Program Manager/Project Manager/Construction Manager
1995 - Present BECHTEL CORPORATION
Field Engineering for Bechtel Oil Gas & Chemical
Area Civil Superintendent
4/16/2007 – Present
Motiva Crude Oil Expansion: Customer: [Shell Oil]
Initially reported to the Project Engineer in the initial phase of developing execution strategies for a large refinery expansion (7.2 Billion) in Houston Texas. Developed contract and work execution packages for area civil plant foundations, storm water drainage, heavy haul road construction, pile installation, pipe rack and concrete structure foundations. I then mobilized to the field and constructed all site preparation foundations for the refinery expansion plants. Presently, I am the site Civil Superintendant for the construction of the new Naphtha plant. I supervise a large multi craft force consisting of Iron Workers, Carpenters, Operators, Pipefitters, and Laborers. We have constructed all of the concrete foundations for the pipe racks, heater, and reactor foundations, all table tops, and all plant equipment and pump foundations. We have erected all of our steel structures, and placed all underground storm water, fire water piping and above surface piping. We presently are conducting backfill and area paving operations. We are staging our modules and are in the process of placing our pipe rack modules.
I also have OG&C Indirect experience.
Deputy Site Manager; Buy Off/Commission Manager
Aerospace and Defense: Customer: [Boeing]
8/22/05 – 4/16/2007
Responsible for managing all field construction, Quality Control and Commissioning, for 20 defense Missile launch sites. Each site must conform to strict Configuration Management and Safety
Decommission Project Manager
1/2005 – 8/22/05
Managed four projects that entailed decommissioning and dismantlement of
four outdated production buildings at the Paducah, KY Department of Energy (DOE)
Site. Drafted regulatory plans, formed teams, developed schedules, prepared briefing
papers, and prepared procurement packages. All phases of these development packages, required strict attention to both DOE, and OSHA and other federal agencies’ safety and quality provisions,
Regional Area Construction Manager
Aerospace and Defense: Customer: [Boeing]
5/2000 -1/2005
Managed the construction of numerous launch sites for the United States Ground Based Mid-Flight Missile Defense Project. Responsible for the management of these sites from initial project engineering, industrial fabrication (With strong emphasis on Boeing Configuration, Safety, and Quality Control), contract formulation, site acquisition, entire field construction process, and start up and commissioning. Responsible for developing a multi-year construction plan that reflected progress and milestones for all areas of responsibility. Conducted monthly and quarterly program reviews for senior management, and senior customers. Coordinated regional construction management activities with other EPC Division Managers at Program Headquarters.
Construction Manager
07/2001-5/2000
Field Construction Manager for the New Jersey Light Rail Transit. Responsible for management of the general contractor and numerous sub contractors to Bechtel for the construction of a 95 acre yard and shop maintenance facility. Responsible for every phase of this project to ensure on-schedule completion and within budget. Responsible for all construction operations. Responsible for management of all personnel associated with this project.
Project Manager
10/2000-Present
Project Manager for Metro Media Fiber Network Project in the San Francisco Bay Area Office. This project is a Network Service project and consist of 600 miles of primary network (backbone). The scope of work for this service project is to develop and manage several smaller projects for the connection of numerous customer services. These projects require management of all engineering, procurement, project execution plans, project control, and contracting for construction.
Regional Project Manager
2/2000-10/2000
Manage seven multi customer telecommunication projects in cities located in Texas and Missouri. Responsible for the management of two OSP builds that consisted of a total of 90 miles of underground fiber optics with 24 LSO and IXC connections for telecommunications encircling the cities of Austin, and San Antonio,TX. My staff had the responsibility for the construction management of each. Responsible for the construction of five telecommunication (ISP) switch buildings and installation of fiber optic equipment for operational use in Dallas, Houston, San Antonio, TX, St. Louis, MO, and Kansas City, MO. Manage multilevel staff and sub contractors. Responsible for developing each market from the initial engineering and budget estimates to the completion and turn over to the customers. This position required that I drive the charters and mission goals of senior management from each co build Partner Company into a compatible effective product for all parties.
Program Manager ( FUSRAP )
1/1999 - 2/200
Responsible for the program management of multi reclamation projects relating to national defense and weapons projects located in various cities within the USA. These projects were sensitive in nature due to the close proximity of private homes and businesses. As the Program Manager in Oak Ridge, Tennessee, managed the close out of all remaining contracts, and for disposition of program records. Success of the program required detailed coordination with customers and Bechtel management teams. Several large contracts were initiated and completed. This position required extensive experience in budget planning and reporting, and contract execution.
Project Manager
2/98 - 9/1999
Managed the FUSRAP project in the Buffalo, New York and Maywood, New Jersey District Offices. Responsible for the district activities; developed execution plans; coordinated client requirements with project resources; managed internal teams of engineers and scientists in planning and execution of work budget and schedules.
Responsible for the remediation of thirty FUSRAP sites which included the decommissioning, decontamination, and reutilization of numerous buildings and
remedial sites.
9/1995 – 2/1998 REECO/BECHTEL NEVADA
Project Manager/Principal Scientist
Principal Scientist for RECO and converted to Project Manager for Bechtel Nevada Inc. Managed solid waste operations at the United States Department of Energy (DOE) Nevada Test Site (NTS). Management responsibility for three state permitted sanitary landfills; thirteen state permitted swage lagoon systems consisting of 51 basins; a U.S. Department of Environmental Protection Agency (EPA) Resource Conservation Recovery Act (RCRA) permitted facility. Responsible for environmental remediation projects such as decontamination and decommissioning of NTS facilities. Responsible for the management of divisions for solid waste management, engineering, regulatory compliance, records management, and union labor relations.
1992 - 1995 MACTEC, HANFORD, WA
Environmental Task Leader
Environmental task lead for DOE Tank Waste Remediation System. Provided technical and management support to DOE-RL for implementation of environmental requirements. Provided support for operating permits; conducted internal audits and supported RCRA corrective action projects.
1990-1992 UNITED STATED DEPARTMENT OF ENERGY, YUCCA MOUNTAIN PROJECT
Physical Scientist
Responsible for environmental compliance and permitting for the Yucca Mountain Project, and the management of DOE contractor Science Applications International. Provided guidance to the contractor and managed the process for completion of numerous environmental construction and remediation projects.
1979-1990 UNITED STATES DEPARTMENT OF THE INTERIOR, OFFICE OF SURFACE MINING
Project Officer
Inspected several complex surface and coal mines for safety and environmental permit requirements. Project officer for Minerals Management Department. Participated in a cooperative agency program with U.S. Bureau of Mines in research for development of correct mixtures of bituminous feed stock of fuels for rotary and fluidized bed process of direct iron reduction of iron ore in the development of steel production. Coordinated with industries in the development of process plants for this experimental technology.
1977-1994 U.S. ARMY ENGINEER OFFICER (ACTIVE DUTY AND ACTIVE RESERVE)
Engineer Officer
Engineer officer for combat and regional engineers for engineering projects within the United States. Participated as a Commander of several units in both Company and Field Grades.
EDUCATION AND PERSONNEL DEVELOPMENT PROGRAMS
Engineering and Science, Purdue University, 1972-1975
B.S. Science, University of Idaho, 1977
Branch Engineer, Engineering, U.S. Army, Fort Belvior, VA, 1977
Advance Engineer, Engineering, U.S. Army, Fort Belvior, VA, 1986
Attended OSHA Safety Academy at San Diego, CA. Awarded Construction Safety Instructor Certification
Numerous DOE/RCRA 40 hour; eight hour supervisor, and RAD Worker I, II training courses.
PROFESSIONAL LICENSES AND AFFILIATIONS
Solid Waste Association of North America (SWANA)- Certificate #2522
Society of American Military Engineers
Chemical Hazardous Material Manager (CHMM) 1991
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.