Steven has over 20 years experience in construction, including more than 10 years as Project Engineer on various public works and facilities based projects. He is proficient in Expedition, Prolog and e2020 Tracking Software and has extensive experience with document controls, technical specification reviews and general office management. He has strong people skills and is experienced in strategic planning, budgeting, and negotiation.
Project Experience
Bovis Lend Lease (June-2007 to August-2009)
Bovis Contact: Randy Hartman – 909-376-7011
LAWA Program Manager: Matt Brown – 310-678-6715
ï® $192 million, In-Line Baggage Handling System Upgrade, North Terminal, Los Angeles International Airport
Project Engineer. Project was to replace/modify the existing outbound Baggage Handling System (BHS) with new in-line outbound BHS that integrates with new Explosion Detection Systems (EDS) machines and associated equipment in Terminals 1-3 at LAX. The scope of the project includes extensive phased development and staged integration of multiple existing and new baggage conveyance systems, monitoring and control systems. Responsibilities include assisting several Construction Managers and Program Manager with all documentation including the processing of RFI’s, Submittals, Change Orders, update drawings, confirm contractor’s record drawings and technical specifications. Preside over Safety Focus team for the project. Coordinate testing of sub-systems with LAWA personnel and outside agencies.
ï® Gateway Science Engineering ( May 2003 to June 2007)
Contact: Mike Lengyel - 714-655-2028
LAUSD Region 5 Existing Maintenance School Upgrade
Pasadena, California
$100,000 to 1million. Project Engineer/OAR. Assist several Construction Managers and Program Managers with all documentation including the processing of RFI’s, Change Orders, Cost Control and Submittals using Expedition tracking system for the Los Angeles Unified School District Facilities Services District H project. Conduct Job Start Meetings from beginning of Construction to Closeout. Mr. Goldfarb was in charge of the training of new personnel in the use of Expedition. Responsibilities included general office management and all facets of documentation control.
ï® Mallcraft, Inc. (February 2003 to May 2003)
Contact: Gerry Fishbein - 626-398-3598
Altadena, California
14 million. Senor Project Administrator. Assisted Program Managers, Project Managers and Vice President with multiple projects including Santa Monica Bus Fuel and Wash Facility project, Chico University renovation project, and Arcadia Police Department. Responsible for document controls using Prologue software system. Created and processed RFI’s, Submittals and Change Order Requests. Created Schedules for project look aheads.
ï® CH2M Hill (August 2001 to February 2003)
Contact: Bob Garcia - 626-219-5276
Santa Ana, California
14 million. Project Controls Administrator/Office Manager. Project Controls assistant for the City of Santa Monica Big Blue Bus Campus expansion multi-phased $14 million dollar program management/construction management project. Assisted in the
preparation of the contractors submittal list for the first phase construction project. Responsible for processing all RFI’s and Submittals using Expedition tracking software system. Reviewed technical specs and contract and how they relate to submittal list and drawings. Researched information for trailer setup and office leasing space. Setup and scheduled meetings for Program manager and client. Responsibility for general office management which include inventory of office supplies/equipment. Documentation control using CSI filing system. Setup initial spreadsheet for vendors and other budget requirements.
ï® TRW Aerospace, Inc. (Gruman)
310-553-6262
Redondo Beach, California
Lab Analyst. Responsible for the assembly and construction of automated test equipment for pre-flight satellite circuitry and electromechanical devices. Duties included the assembly, maintenance, and testing of automated equipment and actuator units. Also responsible for scheduling manpower for future flight projects.
ï® Teleflex Control Systems, Inc.
Contact: Alex Rivera - 805-578-7317
Oxnard, California
Engineering Data Manager. Technical Writer for commercial aircraft motors and actuators. Responsible for managing the configuration control department. Duties included creating new and updated Acceptance Test Procedures, mechanical assembly drawings, procedures and implementing Engineering Change Orders.
ï® Schaeffer Magnetics, Inc. (Moog Inc.)
Contact: Ernie Schaffer - 818-341-5156
Chatsworth, California
Lead Engineering Technician. Responsible for assembling, constructing, and testing space flight actuators and motors. Able to read mechanical/electrical drawings and build to print assembly drawings. Test of adhesives and stress test metals.
ï® TRW Aerospace, Inc. (Gruman) (1979 to 1989)
Contact: Mark Rosenfeld - 310-553-6262
Redondo Beach, California
Lab Analyst. Responsible for the construction of High Voltage automated test equipment for pre-flight satellite circuitry and electromechanical devices. Test of instrument controls and proto type devices. Responsible for scheduling manpower for future flight projects.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.