Summary of Qualifications
Construction Executive with over 20 years of experience in Design-Build, General Contracting, Construction Management, and Program Management. As Senior Vice President responsible for business development, operations, and management of all stages of new construction or renovation projects of various size and type (federal, municipal, commercial, industrial buildings, courthouse and mixed use development) from conception through completion.
• Created a new government division to focus on design/build, CM at-risk and CM for-fee projects. Hired and trained marketing and management staff for special set of skills required to serve government market.
• Managed design/construction division operations; prepared and managed annual operational budgets; developed staffing plan and hired project staff; conducted employee performance evaluations and recommended salary adjustments.
• Supervised proposal and bid preparation. Represented company in all contractual dealings with clients ensuring positive relationship.
• Served as primary contact throughout the pre-construction/predevelopment phase of major projects, and assumed project executive role.
• Managed zoning/entitlement, permitting, design and construction management of development projects. Ensured professional standards are met in accordance with project policies and procedures.
• Managed process for selection of consultants and outside contractors; monitored project performance and conducted consultant’s performance reviews.
• Developed and implemented an integrated design and construction management process from schematic design to construction document phase, construction administration, material selections, permits, construction and handover to end-user.
• Reviewed monthly project performance report with project managers, analyzed cost and schedule variances and initiated corrective action plan.
• Lead Design and Construction Division in the development of Program Management and Control System (PMCS) for the Department of Energy High Energy Physics program of Super Conducting and Super Collider (total program budget was $5 billion; design and construction budget was $1.25 billion).
• Developed and implemented procedures for contract administration and control functions of a design/build contract for United States Courthouse project in Minneapolis, a $110 million federally funded project.
• Directed senior staff in the development of project plans including time frame, funding and staffing requirements. Coordinates with project accounting group with regards to job cost setup procedures, monitoring, and preparation of cash requirements.
• Worked directly with subcontractors, owners, and attorneys in the negotiation and settlement of construction claims. For unresolved claims, drafted the memorandum of position for the trial attorney.
• Coordinated with other departments including property management, leasing, asset management and accounting, to ensure timely completion of projects on budget.
• Performed on-site visits during construction to evaluate progress and resolve performance issues.
• Ensured project completion and follow-up by soliciting client feedback and conducting post project review meetings.
Professional History
2002 – Present Senior Vice President/Project Executive, Foulger-Pratt Development
2000 – 2002 Vice President/Project Executive, Government Operations, Hess Construction Co.
1991 – 2000 Director/Senior Project Manager, Jacobs Engineering/Sverdrup Facilities
1989 – 1991 Senior Planning Engineer, Stone & Webster/Hazen & Sawyer JV
1987 – 1989 Project Engineer/Project Manager, Jenny Engineering, Project Engineer
Project Highlights
• East Campus Redevelopment: East Campus Redevelopment Project is a Public & Private Partnership, transit-oriented development, which encourages pedestrian and bicycle access and use of public transit. The Project will be developed in two phases. Phase I of the development will consist of approximately 1,000 residential units, 100,000 square feet office, 425,000 square feet retail/entertainment, 200 room hotel, 3,500 structured parking spaces and associated infrastructure to support the development. Phase II of the development will consist of 1,000 residential units and 1,400 structured parking spaces. Total project cost is around $900,000,000.
• Park Potomac Development: Park Potomac is a planned mixed used development community in Potomac, Maryland. Project includes six high rise condominium buildings consisting of 450 units of upscale condominium; 450,000 SF of commercial office space and 155,000 SF of retail space. Total project cost is around $600,000,000.
• Downtown Silver Spring, Maryland: A Public-Private Partnership project with Montgomery County, Maryland. The private portion of the development includes retail including restaurants and entertainment, office building; hotel and multi-family residential building. Total project cost is around $550,000,000. The development includes:
 Commercial/Retail Development: 500,000 SF of retail/commercial development in the Downtown Silver Spring. Development included 20 screen theatres, 180-room hotel, 250,000 SF office building, retail (16 restaurants and other retails such as Border book stores, men & women wear, furniture stores, banks, office depot etc). The project was a public and private partnership development project in the Downtown Silver Spring, MD.
 American Film Institute, MD ($26 million): 65,000 SF of Silver Theater Renovation/Addition of theatre and office space, Silver Spring, Maryland
 Town Square Garage, Silver Spring, MD: 1400 parking spaces with 5,000 SF office space and 14,000 SF retail space in Downtown Silver Spring, Maryland.
 Wayne Avenue Garage, Silver Spring, MD: 1732 parking spaces with 7,000 SF office space in Downtown Silver Spring, Maryland.
• Medical office building, Inova Loudoun Hospital ($12 million). The 110,500 square-foot medical building connected to the hospital’s emergency room and MRI suite, and accommodates an ambulatory surgery center, a cancer care center, and a PAD/CATH lab for cardiovascular services.
• The United States Courthouse, Minneapolis ($110 million) – A Design/Build Project: Federal Building – U.S. Courthouse in downtown Minneapolis, MN, built on 91,000 square-foot site is a fifteen storied (294 feet) facility, which has 500,000 gross square feet, 315,000 square feet occupiable square feet and 525 car underground parking.
• Frederick Law Enforcement Complex, Frederick, MD ($12.5 million): Construction of a new 62,595 square foot, three-story administration building for Frederick County Sheriff’s Office, the Maryland State Police and the Frederick County Central Alarm (911) Center.
• MFRI Headquarter, University of Maryland, College Park ($4.7 million): Design/Build of 20,844 square feet addition to the existing Maryland Fire and Rescue Institute Facility, University of Maryland College Park, MD
• Miner Elementary School, Washington, D.C. ($15 million): Construction of new 76,000 square feet two-story elementary school for Washington DC Public School.
• Carlin Springs Elementary School, Arlington, VA ($12 million - Multiple Prime): Construction Management Services for the 86,745 square feet, two-story elementary school.
• United States Postal Services - TMS National Deployment Contract: Program Management Services for approximately $3.0 billion TMS National Deployment Contract of up to 250 United States Postal Service Mail Processing and Distribution facilities nationwide, USA. The projects consisting of demolition of existing facilities, addition of construction to accommodate Tray Management System for United States Postal Services automated sorting equipments.
• United States Postal Services – Construction Management of $25 million, seven-design/build projects for the United States Postal Service in the Virginia, Maryland and Washington, DC area.
• United States Department of Energy – Program Management of $1.25 billion design and construction program of the Superconducting Super Collider project in Dallas.
Academic Background
• MBA University of St. Thomas, Minneapolis, MN
• MS Civil Engineering, The University of Alberta, Edmonton, Alberta
• BS Civil Engineering, NED University of Engineering & Technology
Professional Affiliation
• Registered Professional Engineer - State of Maryland and State of New York
• Licensed General Contractor
Publication:
• “Critical Issues in Design-Build Construction Contractsâ€, Contract Management Magazine, September 1999.
• “Numerical Prediction of Hopper-Bin Pressureâ€, Journal of Engineering Mechanics, ASCE. 1988.
• “Finite Element Prediction of Bin Loadsâ€, Structural Engineering Report, 1986, Univ. of Alberta
Certificate of Appreciation
• Best Honor Award by County Executive Dough Duncan, Montgomery County, Maryland – In Recognition of Significant Contribution to the Successful Completion of Public Private Partnership Redevelopment Project of Downtown Silver Spring, Maryland
• In Recognition of Significant Contribution to the Success of United States Courthouse in Minneapolis, Minnesota
• In Recognition of Significant Contribution to the Successful Completion of Accelerator System of Superconducting Super Collider Project, Dallas, Texas
Computer Skills
• Primavera, SureTrak, and Microsoft Project (Scheduling Software)
• Expedition (Contract Control Software)
• Microsoft Excel & Microsoft Word
Continuing Education:
• Project Management: Planning, Scheduling and Control; American Management Association
• Expedition/Primavera: Pinnacle Management
• Square Foot & Assembly Estimating: RSMeans
• Business Writing: American Management Association
• Cost / Price Analysis: National Contract Management Association
• Purchasing and Project Management: George Washington University
Other Qualifications
Government Policy/Procedures: Knowledgeable of FAR, DFAR, and Project Management, Cost/Schedule Control Systems Criteria and other procedures for the following government agencies:
• Department of Energy
• Department of Defense/US Army Corps of Engineers
• General Services Administration
• United States Postal Service
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.