Summary Statement: I thrive in chaotic environments. I deliver practical solutions when faced with complex obstacles and can enhance any required stringent procedure into an effortless routine.
Summarized Work Experience: (detailed on page 2)
• Jacobs Engineering Inc. Construction Planner 02-09 thru Present
• Songer Steel Services Inc Construction Planner 12-07 thru 10-08
• Siemens Scheduler 02-07 thru 12-07
• Sauer Inc. Construction Planner 12-06 thru 12-07
• Chapman Construction Planner 12-05 thru 12-06
• Aker Kvaerner Scheduling Supervisor 11-02 thru 12-05
• Dick Corporation Scheduling Manager 03-99 thru 11-02
• Union, Switch & Signal Planner/Scheduler 06-98 thru 02-99
• Foster Wheeler Zack Project Controls Manager 02-94 thru 06-98
• Tetra Technologies Planning Engineer 03-92 thru 02-94
• Centerline Engineering Construction Coordinator 06-89 thru 05-91
• Sargent Electric Area Superintendant 07-81 thru 01-89
Education:
• Electronics Institute - AS In Electrical Technology - Graduated 1980
• Midland, Lincoln High School – General Diploma – Graduated 1978
Skills:
• Comprehensive blueprint reading in all disciplines
• User of Microsoft Suite of software: Word, Excel, Access, PowerPoint, Outlook
• Expert in Primavera Suite of software: P3, P5, P6
• Experienced with practical construction methods in the Power & Industrial Sector
• Excellent Oral & Written Communications
• Flexible, Self Motivated and Detail-Oriented
Training & Certificates:
• Primavera P6 Certified – 2007
• OSHA 10 Hour Trained & 40 Hour Trained – 2007
• Beaver County Vocational Technical School - Advanced Welding Certificate - 2005
• Federal Security Clearance 2002
• Jacobs Engineering Inc. Construction Planner
o 02-09 thru Present North Shore Connector Project, Pittsburgh, Pa
 Master program scheduler for the construction manager
 Light rail & tunnel construction methods
• Songer Steel Services Construction Planner
o 12-07 thru 10-08 Industrial Construction. $350M Blast Furnace Rebuild.
 Supported web based data collection in turn to support the schedule.
 Created database to track project document control
• Siemens Scheduler
o 02-07 thru 12-07 FGD, Scrubber, ESP and Fabric Filters $90M-$620M.
 Created matrix reports & linked corporate data with project data
• Sauer Inc. Construction Planner
o 12-06 thru 12-07 Wet FGD Dayton Power & Light – $95M-$185M.
 Initialized Earned Value reports and maintained actual values.
 Created and maintained spool tracking list and installation progress.
• Chapman Construction Planner
o 12-05 thru 12-06 Arcel 30mm Production Upgrade– Nova Chemical $43M.
 Designed and maintained Earned Value Matrix.
 Directed the receipt of material & checked pipe spool fabrication for errors.
 Organized and controlled lay down yard. 2200 spool pieces were received, organized, tracked and staged for construction.
• Aker Kvaerner Scheduling Supervisor
o 11-02 thru 12-05 General Contractor Power Industrial, $15M-$750M.
 Managed 6 to 12 employees
 Created corporate standard work practices and procedures.
 Developed and held training classes for scheduling efforts corporate wide.
• Dick Corporation Power & Industrial Scheduling Manager
o 03-99 thru 11-02 General Contractor Power Sector $30M-850M.
 Managed 3 to 8 employees.
 Analyzed work scope documents and project specific reporting requirements
• Union, Switch & Signal Planner/Scheduler
o 06-98 thru 02-99 Transportation Industry $15M-$75M.
• Foster Wheeler Zack Project Controls Manager
o 02-94 thru 06-98 Boiler Repair Contractor $3M-$30M.
 Managed 2 to 3 employees. Assisted Superintendant coordination efforts in engineering, materials procurement and payroll processes.
 Created database application to signup union workers, automatically fill out electronic W-4’s for payroll, calculate and support payroll.
• Tetra Technologies Planning Engineer
o 03-92 thru 02-94 Waste Water Treatment & Filtration Industry $5M-35M.
• Centerline Engineering Construction Coordinator
o 06-89 thru 05-91 Weirton Steel Corp/Hot Strip Mill Upgrade Project $65M.
• Sargent Electric Area Superintendant
o 07-81 thru 01-89 BVPS Nuclear Station $680M.
 Coordinated Electrical Activities in Aux Bldg/MSCV/Cntl Rm Mezz.
 Supervised & Directed 60 to 100 Union Electricians.
 Maintained tooling requirements
 Coordinated engineering corrective actions to support system turnover and startup to Client.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.