting and estimation according to CDOT standards. Paradox program for estimation of traffic signal costs, roadway lighting program to estimate illumination. Key projects include:
· Lake Street Improvement
· Kennedy Expressway Alternate Routing
· 59th Street from I-94 to Midway Airport
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.