The purpose of this letter is to introduce myself to your firm. I have recently completed my tasks as an AVP/Senior Project Architect/Lead Construction Administrator on a regional Medical Center project in Anaheim, California at Cannon Design Architects and need to find a new job due to lack of adequate work load at the office. Please refer to my attached resume with the most recent position description for your review and information. Your consideration of my resume for your projects is greatly appreciated.
I have 30 years of experience in the field of architecture and construction with specific knowledge of the following documentation and procedures:
• Owner, Architect and Consultants contracts with fee schedules.
• Construction drawings and specifications.
• California Building Code and ADA regulations.
• OSHPD, OSA including local governing agencies plan-check and permit process.
• Construction Administration and project close-out.
• Submittals, shop drawings, requests for information and logs.
• Project schedules, budget, cost estimating and value engineering.
• Contract modifications, contractors pay applications and change order requests.
Should you require any further information and/or professional references, please do not hesitate to contact me at your earliest convenience.
Respectfully submitted,
Sean Maghsodi, AIA, CSI
Registered Architect
R E S U M E
Sean Maghsodi, AIA, CSI
Registered Architect
20858 Kelvin Place, Woodland Hills, California 91367
Telephone: 818 - 441.1554 / E-mail: seanmaghsodi[at]aol.com
I have 30 years of experience in the field of architectural design, drawings, specifications, management and construction administration including California Building Code, ADA regulations, OSHPD, DSA with various governing agencies plan-check and permit process. My computer skills include Auto CAD, Word, Excel, Project, Primavera and Prolog for documentation, logging and correspondence.
The following architectural firms and projects describe my professional experience for your information:
CANNONDESIGN
September 2008 - January 2010
Kaiser Permanente Replacement Hospital and Medical Center, Associate Vice President/Senior Project Architect/Lead CA
Orange County, Anaheim, California
Master planning, design and construction for a new regional Medical Center on a 27-acre site including a replacement Hospital inpatient tower with (386 beds), D&T, MOB 1, HSB with rooftop Helistop, Central Plant, Parking Structures and a Healing Garden with water features. Total project cost of $575,000,000.
Position Description:
1. Owner, Architect and Consultants contracts including fee schedules.
2. Site development design, construction drawings and specifications for a campus (27 acres). Coordination of drawings including cost with the City of Anaheim, owner, consultants and contractors.
3. Attending OAC meetings to review project status, cost, schedules and construction documents permit process.
4. Attending construction management weekly meetings to review the project outstanding issues at the jobsite.
5. Attending project cost weekly meetings to process pay application, contract modifications and change orders.
6. OSHPD plan check, change orders and permit process.
7. City of Anaheim Building Department plan check and permit process.
8. Hospital Support Building planning and schematic design including specifications.
9. Medical Office Building No. 1 construction administration and project close out.
10. Submittals, shop drawings, requests for information with logs review and approval process.
RTKL
August 2002 - September 2008
SLS (Le Meridien) Hotel, Principal/Senior Project Architect/Lead CA
Beverly Hills, California
Complete renovation of an existing 7-story Hotel with 297 guestrooms and two levels of subterranean parking garage. Our scope of work was to provide design and construction for the existing guestrooms, bathrooms, corridors, ballroom, meeting rooms and exterior elevations. Addition of a new kitchen, restaurants, bars, an event terrace and two large rooftop swimming pool concrete deck including retrofit of the existing structural concrete framing and shear walls. Total project area of 269,000 sq. ft. and cost of $47,000,000.
Position Description:
1. Owner, Architect and Consultants contracts including fee schedules.
2. Design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedules and construction documents permit process.
4. Attending construction management meetings to review the project outstanding issues and change orders.
5. LA City Planning, Building and Fire Department plan check, Bulletins and permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
717 Olympic Tower, Principal/Senior Project Architect/Lead CA
Los Angeles, California
New 26-story high-rise residential tower with 151 luxury apartment units, seven levels of podium parking garage for 284 stalls, rooftop Helistop, pool, amenities, theater, and ground level commercial tenant space. Total project area of 182,000 sq. ft. with cost of $78,000,000.
Position Description:
1. Owner, Architect, Consultants and Contractors contracts including fee schedules with payments.
2. Design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedules and construction documents permit process.
4. Attending construction management meetings to review the project outstanding issues and change orders.
5. LA City Planning, Building and Fire Department plan check, bulletins and permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
CSUCI East Campus Town Center, Principal/Project Manager/Lead CA
Camarillo, California
Four new 3-story mixed use buildings, with 58 faculty residential units on two levels over 32,000 square feet of ground level offices, retail spaces, health center and 20,000 sq. ft. of central plaza including two adjacent parking lots for 250 stalls and landscaping. Total project area of 92,000 sq. ft. and cost of $18,500,000.
Position Description:
1. CSU Chancellors Office, Architect, Consultants and Contractors contracts including fee schedules with payments.
2. Managing construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedules and construction documents permit process.
4. Attending construction management meetings to review the project outstanding issues and change orders.
5. Submittals, shop drawings, requests for information with logs review and approval process.
The Mandalay Terraces, Principal/Project Manager
South San Francisco, California
Mixed use development project schematic design phase, which included more than 2,000,000 sq. ft. of quality retail shops, restaurants, entertainment together with superb high rise residential and office towers including five levels of parking structure to provide more than 2,500 parking stalls in a more traditional main street urban living. Unfortunately, this project has been on hold due to the City’s unreasonable requirements.
Position Description:
1. Owner, Architect and Consultants contracts including fee schedules with payments.
2. Managing design drawings, specifications and coordination with owner/consultants.
3. Attending meetings with owner/consultants to review project status, cost, schedules and drawings.
Fantasy Springs Hotel and Casino, Principal/Project Manager/Lead CA
Indio, California
Master planning and a large scale expansion of a 200 acre resort with a new 12-story tower, 238,500 sq. ft., 250 guest rooms, several restaurants, bars, swimming pool, Jacuzzi, recreational facilities and retail spaces. Special Event Center, 100,000 sq. ft. Central Plant, 14,000 sq. ft. Total project cost of $118,000,000.
Position Description:
1. Owner, Architect, Consultants and Contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/contractors.
3. Attending OAC meetings to review project status, cost, schedules and construction documents permit process.
4. Attending construction management meetings to review the project outstanding issues and change orders.
5. Local Planning, Building and Fire Department plan check, bulletins including permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
Little Italy Residential Towers / Aqua Vista, Principal/Project Manager/Lead CA
425 West Beech Street, San Diego, California
Two new 18-story high rise residential towers with multi levels podiums and 382 luxury apartment units located on a 1.75 acres site including pool deck, Jacuzzi and recreation facilities. Two and half levels of subterranean parking with 400 stalls. Total project area of 285,000.00 sq. ft. and cost of $74,000.000.
Position Description:
1. Owner, Architect, Consultants and Contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedules and construction documents permit process.
4. Attending construction management meetings to review the project outstanding issues and change orders.
5. San Diego Planning, Building and Fire Department plan check, bulletins and permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
Fields Devereaux Architects & Engineers
April 1999 - August 2002
High Desert Medical Center, Senior Project Architect/Lead CA
Lancaster, California
Senate Bill 1953 SPC2/NPC3, Seismic bracing retrofit and complete renovation of the existing one story Hospital with central plant building. Total project area of 175,000 sq. ft. and cost of $42,000,000.
Position Description:
1. Owner, Architect, Consultants and Contractors contracts including fee schedules with payments.
2. Construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule, documents permit process.
4. OSHPD and Fire Department plan check, change orders, bulletins including permit process.
Saint John Pleasant Valley Hospital, Project Manager
Oxnard, California
Complete renovation of the existing Radiology Department CAT Scan with new medical equipment.
Position Description:
1. Owner, Architect, Consultants and Contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule, documents permit process.
4. OSHPD and Fire Department plan check, bulletins including permit process.
5. Submittals, shop drawings, requests for information with logs review and approval process.
CHS Vivarium Upgrade, Project Manager
University of California in Los Angeles, California
Complete renovation of the existing fourth floor Vivarium department with total project area of 15,250 sq. ft.
Position Description:
1. UCLA, Architect and Consultants contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule and construction documents permit process.
4. Attending Construction Management meetings to review the project outstanding issues and change orders.
5. OSHPD and Fire Department plan check including permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
Bacheller Hall Research Laboratories Renovation, Project Manager
University of California in Riverside, California
A. Raikhel Laboratory, an existing 5,000 sq. ft.
B. Bailey Serres Laboratory, an existing 3,500 sq. ft.
C. Core Instrumentation Laboratory, an existing two-story 14,500 sq. ft.
Position Description:
1. UCI, Architect, and Consultants contracts including fee schedules with payments.
2. Attending OAC meetings to review project status, cost, schedules and document.
3. Managing design, construction drawings, specifications and coordination with owner/consultants/contractors.
4. UCI and Fire Department plan check, bulletins including permit process.
5. Submittals, shop drawings, requests for information with logs review and approval process.
IUSD - Inglewood High School, Project Manager
Inglewood, California
Master planning, design and construction for the existing 18.52 acres campus with nine new two-story buildings with total area of 150,000 sq. ft. and modernization of five existing buildings with total area of 110,000 sq. ft.
IUSD - Hillcrest Elementary School, Master Plan and Feasibility Study, Project Manager
Inglewood, California
The intent of this study was to augment the school from 140 student’s population to 400 students’ facilities with the relocation of the campus to a new and larger site.
IUSD – Worthington Elementary School, Master Plan and Feasibility, Project Manager
Inglewood, California
The intent of this study was to report to the district the existing facilities conditions. Provide a feasibility program for modernization with the opinion of probable project costs.
Position Description:
1. IUSD, Architect, and Consultants contracts including fee schedules with payments.
2. Attending IUSD Board meetings to review project status, cost, schedules and document.
3. Managing programming, planning, design drawings, specifications and coordination with owner/consultants.
RBB Architects
December 1997 - April 1999
Geology Science Laboratories, Senior Project Architect
University of California in Riverside
New 3-story 45,000 sq. ft. building with teaching, research laboratories and faculty offices connected to the existing Science Building.
Position Description:
1. UCI, Architect and Consultants contracts including fee schedules with payments.
2. Design, construction drawings, specifications and coordination with owner/consultants.
3. Attending Owner/Consultants meetings to review project status, cost, schedule and construction documents.
4. UCI and Fire Department documents plan check including permit process.
HOK
August 1995 - December 1997
LAC + USC Medical Center Replacement Project, Project Architect
Los Angeles, California
Master planning, design and construction for the entire Medical Center on a 15-acre site including a new Hospital inpatient tower with (600-beds), D&T, rooftop Helistop, outpatient Tower, Central Utility Plant and Parking Structure. Total project area of 1,500,000 sq. ft. and cost of $818,000,000.
Position Description:
1. Design, construction drawings, specifications and coordination with owner/consultants/ contractors.
2. Attending meetings with owner/consultants/contractors to review construction documents permit process.
3. OSHPD and Fire Department documents plan check, bulletins including permit process.
Berkeley East Convalescent Hospital, Project Manager/Lead CA
Santa Monica, California
New 4-story Skilled Nursing Facilities with (207-beds), full service Kitchen, Offices, two levels of subterranean Parking Basement. Total project area of 121,500 sq. ft. and cost of $18,000,000.00.
Position Description:
1. Owner, Architect, Consultants and contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule and construction documents permit process.
4. Attending construction management meetings to review the project outstanding issues and change orders.
5. OSHPD and Fire Department documents plan check, bulletins including permit process.
Saint John Hospital, Project Architect/Lead CA
Santa Monica, California
Complete renovation of the existing CAT Scan Rooms #1 & #2, Level 2 Prenatal Department, Level 3 Nurse Stations.
Position Description:
1. Construction drawings, specifications and coordination with owner/consultants/ contractors.
2. Attending meetings with owner/consultants/contractors to review construction documents permit process.
3. OSHPD and Fire Department documents plan check, bulletins including permit process.
Langdon Wilson
June 1992 - August 1995
King Drew Medical Center - Trauma Center, Project Architect/Lead CA
South Central Los Angeles, California
New 5-story Hospital Trauma Center, Basement Level D&T, rooftop Heli-stop with structural Seismic Base Isolation System. Total project area of 162,000 sq. ft. and cost of $52,000,000.
Position Description:
1. Construction drawings, specifications and coordination with owner/consultants/ contractors.
2. Attending meetings with owner/consultants/contractors to review construction documents permit process.
3. OSHPD and Fire Department documents plan check, bulletins including permit process.
BUSD – El Rodeo Elementary School, Project Manager/Lead CA
Beverly Hills, California
Master planning, complete renovation, modernization and construction of the existing facilities on a 10.5 acres campus including, play ground, landscape and hardscape.
Position Description:
1. Attending BUSD Board meetings to review project status, cost, schedules and documents.
2. Managing programming, planning, design drawings, specifications and coordination with owner/consultants.
Widom Wein Cohen
May 1989 – June 1992
Venice Family Clinic & Health Center, Project Manager/Lead CA
Venice, California
New 2-story, 30,000 sq. ft. addition and complete renovation of an existing 10,000 sq. ft. Medical Clinic Building, parking, landscape with fire and life safety with ADA requirements. Total project cost of $11,000.000.00.
Position Description:
1. Owner, Architect, Consultants and contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule and construction documents permit process.
4. Attending construction management meetings to review project outstanding issues and change orders.
5. Building and Fire Department documents plan check, bulletins including permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
State Office Building, Project Manager
Los Angeles, California
Study for an existing 9-story 534,000 sq. ft. essential facility office building infrastructure retrofit. The architect-consultant team evaluated and identified the existing building's deficiencies and made recommendations in a 400-page report for renovation/retrofit of the entire site.
Position Description:
1. OSA, Architect and Consultants contracts including fee schedules with payments.
2. Managing design drawings, reports and coordination with owner/consultants.
3. Attending meetings with owner/consultants to review project status, cost, schedules and documents.
The Ice House Office Building, Project Manager/Lead CA
Beverly Hills, California
Complete renovation of an existing 4-story, 45,000 sq. ft office building, including seismic retrofit, parking, fire and life safety with ADA requirements.
Position Description:
1. Owner, Architect, Consultants and contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule and construction documents permit process.
4. Attending construction management meetings to review project outstanding issues and change orders.
5. Building and Fire Department documents plan check, bulletins including permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
American Isuzu Facilities, Project Manager/Lead CA
Whittier, California
First phase consisted of seismic retrofit and code analysis for a 2-story, 185,000 sq. ft. headquarters’ offices and warehouses. Second phase involved interior renovations for 90,000 square feet of corporate offices.
Position Description:
1. Owner, Architect, Consultants and contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule and construction documents permit process.
4. Attending construction management meetings to review project outstanding issues and change orders.
5. Building and Fire Department documents plan check, bulletins including permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
Specter Residence, Project Manager/Lead CA
Cheviot Hills, California
New 3-story custom Residence with five bedrooms, five bathrooms, pool, Jacuzzi, hillside structural framing, landscape and hardscape. Total project area of 5,250 sq. ft.
Position Description:
1. Owner, Architect, Consultants and contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule and construction documents permit process.
4. Attending construction management meetings to review project outstanding issues and change orders.
5. Building and Fire Department documents plan check, bulletins including permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
Golob Residence, Project Manager/Lead CA
Malibu, California
New 1-story custom Residence with four bedrooms, three bathrooms, pool, Jacuzzi, hillside structural framing, landscape and hardscape. Total project area of 4,750 sq. ft.
Position Description:
1. Owner, Architect, Consultants and contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule and construction documents permit process.
4. Attending construction management meetings to review project outstanding issues and change orders.
5. Building and Fire Department documents plan check, bulletins including permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
Glendale Memorial Hospital, Project Architect
Glendale, California
New 3-story addition to an existing regional Hospital with total project area of 45,000 sq. ft.
Position Description:
1. Construction drawings, specifications and coordination with owner/consultants/ contractors.
2. Attending meetings with owner/consultants/contractors to review construction documents permit process.
3. OSHPD and Fire Department documents plan check, bulletins including permit process.
4. Submittals, shop drawings, requests for information with logs review and approval process.
Nadel Partnership
July 1986 - May 1989
Red Lion Inn Hotel, Architect
Modesto, California
New 14-story mixed-use Hotel with 200 guestroom, restaurants, bars, night club, ballrooms recreational facilities with top floor Offices.
Total project area of 112,000 sq. ft. and cost of $38,500,000.00.
Position Description:
1. Construction drawings, specifications and coordination with consultants.
2. Attending meetings with consultants/contractors to review construction documents permit process.
3. Building and Fire Department documents plan check including permit process.
4. Submittals, shop drawings, requests for information with logs review and approval process.
State Street Office Building, Architect
Santa Barbara, California
New 4-story mixed-use office building, including 10 residential units, retail spaces, parking lot and landscaping.
Position Description:
1. Construction drawings, specifications and coordination with consultants.
2. Attending meetings with consultants/contractors to review construction documents permit process.
3. Building and Fire Department documents plan check including permit process.
Brentwood Gardens, Architect
Los Angeles, California
New 3-story retail building with two levels of subterranean parking. Total project area of 150,000 sq. ft.
Position Description:
1. Construction drawings, specifications and coordination with consultants.
2. Attending meetings with consultants/contractors to review construction documents permit process.
3. Building and Fire Department documents plan check including permit process.
Torrance Crossroads Shopping Center, Project Manager/Lead CA
Torrance, California
Twelve new one-story retail buildings, 375,000 sq. ft. on a 30.5 acre site with parking lot (1,500 stalls) and landscaping.
Position Description:
1. Owner, Architect, Consultants and contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule and construction documents permit process.
4. Attending construction management meetings to review project outstanding issues and change orders.
5. Building and Fire Department documents plan check, bulletins including permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
San Bernardino Shopping Center, Project Manager/Lead CA
San Bernardino, California
New 1-story retail center (50,000 sq. ft.) with Loading Dock and parking lot and landscaping.
Position Description:
1. Owner, Architect, Consultants and contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule and construction documents permit process.
4. Attending construction management meetings to review project outstanding issues and change orders.
5. Building and Fire Department documents plan check, bulletins including permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
Sportmart Outlets, Project Manager/Lead CA
Southern, California
Four new projects with (40,000 – 60,000 sq. ft.) at each location.
Position Description:
1. Owner, Architect, Consultants and contractors contracts including fee schedules with payments.
2. Managing design, construction drawings, specifications and coordination with owner/consultants/ contractors.
3. Attending OAC meetings to review project status, cost, schedule and construction documents permit process.
4. Attending construction management meetings to review project outstanding issues and change orders.
5. Building and Fire Department documents plan check, bulletins including permit process.
6. Submittals, shop drawings, requests for information with logs review and approval process.
Maxwell Starkman Associates
January 1983 - July 1986
Wilshire Condominium Tower, Designer/Draftsman
10560 Wilshire Blvd., Westwood, California
New 21-story high-rise residential tower with 105 luxury units, pool, Jacuzzi and recreation facilities. Four levels of subterranean parking with 285 stalls. Total project of 160,000 sq. ft. and cost of $30,000,000.00.
Position Description:
1. Schematic, Design Development and Construction drawings.
Sheraton Grande Hotel, Designer/Draftsman
Los Angeles, California
New 8-story mixed-use, 533 guestrooms hotel with offices, including theater, restaurants, bars and ballroom facilities on a 3.78 acres site.
Position Description:
1. Schematic, Design Development and Construction drawings.
Crocker Bank Office Building, Designer/Draftsman
Long Beach, California
New 12-story high-rise bank headquarter office building with parking garage and street level connecting plaza.
Position Description:
1. Schematic, Design Development and Construction drawings.
Regional Shopping Center, Designer/Draftsman
Willow brook, California
New 1-story retail center on a 14 acre site with parking lot and landscaping.
Position Description:
1. Schematic, Design Development and Construction drawings.
Sunset Shopping Center, Designer/Draftsman
Pacific Palisades, California
New 1-story retail center (65,000 sq. ft.) with parking lot and landscaping.
Position Description:
1. Schematic, Design Development and Construction drawings.
Welton Becket
August 1981 – January 1983
Fluor Corporation Regional Headquarters, Designer/Draftsman
Houston, Texas
Master planning, design and construction documents for five multi-story headquarters’ office buildings, computer center, landscape and hardscape on a 100 acres site.
Position Description:
1. Schematic, Design Development and Construction drawings.
Rick Farber Associates
September 1980 - August 1981
Century North Condominiums, Designer/Draftsman
Century City, California
Master planning and design development for five new condominium high rise residential towers located on a 7.5 acres site with pools, Jacuzzi, recreational facilities, subterranean parking, a large lake, and landscape.
Position Description:
1. Schematic, Design Development and Construction drawings.
Benham Belare & Affiliates
January 1979 – September 1980
State Office Building, Designer/Draftsman
Sacramento, California
Competition project, commissioned by the Governor Brown, to design a new 6-story solar office building with one city block development for an outdoor amphitheater and underground computer facilities.
Position Description:
1. Schematic, Design Development and Construction drawings.
Professional Licenses
* 1996 - Architectural Registration License from California, (C - classification).
* 1992 - General Contractor Engineering and Building Licenses, (A + B - classifications).
Professional Membership
* 1996 - (AIA) American Institute of Architects.
* 1994 - (CSI) Construction Specifications Institute.
Education
* 1978 - (SCI–ARC) Southern California Institute of Architecture, (Master of Architecture).
* 1977 - (SCI–ARC) Southern California Institute of Architecture, (Bachelor of Architecture).
* 1975 - (UCLA) University of California in Los Angeles, (Bachelor of Art in Design).
* 1973 - (L.A.V.C.) Los Angeles Valley College, (Associated of Art in Engineering).
* 1971 - Hollywood High School, (Diploma).
Should you require any further information and/or professional references, please do not hesitate to contact me at your earliest convenience.
Respectfully submitted,
Sean Maghsodi, AIA, CSI
Registered Architect
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.