Executive/Senior level Preconstruction and Construction Management position with an Owner, Developer or Commercial Contractor. Exceptionally skilled at VE, Contracts, Budgets, Cost Control, Cost Forecasting and Change Orders.
Experience
2007–2008 Kitson & Partners Port Charlotte, FL
Vice President – Land Development
 Primary representative of the Owner–Developer to the design consultants, engineers, contractors, utility companies, and the various government Permitting and Entitlement agencies for the Babcock Ranch Community, a new 18,000 acre Sustainable community, with 19,500 dwelling units and 6,000,000 sf of Commercial.
 Responsible for Budgets, Schedules, Contracts, and overseeing the technical design of the various Engineers and Consultants for the DRI, ERP, and ACOE.
 Negotiated the Design-Build contract for the Water and Wastewater Treatment Plants design. Directed the consultant during design.
 Chairman of the Board of Supervisors of the Babcock Ranch Community Independent Special District, a governmental special use district.
2005–2007 Gulf Bay Construction Company Naples, FL
Vice President of Operations
 Developer-Builder of Fiddler’s Creek, a 4,000 acre master planned luxury home community.
 Responsible for construction of Multi-Family condominiums, Single Family homes; Self-Perform of Drywall, Stucco, Painting and Punch Crews; Options; and Customer Service.
 Annual Volume: $100 Million +.
 Supervised staff of 70 employees.
 Projects included: New corporate headquarters office building; 120 Multi-Family buildings with 688 condominium units; and 80 single family luxury homes.
 Processed and received 100% of Insurance Claim submitted for Hurricane Wilma.
1997–2005 WELBRO Building Corporation Orlando, FL
Operations Manager
 Project Leader, ultimately responsible for VE, Quality, Budget, Change Orders, and Schedule.
 Preconstruction to close out of Omni Orlando Resort at ChampionsGate.
 Four star luxury High Rise Hotel, $85 million, 17 Stories, 980,000 sf, 730 rooms, Convention Center, and Water Park.
 Supervised staff of 28 employees.
 Managed the Self-performed Concrete and Masonry with own crews.
 On Schedule, Under Budget, and met Owner’s expectations and standards of Quality.
 Project of the Year Award from Associated Builders and Contractors.
Senior Project Manager / Senior Preconstruction Specialist
 Preconstruction to close out of two separate Hawthorn Suites, constructed simultaneously.
 Office buildings: Tilt-Up, Precast, and Cast-in-Place Concrete.
 Remodels and Additions to operating Hotels.
 Managed the Self-Performed Concrete and Masonry with own crews.
 Best Financial Performance of any project in company history.
 Managed architects at Owner’s request as if in a Design-Build agreement.
 80% Negotiated work, open book to Owner.
1994–1997 DCC Constructors, Inc. Orlando, FL
Senior Estimator
 Multi-Family and Commercial, Negotiated and Hard-Bid.
 Design-Build cast-in-place concrete Parking Garage downtown for joint venture of city/county/church.
 Obtained Environmental Permits.
1990–1994 Tishman Construction Corp. Orlando, FL
Project Manager; Project Engineer / Estimator
 Managed and coordinated eight prime contractors inside an operating Theme Park.
 Overall project brought in Under Budget and Ahead of Schedule.
 Total responsibility for Writing the Scope of Work, Managing the Contractors, Budget and Schedule, Supervising staff, and Coordinating with the Owner’s personnel.
 Tomorrowland complete Renovation, Magic Kingdom, Walt Disney World.
 Estimated, negotiated, and settled 860 Change Orders, realizing a Savings of over $1.3 Million.
 Wetlands Mitigation, including a one million cubic yards Earth Moving project.
 Underground Utilities, Roads, Parking Lots, and “back-of-house†Office Buildings.
 Tower of Terror, Disney-MGM Studios, Walt Disney World.
1987–1990 Taylor Woodrow Construction Tampa, FL
Cost Engineer / Estimator / Project Manager
 Sarasota-Bradenton Airport - Cost Control, Change Order Negotiations, Subcontracts, and Applications for Payment; Underground Utilities and Site Work; Claims experience.
1983–1986 Rucker Construction Company Dallas, TX
Project Engineer / Project Manager
 Class “A†Office buildings, Parking Garages, large Retail, Medical Clinic; Lay out all building lines, column lines, elevations, and interior walls; Shop drawings and Submittals.
Education
1978–1982 Texas Tech University Lubbock, TX
 B.S., Construction Engineering Technology.
 Classroom and Lab Instructor, Surveying & Construction Lay out.
Other
 Florida Class “A†General Contractor’s License (inactive).
 CPR & First Aid Certified.
 Leadership Orlando through Chamber of Commerce.
 Active in local builder / developer organizations, and civic, community and church groups.
 Computer Proficient in Excel, Word, Outlook, PowerPoint, Project, SureTrak, Autodesk Buzzsaw, ConstructWare, Lotus Notes, Timberline, Builder MT, and MC2.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.