2007-2009 Richland Construction Company - Superintendent
20,000 sq. ft. office building-two story tiltwall
4,000 sq. ft. shopping center-block building
64,000 sq. ft. shopping center-tiltwall-two story
2006-2007 J.O.A. Construction Company - Superintendent
13,000 sq. ft. fleet maintenance building
2004-2006 U.A.T. Construction Company - Superintendent
60,000 sq. ft. shopping center
remodel doctor offices-4 buildings with Steel canopy, all new windows
2001-2004 Rich-tex Construction - Superintendent
Added 2nd level to 12,000 sq. ft. bldg.-build out - Houston
15,000 sq. ft. metal bldg. Frame and build out - Tomball
20,000 sq. ft. metal bldg. Frame and build out – Bear Creek
25,000 sq. ft. block bldg. Frame and build out – Houston
1999-2001 UBA Inc. - Superintendent
114 room hotel. Four floors and wood framing-Downtown Houston
Carwash and Lube-Hwy 6 in Bear Creek
1996-1999 Rich-tex Construction - Superintendent
16,000 sq. ft. metal bldg. for Interstate Southwest Forge Company
Guard Tower, Federal Prison (maximum security)-Beaumont
20,000 sq. ft. build out for lease space for Sun and Ski-Webster
900 sq. ft. build out for Dental Office-Spring Branch
20,000 sq. ft. metal bldg. Warehouses-Spring
1995-1996 Lynn B. Watkins Construction - Superintendent
Built three buildings for Noltex/Dupont :
2,400 sq. ft. office building with metal studs, brick, stucco, metal roof & parking lot-La Porte
9,600 sq. ft. stran open building with trench drains, pad with anchor bolts for metal tanks and second story steel floor-LaPorte
1,600 sq. ft. storage building with concrete block, footings, anchor bolts and multiple concrete pads-LaPorte
1992-1995 Rich-tex Construction - Superintendent
One Bases Hamburger Store
Remodeled strip shopping center with 15 lease spaces (store fronts and interiors) 20,000 sq. ft. addition to Schultz Mobile Home-Navasota
Shell gas station & restaurant-Navasota
800 sq. ft. Dental Office built out-Houston
1991-1992 Tony Crawford Construction - Superintendent
27,353 sq. ft. Cornerstone Post office
113,000 sq. ft. $2.5 million concrete??
GEORGE J. ACHTER
1989-1991 Rich-tex Construction - Superintendent
Built two Bases Hamburger Stores, two Graffitis hamburger stores
Total renovation of 141 unit condo
Built Chevron gas station
1987-1989 Mis of Houston-Halterman Labs - Superintendent
3,000 sq. ft. addition on existing metal building. New laboratories included underground utilities, slab, metal building, interior finish, laboratory furniture, fume hoods, sinks, drains, tops and cabinets-Channelview
1986-1987 Mendez & Donnel & Associates - Inspector
George R. Brown Convention Center, $104.9 million project. Performed architectural and structural inspections including roofing, siding, tiling, carpet, painting, sheetrock, mechanical hardware, vinyl, concrete and sub-grade-Houston
1985-1986 Target Construction Company - Superintendent
Gulf gas station, convenience store & carwash. Supervised layout, grading, underground concrete work, structural, electrical, gas tanks, pump installation and interior-Pearland
Remodeled doctor’s office. Gut building, layout and framed building, plumbing, electrical, re-roofing, painting, finished interior and exterior-Houston
1983-1985 Sheldon L. Pollack Corporation - Superintendent
120,000 sq. ft., $1 million Strip shopping center with tilt wall construction Supervised layout, grading, underground concrete work, structural steel, roof decking, hot roof, aluminum store fronts, metal partitions and interior leased spaces-Dallas
1980-1983 Rich-tex Construction - Superintendent
Country Club- built club house, pro-shop and docking area
Strip shopping centers-Northwest Houston, Jones Road
14,000 sq. ft. building (12 lease spaces)-Huffmeister
10,000 and 20,000 sq. ft. metal buildings for warehouseing.
Three 7-11 stores including install of gas pumps and tanks-North Houston
Fifty apartments with wood frame, siding and metal carports-South Houston
Remodeled 8 Hartz Chicken stores with new equipment, floors, ceilings, paneling and plumbing-Houston
Arco-Channelview
Telecommunications Conference Center- Hi-tech electronics
12,000 sq. ft. Church classroom addition-Gessner
1977-1980 Rogers 7 O’Brien Construction Company - Superintendent
Erected a 100,000 sq. ft. metal warehouse for Frito Lay. Supervised and performed layout of metal building-Rosenberg
1975-1977 T.O.S. Incorporated - Superintendent
Clear Lake Intermediate School, $2 million. Coordinated subcontractors, 70 man construction crew, layout, school grates, daily reports, time keeping, material ordering and receipts-
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.