Thank you for the opportunity to present you with my resume. I have been working in the construction industry for over thirty-seven (37) years. I have been involved in construction, maintenance and re-building of various types of projects with different craft disciplines, in many different facilities including, but not limited to: petro-chemical plants, paper mills, power plants, plywood plants, plastic plants, packaging plants, ship yards, steel mills, fabrication shops, and residential construction. For over twenty-seven (27) years I have worked as a construction manager, superintendent, project engineer, coordinator, subcontract administrator, or project manager. I have extensive experience in construction sales and estimating with a proven track record of results. I have owned and managed my own consulting business that provided construction management services for companies that did not need a full time construction engineer or manager for their capital projects. I have perform all phases of construction management including project supervision, contract administration, design, engineering, cost estimating and scheduling, subcontract administration, material take off and procurement for companies whose capital projects ranged from 10K to 470MM. Having been the sole proprietor of a company, I was responsible for all work associated with owning a business that included marketing, sales and estimating, scheduling and coordination. In addition to the above-mentioned duties I have also done tank farm and piping design, equipment and building layout, construction management and project construction. I am very proficient with a computer and skilled on all of the Microsoft programs and various other computer software programs. I have been trained in drafting and am very precise and detailed on both board and Turbo-CAD. I’ve managed projects with contract values up to $470 million dollars. While being in project management, I have managed multiple projects at one time, coordinating not only company personnel but also subcontractors. I have managed direct personnel and subcontractors in a union environment as well as a non-union environment with successful results. Due to my field, supervision and project management experience I have developed excellent communication skills, both written and verbal. I take pride in my ability to take minimal information and produce maximum results with emphasis on customer satisfaction and overall profitability of the projects that I am involved with. My focus on detailed planning and my strong commitment to safety and quality both during the design phase and construction phase of a project has allowed me to maximize profits for the companies I have worked for. I have conducted several training seminars to help employees understand their construction trade better and give them the knowledge to perform their jobs in a safer and more professional manner. In addition to my construction background, I have also been directly involved with maintenance management and training. With the industrial construction and maintenance knowledge I have and the integrity that being a Christian brings to my life, I feel that I can be an added asset to any company. I have a current passport and have worked overseas. I am willing to travel for long term or short-term projects anywhere a company requires that I go. If you should have any questions, please contact me at the numbers listed above. I will be happy to supply any information you might require and discuss my background with you. Again, let me thank you for the opportunity to present my resume to you. I will be looking forward to hearing from you in the near future.
Sincerely
Michael A. Patterson
OBJECTIVE: I am interested in working as a construction manager, superintendent, field coordinator, project engineer, or site manager, for the supervision or management of projects or crews in the petrol chemical, power, high speed packaging, heavy industrial, utility or commercial construction environment as contract or full time employee.
EXPERIENCE
EMPLOYMENT: Buzzi Unicem USA - Festus, Missouri
POSITION (DEC 2007 TO SEP 2009) SITE CONSTRUCTION MANAGER
LOCATION Buzzi Unicem, River 7000 Project – Festus, Missouri
DUTIES I had total responsibility for the management of construction site installation and commissioning of all equipment and materials, all contractors and their subs to ensure the River 7000 project was constructed safely, incompliance with Buzzi requirements, on time and within budget. My duties included, oversight of construction with respect to safety, supervision, planning and scheduling and direction of the Buzzi construction team, scheduling and coordination of contractors activities, review of drawings and design with respect to constructability, active participation in construction planning meeting with all contractors, coordination between contractors, monitoring and forecasting of construction costs, monitoring all construction cost and change order controls, resolution of all construction conflicts and constructability issues, identification of constructability problems and implementations of solutions, reporting on construction progress and anticipation of corrective measures if required and dealing with all union issues between contractors. I implemented a PBS safety program with all contractors and set up criteria for all disciplinary actions for any safety infraction. I set up a receiving department and database to unload and track all deliveries of equipment for project.
EMPLOYMENT: TIC The Industrial Company - STEAM BOAT SPRINGS, COLORADO
POSITION (FEBRUARY 2000 TO DEC 2007) Project Engineer, Mechanical Coordinator, Subcontract Administrator
LOCATION Dell Power Project, - Dell, Arkansas, Profume Chemical Dow – Pittsburg California, Hot Springs Power Project - Malvern Arkansas, Chehalis Power Project - Chehalis Washington, Hermiston Power Project - Hermiston, Oregon, Lone Star Cement – Green Castle, Indiana
DUTIES During the projects I worked on with TIC my duties were task planning, project cost control, budget development, scheduling, RFQ development and equipment procurement, sub contract administration and development, safety management, material management, developing and approving heavy rigging and lift plans and field coordination of resources. Projects included installation of Siemens 501Fs, 501G and GE 7FA Combustion Turbines, Siemens Westinghouse KN and Alstrom Steam Turbines, Doosan and Nooter Eriksen HRSGS, and a variety of other equipment associated with 2 on 1 Power Projects. In addition to equipment installation in the power industry, I also coordinated the installation of Fuller material handling equipment for a cement facility,
EMPLOYMENT: NECO LLC – LEXINGTON, KENTUCKY
POSITION (FEBRUARY 99 TO FEBRUARY 2000)-Branch Operations Manager for Millwright and Heavy Rigging Company
LOCATION Lexington, Kentucky
DUTIES It was my responsibility to direct daily operations for a company that specializes in heavy rigging, equipment moving and millwright work. I developed customer contacts, perform bid proposals, developed all lifting and equipment moving plans and project managed all work awarded. In addition, I also use my experience to train personnel in safe work practices, heavy rigging, custom fabricating, MIG, TIG and stick welding and precision millwright work. I was responsible for developing operating budgets for the year, evaluating all capital expenditures, developing business plans, interviewing and hiring all new field personnel and supervisors and developing and implementing procedures to help with the growth of the company.
EMPLOYMENT: PATTERSON CONSULTING SERVICES - COLUMBIA, MISSOURI
POSITION (JULY 97 to FEBRUARY 99) Construction Project Management/Supervision
LOCATION WORLD WIDE
DUTIES I was the owner and operator of a construction management consulting company. I specialize in projects involved in the petrol chemical industry, power industry, packaging industry, and commercial construction industry. Some of the services I offered were project management, project supervision, project scheduling, project estimating, quality control, 3rd party inspections, safety surveys, crane sizing, heavy rigging and lift plans, problem solving, contract development and administration, design and engineering, document control, sales and marketing for my company and all business activities required for managing a personal company. My projects ranged in size from $10K to $50MM. I did projects both in the US and overseas and adapt well to changing conditions, environments and cultures.
EMPLOYMENT: GLOBAL INTERMARK CORPORATION - MOBERLY, MISSOURI
POSITION (FEBRUARY 1997 to JULY 1997) Equipment Marketing Director, Sales Manager
LOCATION USA
DUTIES I devoted full time energies to developing and implementing the company’s equipment division’s sales and marketing services, and provide support and guidance to the overall operations and sales of used environmental equipment. I performed equipment evaluations and appraisals, provide marketing support by developing advertisements, developing and sending out brochures, doing presentations, and developing specialized selling documents, which included equipment descriptions, digital pictures and evaluations. I was also required to do construction proposals for the installation of equipment for clients including, design drawings for foundation layouts, equipment layout drawings and electrical load requirement work ups. I developed company procedures for sales, marketing, contracts for every aspect of our business and general operating procedures for our business. I worked directly with the technical division of the company to develop construction plans and safety plans for equipment removal and transportation, coordinated contractors with clients and insured that their equipment was installed properly and operating as required. I developed a data base system in Access to help us track our clients and our equipment to make our selling efforts more effective.
EMPLOYMENT: KOCH ENGINEERING COMPANY, INC. WICHITA KANSAS
POSITIONS (December 1990 to October 1996) Construction Sales Engineer, Project Manager, and Project Superintendent
LOCATION Eastern US, Gulf Coast, Europe, Mexico and South America for Koch Field Service
DUTIES I was responsible for regional sales, marketing, project estimating, customer contact, site visits and evaluation, customer service, subcontract development and management, project scheduling, equipment and material specification and procurement, personnel evaluation and hiring, piping design and layout, development of crane and rigging plan for both heavy and high liability lifts, development of construction safety plans and supervision of project construction for the installation of combustion equipment supplied by the John Zink Company of Tulsa, OK. I was responsible for developing all correspondence needed for sales follow-up to clients and generating all preliminary schedules for work to be done. I also assist in sales forecasting, marketing plans and craft training when required. I developed site specific safety procedures as required for individual sites and was key in the implementation of OSHA, MSHA and/or our company safety policies based on the hazards of the projects.
EMPLOYMENT PATTERSON CONSULTING SERVICES, KANSAS CITY, MISSOURI
POSITION (December 1988 to December 1990) Construction and Engineering Consultant
LOCATION USA
DUTIES Project Design, Plant management, Construction and Maintenance management for small companies that did not need full time engineers or construction managers. Specializing in capital project coordination and project management, for the design and installation of high speed packaging lines for food processing plants, breweries, oil packaging facilities and grease plants which included everything from grass root design to modification of existing systems. I was a single point of responsibility for projects entrusted to me.
EMPLOYMENT LUBRIPAC, KANSAS CITY, MISSOURI
POSITIONS (October 1987 to December 1988) Project Coordinator and Maintenance Supervisor
LOCATION Kansas City, Missouri
DUTIES Project Coordinator/Construction Manager for a $3.2 million plant expansion. Plant maintenance supervisor and plant engineer/construction coordinator for a 75 million gallon per year packaging facility. I was the point of contact between construction subcontractors, plant maintenance personnel and project engineering. I developed RFQs and awarded all subcontracts, set up safety programs for maintenance crews, did all planning and scheduling between production, maintenance and construction subcontractors, worked directly with engineering to develop the best plan for the facility that was the most constructible and did minor design and engineering work for both the maintenance department and capital project work and procured capital equipment. I insured that the budget and schedules were met and that the maximum utilization of resources was achieved from the moneys that we were spending.
EMPLOYMENT BROWN & ROOT CONSTRUCTION COMPANY, HOUSTON, TEXAS
POSITIONS (March 1983 to August 1987) Project manager, Project Superintendent, Millwright General Foreman, Millwright Foreman and Millwright
LOCATION Major construction projects through out the US
DUTIES As a construction project manager I supervised subcontracts and did scheduling for different types of projects. I was involved with budget analysis of work and man-hours to insure the maximum efficiency of the company personnel. As a Project Superintendent I supervised project construction, which included personnel management, equipment management, cost management, scheduling, and subcontract coordination. As a Millwright General Foreman I supervised several millwright crews on different projects, coordinating work and manpower loading to maximize productivity and utilization of allotted man-hours. As Millwright Foreman I was responsible for front line supervision of crews on different projects. I had to schedule manpower and assign duties with the best utilization of personnel and equipment possible to insure that the projects were completed on time and within budget. As a Millwright I was involved with the precision alignment of high speed rotating equipment, welding, crane operating and rigging, pipe fitting, structural steel erection and foundation installation.
EMPLOYMENT TEXAS ENVIRONMENTAL ENTERPRISES, HOUSTON, TEXAS
POSITIONS (February 1982 to March 1983) Project manager, Project Superintendent, Maintenance Manager
LOCATION Houston, Texas
DUTIES Designer/Fabricator and installer for a waste water management company servicing the MUD districts in the Houston area. I did design and engineering work, procurement of materials and equipment and installation of different types of equipment for several MUD districts. I also worked with other engineering firms and did special fabrication of certain equipment including; clarifier rakes, air injection systems, overflow catches and waste diverters, blower assemblies, collection systems and new lift pump installations. I also did maintenance on lift stations, sludge presses, polymer injection systems and air blower systems. All of the work that was performed had to meet the strict guidelines of the Texas Water Commission standards and was scrutinized by MUD board members.
EMPLOYMENT BROWN & ROOT CONSTRUCTION COMPANY, HOUSTON, TEXAS
POSITIONS (August 1972 to February 1982) Millwright Foreman, Millwright, Pipe Fitter, Certified Welder (pipe and structural), Fabricator/Fitter, Rigger and Heavy Equipment Operator
LOCATION Construction projects in the US.
DUTIES I started out in the construction industry working as a helper for the electrical department in Lone Star Steel. After five years at that facility, I had worked as a journeyman, millwright, rigger, structural fabricator, welder and pipe fitter. I had proven that I was very capable of performing any task asked of me and I had supervision qualities. I was promoted to a foreman and Superintendent on several projects through the first 10 years of my career with Brown and Root. I had demonstrated that I was a dedicated person and that I would do whatever was best for the outcome of a project and the betterment of the company. My main concerns were always with quality, safety and customer relations, always keeping site of the profitability of each project I was assigned to. I mastered the crafts of precision millwright work, pipe fitting, heavy equipment operation and rigging, welding, structural fabrication and iron working. My specialty was always rotating equipment alignment and installation with the emphasis on turbine rebuilds shutdown work being my specialty.
EDUCATION AND SPECIAL TRAINING
LOCATION COURSE OF STUDY
BUZZI UNICEM USA 30 Hour MSHA Training
TIC THE INDUSTRIAL COMPANY Supervisor Safety Training Level 1Supervisor Safety Training Level 2 (OSHA 10 Hour)Superintendents TrainingField Engineers TrainingUnderstanding Contract ProvisionsHiring Plan TrainingPurchasing ProceduresDeveloping and Managing ResourcesWBS CMIS EEO/Affirmative ActionDiversity in the Workplace FundamentalsCommunicate to Achieve ResultsSpeaking in Front of othersHand ToolsMedic First Aid TrainingFall ProtectionExcavation and Trenching SafetyCrane SafetyRigging SafetyElectrical SafetySafety Management SystemsSafety Task PlanningProductivity ReportingPlanning and Executing WorkCrew Productivity and PlanningHAZCOMLEI TrainingSLS TrainingFront Line Supervisor SkillsUnion Activity Guidelines for SupervisorsJob Cost ReportingContract and Subcontract IssuesPay for Performance and Employee Performance AgreementsCore ValuesScheduling BasicsP3 SchedulingSure Track SchedulingCMMS Materials Management SystemsPrologEncompassThink and Plan
KOCH ENGINEERING FIELD SERVICE Signature Service - Key to Customer SatisfactionCPR and First Aid TrainingProject Safety Management2 - 10 Hour OSHA Safety CourseFlare TechnologyVapor Recovery and Incinerator TechnologyBurner TechnologyFranklin Time Quest, Time ManagementQuality Supervision/Project ManagementCrane and Rigging sizing and safety
FRED PRYOR SEMINARS Complete Project Management
LOCATION COURSE OF STUDY
AMARILLO COLLEGE, AMARILLO, TEXAS Conversational Spanish
NORTHGATE COMMUNITY COLLEGE, KANSAS CITY, MO. Intro. To micro computer Intro. To IBM DOS
WRIGHT STATE UNIVERSITY, KANSAS CITY, MO. Maintenance Management and Scheduling
LUBRIPAC 7 Habits of Highly Affective PeopleSafety ManagementProject Management for Production FacilitiesMore Effective SupervisionBoiler MaintenanceConveyor Design Packaging Principles
NOLAN TECHNICAL INSTITUTE, DALLAS, TEXAS Motorcycle Mechanics and Welding
INTERNATIONAL CORRESPONDENCE SCHOOL, PORTLAND, OR Drafting
INTERNATIONAL CORRESPONDENCE SCHOOL, SCRANTON, OH Basic Electricity
COMBINED INSURANCE COMPANIES OF AMERICA Sales and Marketing Training
BROWN & ROOT, HOUSTON, TEXAS Maintenance SupervisionProject Management I & IIHandling Problem Employees,Quality Supervision I & IISafety on the Job SiteTurbine Alignment,Welding Symbol and Blue print InterpretationMIG and TIG Welding FundamentalsPipe fitting I & IIMillwright mechanics I & IICrane and Rigging Fundamentals
Project List
Combustion Equipment
Facility Location Project Type $ Value Duties
Hot Springs Power Project Malvern, Arkansas 2 x 1 combined cycle power plant 400M Mechanical Coordinator
Chehalis Power Project Chehalis, Washington 2 x 1 combined cycle power plant 380M Project Manager
Hermiston Power Project Hermiston, Oregon 2 x 1 combined cycle power plant 362M Mechanical Coordinator
Callidus Corporation Tulsa, Oklahoma Ground flare installation procedure 2.1M Consultant – Develop Procedure
SK Corporation Ulsan, Korea 2- ZTOF Flare installations 42M Consultant – Construction Manager
Vastar Grand Chenier, LA 250' Guy wire flare installation 3.2M Consultant – Construction Manager
Vastar Grand Chenier, LA 50' Temporary flare installation 220K Consultant – Construction Manager
Koch Pipeline Medford, OK Re-tube process heater 1.23M Construction Manager
Amoco Chemical Chocolate Bayou, TX 290' flare tip replacement 1.9M Construction Manager
Amoco Chemical Chocolate Bayou, TX Piping replacement on 290' flare 325K Construction Manager
Kaneka Pasadena, TX Thermal Oxidizer rebuild 402K Project Manager/Construction Manager
Dow Chemical Freeport, TX ZTOF Flare installation 1.1M Project Superintendent
Rhone-Poulenc Oil City, PE 125' self supported flare installation 1.75M Project Manager
Rhone-Poulenc Oil City, PE 100' derrick flare removal 275K Project Manager
Farmland Industries Coffeyville, KS Low NOX burner installation 400K Project Superintendent
Ciba Giegy Newport DE Waste gas incinerator installation 225K Project Superintendent
Dupont Chemical La Place, LA 250' self supported flare installation 1.25M Project Superintendent
Texaco Chemical Port Neches, TX 2 waste gas incinerator installations 2M Project Manager/Sales Manager
NASA Test Facility Stennis, MS 125' flare installation 275K Construction Manager
Stolt Terminals Houston, TX Marine Vapor Control system installation 979K Project Manager/Sales Manager
International Paper Company Moss Point, MS ZTOF flare installation 253K Project Manager/Sales Manager
Union Pacific Resources Carthage, TX 150' guy wire flare installation 625K Project Superintendent
Combustion Equipment cont.
Mobil Oil Chalmette, LA Elevated LRGO flare rebuild 890K Project Superintendent
Conoco Norcross, GA Vapor Control system 190K Project Superintendent
Coastal Chemical Battle Mountain, NV Low NOX Burner and wind box installation 335K Project Superintendent
Sinclair Refining Sinclair, WY 100' self supported flare installation 282K Project Superintendent
Texaco Chemical Oklahoma City, OK ZTOF flare installation 100K Project Superintendent
Trident NGL, Corp. Mt. Belview, TX Elevated LRGO flare rebuild 200K Project Manager
Southwest Refining Corpus Christi, TX 350'derrick flare rebuild 678K Project Manager
Amoco Chemical Decatur, AL Marine Vapor control system installation 902K Project Superintendent/Project Manager
BASF Chattanooga, TN ZTOF flare installation 227K Project Superintendent
Oxy Chemical Chocolate Bayou, TX Low NOX burner installation 127K Project Superintendent
High Speed Packaging
Facility Location Project Type $ Value Duties
Shed’s Food Packaging Olathe, KS Butter packaging line installation 1.7M Consultant – Construction Manager
Farmland Industries Amarillo, TX Lube oil packaging system design, procurement and installation 8M Consultant – Design – Construction Manager – Procurement
Farmland Industries Amarillo, TX Tank farm redesign and installation 7.33M Consultant – Design – Construction Manager – Procurement
Farmland Industries North Kansas City, MO Grease Packaging system expansion, design, procurement and installation 2.25M Consultant – Design – Construction Manager – Procurement
Lubripac Corp. North Kansas City, MO Lube oil packaging system design, procurement and installation 3.1M Design – Construction Manager – Procurement
Lubripac Corp. North Kansas City, MO Move tank farm from Chicago, IL to NKC 1.7M Project Manager – Maintenance Supervisor
Lubripac Corp. Houston, TX Lube oil packaging system installation 40M Millwright Superintendent
Mrs. Bairds Bakery Houston, TX Bread Baking Plant Construction 22M Millwright – Millwright Supervisor
Uncle Ben's Rice Houston, TX Rice dryer and conveyor installation 2.7M Millwright General Foreman
Uncle Ben's Rice Greenville, MS 3 Rice dryers and conveyor systems installed 6M Millwright General Foreman
Continental Can Corporation Longview, TX Can manufacturing system installation 2.2m Millwright – Rigger – Electrician
Schlitz Brewery Longview, TX Filling line equipment installation 1.11M Millwright – Rigger – Electrician
Process Equipment
Facility Location Project Type $ Value Duties
Sun Oil Company Tulsa, OK Tray and Packing installation 1.7M Project Superintendent
Champion Paper mill Pensacola, FL Paper Machine rebuild 7.7M Millwright General Foreman
Texas United Chemical Company Lake Charles, LA Calcium Chloride plant construction 4.4M Millwright General Foreman
Amoco Chemical Texas City, TX CO-Generation construction 225M Millwright – Turbine Alignment
Process Equipment cont.
Amoco Chemical Texas City, TX Water Clarifier installation 22M Millwright General Foreman
Texas Eastman Company Longview, TX Ethylene Glycol plant rebuild 18M Millwright – Rotating equip. Alignment
Champion Paper Mill Cortland, AL Paper machine rebuild 8.9M Millwright General Foreman
Stoffer Chemical Co. Houston, TX Acid Plant rebuild 7.77M Millwright Superintendent
Stoffer Chemical Co. Houston, TX 500' vent stack rebuild 2.66M Millwright – Rigger – Supervisor
St Regis Paper Co. Sheldon, TX Paper machine rebuild 8.88M Millwright
Kirby Plywood Products Cleveland, TX Plywood plant rebuild 13M Millwright
Champion Paper Mill Pasadena, TX Head Roll and Calendar section on paper machine rebuild 7.7M Millwright Foreman
Ethyl Corporation Deer Park, TX Ethylene compressor rebuild 3.3M Millwright – Millwright Foreman
Champion Paper Mill Pasadena, TX Re-pulper rebuild 4.99M Millwright Foreman
Champion Paper Mill Pasadena, TX Tank farm rebuild 2M Pipe Foreman – Millwright Foreman
Big 3 Corporation Victoria, TX Sulzer and Joy compressor installation 6.6M Millwright – Millwright Foreman
IMCO Services Houston, TX Barite plant design and installation 5.2M Millwright – Structural Fabricator – Crane Operator
IMCO Services Houma, LA Barite plant design and installation 4.44M Millwright – Structural Fabricator – Crane Operator
Stanco Bolt Company Houston, TX Plant move 1.63M Millwright
Union Carbide Company Deer Park, TX Hitachi compressor installation 3.75M Millwright – Turbine alignment
Champion Paper Mill Pasadena, TX Heat Recovery Boiler Rebuild 1.9M Boilermaker – Pipe Fitter
Otis Engineering Houston, TX Pipe Threading system installation 3M Millwright Foreman – Millwright
Brown and Root Marine Yard Houston, TX Off Shore platform fabrication 600M Heavy Rigger
Texas Medical Center Houston, TX 4-Steam turbine installations 2.8M Millwright – Millwright Foreman
U.S. Gypsum Galena Park, TX Paper machine rebuild and alignment 22M MillwrightMillwright Foreman
Process Equipment cont.
Arco Chemical Company Sheldon, TX Turbine and compressor rebuild 51M Millwright – Millwright Foreman
Cameron Iron Works Houston, TX 29,000 ton press installation 271M Millwright – Pipe fitter – Millwright Foreman
Cameron Iron Works Houston, TX Tool and Die shop layout and installation 18M Millwright Foreman
Kirby Plywood products Cleveland, TX Hydrostatic drum de-barker installation 108M Millwright
Lone Star Steel Lone Star, TX Open hearth rebuild 32M Millwright
Lone Star Steel Lone Star, TX Pipe Mill rebuild 16M Millwright Foreman
Lone Star Steel Lone Star, TX Iron ore plant rebuild 27.2M Iron Worker – Millwright
Lone Star Steel Poteau, OK Coal plant disassembly and move 13.8M Millwright – Crane Operator
Lone Star Steel Lone Star, TX Coal plant assembly Millwright - Crane Operator
Lone Star Steel Poteau, OK Marion Drag line rebuild 7.7M Millwright – Millwright Apprentice
Kinco Services Hughes Springs, TX Machine Shop equipment rebuild 882K Maintenance Mechanic
Pipe Engineering Hughes Springs, TX Pipe Threading equipment rebuild 630K Maintenance Mechanic
Lone Star Steel Lone Star, TX Coke oven rebuild 1.1M Millwright Apprentice
Lone Star Steel Lone Star, TX Pipe extrusion plant installation 72M Millwright Apprentice – Crane Operator
Lone Star Steel Lone Star, TX Mechanical Tubing Plant installation 27.6M Millwright Apprentice – Crane Operator
Miscellaneous Projects
Facility Location Project Type $ Value Duties
Buzzi Unicem USA Festus, Missouri Manage erection of a new 7000 TPD cement plant for Buzzi 368M Construction Manager
TIC/Fuller/Lone Star Cement Greencastle, Indiana Install new cement plant equipment for Lonestar Cement 250M Construction Coordinator
James N. Gray Georgetown, Kentucky Build and install scrap bunkers for Toyota 1.75M Operation Manager
PSI/Kobe Erlanger, Kentucky Offload and install tire machine for Toyota 200K Operation Manager
Krauss Maffei Frankfort, Kentucky Offload and install 14 extrusion presses 432K Operation Manager
Cornerstone Baptist Church Columbia, Missouri Parking lot enlargement 2.5K Consultant – Construction Manager
Miscellaneous Projects cont.
Global Intermark Moberly, Missouri Environmental Equipment Sales 102M Sales Manager – Equipment Appraisal
Texas Environmental Enterprises Houston, Texas MUD district blower alignment and rebuild 33K Owner – Contractor
Texas Environmental Enterprises Houston, Texas MUD district water system modification 8.7K Owner - Contractor
Texas Environmental Enterprises Houston, Texas Waste water treatment plant modification 33.2K Owner - Contractor
Texas Environmental Enterprises Houston, Texas Maintenance for several MUD districts waste water treatment plants 7.75K Owner – Contractor
Texas Environmental Enterprises Houston, Texas Sludge press rebuild and modification 3.8K Owner – Contractor
Personal Varied location General home and property modifications 75K Owner - Contractor
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.