Bill Eichinger
536 S. Ridge Dr.
Olathe, KS 66061
Cell: (913)-748-7716
Email: snowsing2000[at]yahoo.com
SUMMARY:
Further my experience and diversity working with Mobile Crane operations. My experience includes six months in Antarctica on the only Sea Ice Runway in the World, over one-and-a-half years on Wind Farm projects, six months on the Light Rail DART project, and two years within a Waste Management Project in Dallas, TX. I have also been a member for eleven years with the Operating Engineers Local 101 of Kansas City, MO.
EXPERIENCE:
2009 - Mobile Crane operator
• C P Buckner – Crystal Lake, IA.
Heavy lift operator on LIEBHERR LR 1400/2 161' Main with 161' Heavy Luffer and LIEBHERR LR 1400/2 258' Main with 58' F1 Jib.
Installed G.E. Wind Turbine components for Top out.
Operated LIEBHERR 1200 SX 212' Main Boom for Installing DTA's and Base-Mid tower sections.
• C P Buckner – Riceville, IA.
Heavy lift Operator on LIEBHERR LR 1400/2 161' Main with 161' Heavy Luffer.
Operated LIEBHERR LR 1400/2 278' Main with 28" Wind Tip.
Operated LIEBHERR LR 1400/1 185’ Main with 138' Light Luffer Replacing Vestas gearboxes.
• Bay Ltd – Texas City, TX.
Operated TEREX 80 ton R/T at Valero Refinery.
Offloading and loading Heat Exchangers on the wash rack.
TWIC card for refinery work.
2008 - Mobile Crane operator
• C P Buckner - Riceville, IA., Story City, IA., and Ashtabula, ND
Heavy lift operator on a LIEBHERR LR 1400/2 161' Main with 161' Heavy Luffer.
Operated a LIEBHERR LR 1400/2 278' Main with28' Wind Tip.
Installed Vestas Wind Turbine components in Riceville, IA.
Operated LIEBHERR LR 1400/2 258' Main with 58' F1 Jib installing G.E. Wind Turbine Component's in Story City, IA.
Operated LIEBHERR LR 1400/2 258' Main with F1 Jib installing G.E. Wind Turbine components.
Operated LIEBHERR LR 1400/1 185' Main with 138' Light Luffer at Ashtabula, ND.
• Wanzek Construction Inc. – Harris, IA.
Operated TEREX 120 ton R/T making Dual lifts Offloading CLIPPER Wind Turbine components.
2007 - Mobile Crane operator
• Archer Western-Herzog – Dallas, TX.
Operated Gove 50 ton R/T and LINKBELT 65 ton R/T.
Lifting concrete forms and rebar for Shear Keys and Diaphragm's pouring concrete.
• D H Blattner and Sons, Peetz, Co. – Langdon, ND.
Operated LINKBELT 75 ton R/T, Grove 75 ton R/T, Grove 90 ton R/T, Grove 130 ton R/T, and TEREX 80 ton R/T.
Worked on Offloading G.E. Wind Turbine Component's and setup DTA's.
Worked Top out and Base-Mid Installation's of Wind turbine Component's.
• Aerotek, Peetz, Co.
Operated LINKBELT 75 ton R/T, Grove 75 ton R/T, Grove 90 ton R/T, Grove 130 ton R/T, and TEREX 80 ton R/T.
Worked on Offloading G.E. Wind Turbine components, and Installing DTA's.
Worked top out and Base-Mid Tower section's installations.
2006 - Mobile Crane operator
• Raytheon Polar services – McMurdo, Antarctica
Built a Runway on Sea Ice.
Operated Cat 950 with snow blower, Cat 966 with 6- way blade, D6D, D7N, and D8R on runway.
Operated D9N and Cat 980- loader for maintenance of various projects for National Science Foundation research projects.
Certified Crane Inspection and Certified CCO on Grove 75 ton R/T, Mantis 40 ton Crawler Hydro, and P[at]H Truck Crane 70 ton for ship offloading of cargo.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.